| 1 |
| |
OCID |
ocds-gyl66f-116001001-000074
|
|
Project Title |
SUPPLY OF FURNITURE AND EQUIPMENT AT THE CIVILIAN PERSONNEL UNIT BUILDING 3RD DIV. JOS, PLATEAU STAT
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
190,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
1,850,650.00
|
|
Contractor |
DPI NIG LTD
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 2 |
| |
OCID |
ocds-gyl66f-116001001-000079
|
|
Project Title |
SUPPLY OF COMPUTERS, PRINTERS AND ACCESSORIES FOR THE MINSTRY OF DEFENCE HEADQUARTERS, SHIP HOUSE,
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
190,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 3 |
| |
OCID |
ocds-gyl66f-116001001-000080
|
|
Project Title |
SUPPLY OF LAW PAVILLION HARDWARE, SOFTWARE AND INTERNET ROUTER FOR LEGAL DEPARTMENT, MINISTRY OF DEF
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
190,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
4,800,000.00
|
|
Contractor |
M/S LOKO RESOURCES NIG. LTD
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 4 |
| |
OCID |
ocds-gyl66f-116001001-000082
|
|
Project Title |
SUPPLY OF COMPUTER HARDWARE TO THE MINISTRY OF DEFENCE HEADQUARTERS, SHIP HOUSE, ABUJA
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
190,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 5 |
| |
OCID |
ocds-gyl66f-116001001-000086
|
|
Project Title |
SUPPLY AND INSTALLATION OF TWO (2) PACKAGE UNIT AIR CONDITIONERS (3 TONS) IN THE LIFTS ENGINE ROOM A
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
190,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 6 |
| |
OCID |
ocds-gyl66f-116001001-000088
|
|
Project Title |
SUPPLY OF ADULT AND PAEDIADRIC BASIC LIFE SUPPORT MANNEQUINS FOR THE MINISTRY OF DEFENCE HEADQUARTER
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
284,172,017.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
4,997,000.00
|
|
Contractor |
M/S SURE HEALTH INVESTMENT LTD
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 7 |
| |
OCID |
ocds-gyl66f-116001001-000095
|
|
Project Title |
PROCUREMENT OF INTUBATION STIMULATORS, EPISTAXIS CONTROL SIMULATORS AND ANATOMICAL MODELS (ORIT AND
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
284,172,017.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
4,900,000.00
|
|
Contractor |
TRUSTFIELD GLOBAL NETWORK
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 8 |
| |
OCID |
ocds-gyl66f-116001001-000097
|
|
Project Title |
MAINTENANCE, RECALIBERATION AND PURCHASE OF EYE EQUIPMENT FOR THE MINISTRY OF DEFENCE HEADQUARTERS,
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
284,172,017.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
4,998,000.00
|
|
Contractor |
BABADOS GLOBAL RESOURCES LTD
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 9 |
| |
OCID |
ocds-gyl66f-116001001-000106
|
|
Project Title |
PRODUCTION OF ONE HUNDRED (100) UNITS OF PLAQUE FOR THE MINISTRY OF DEFENCE HEADQUARTERS, ABUJA
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
45,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
2,500,000.00
|
|
Contractor |
M/S LUXURATE CONTRACTING SERVICES LTD
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 10 |
| |
OCID |
ocds-gyl66f-116001001-000110
|
|
Project Title |
Construction of 1 Unit of 12 Family CBQ at Giginya Barracks, Sokoto.
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
2,330,954,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
88,585,332.64
|
|
Contractor |
M/S JAMMEC WEST AFRICA
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
| 11 |
| |
OCID |
ocds-gyl66f-231001001-000024
|
|
Project Title |
URBAN RENEWAL AND SLUM UPGRADING INVOLVING PROVISION OF SOLAR POWERED BOREHOLE IN KATSINA, KATSINA S
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
9,681,313.00
NGN
|
|
Budget year |
2019
|
|
| |
Project Amount |
8,965,864.00
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 12 |
| |
OCID |
ocds-gyl66f-231001001-000026
|
|
Project Title |
HOSTING OF NATIONAL SLUM SUMMIT IN ABUJA, FCT
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
13,360,211.00
NGN
|
|
Budget year |
2019
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 13 |
| |
OCID |
ocds-gyl66f-231001001-000029
|
|
Project Title |
SERVICOM UTILITY VEHICLE
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
50,200,000.00
NGN
|
|
Budget year |
2019
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 14 |
| |
OCID |
ocds-gyl66f-231001001-000031
|
|
Project Title |
Rehabilitation of Efire-Araromi-Aiyede-Aiyela Road in Ogun State C/No 6293
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
800,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
14,405,134,473.68
|
|
Contractor |
Raynolds Construction Company Limited
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
| 15 |
| |
OCID |
ocds-gyl66f-231001001-000033
|
|
Project Title |
Rehabilitation of Babban Lamba-Sharram Road in Plateau State
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
184,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
19,392,550,107.32
|
|
Contractor |
Ric Rock Construction Nigeria Limited
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
| 16 |
| |
OCID |
ocds-gyl66f-231001001-000039
|
|
Project Title |
Construction of Isienmwenro Road/Sokponba Road, Benin City, Edo State
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
170,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
170,000,000.00
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
| 17 |
| |
OCID |
ocds-gyl66f-231001001-000041
|
|
Project Title |
Construction of 1.2km Rural Road and Drainage Lugbe by Police Junction through FHA in AMAC
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
80,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
|
|
| |
|
| 18 |
| |
OCID |
ocds-gyl66f-231001001-000045
|
|
Project Title |
Rehabilitation of Ikorodu-Shagamu Road in Lagos and Ogun States, Contract No. 6271
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
1,200,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
20,845,336,248.20
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
|
|
| |
|
| 19 |
| |
OCID |
ocds-gyl66f-231001001-000045
|
|
Project Title |
Rehabilitation of Ikorodu-Shagamu Road in Lagos and Ogun States, Contract No. 6271
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
1,200,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
20,845,336,248.20
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
|
|
| |
|
| 20 |
| |
OCID |
ocds-gyl66f-231001001-000045
|
|
Project Title |
Rehabilitation of Ikorodu-Shagamu Road in Lagos and Ogun States, Contract No. 6271
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
1,200,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
20,845,336,248.20
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
| 21 |
| |
OCID |
ocds-gyl66f-231001001-000045
|
|
Project Title |
Rehabilitation of Ikorodu-Shagamu Road in Lagos and Ogun States, Contract No. 6271
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
1,200,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
20,845,336,248.20
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
|
|
| |
|
| 22 |
| |
OCID |
ocds-gyl66f-231001001-000045
|
|
Project Title |
Rehabilitation of Ikorodu-Shagamu Road in Lagos and Ogun States, Contract No. 6271
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
1,200,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
20,845,336,248.20
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
|
|
| |
|
| 23 |
| |
OCID |
ocds-gyl66f-521027040-000002
|
|
Project Title |
PROCUREMENT OF MEDICAL/HEALTH EQUIPMENTS
|
|
| |
Procurring Entity |
NATIONAL EAR CARE CENTRE KADUNA
|
|
|
|
| |
Budget Amount |
131,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 24 |
| |
OCID |
ocds-gyl66f-222030001-000006
|
|
Project Title |
Purchase of Motor Vehicles
|
|
| |
Procurring Entity |
NIGERIAN INVESTMENT PROMOTION COMMISSION
|
|
|
|
| |
Budget Amount |
46,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 25 |
| |
OCID |
ocds-gyl66f-222030001-000008
|
|
Project Title |
Purchase of Computers
|
|
| |
Procurring Entity |
NIGERIAN INVESTMENT PROMOTION COMMISSION
|
|
|
|
| |
Budget Amount |
20,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 26 |
| |
OCID |
ocds-gyl66f-222030001-000015
|
|
Project Title |
Monitoring and Evaluation
|
|
| |
Procurring Entity |
NIGERIAN INVESTMENT PROMOTION COMMISSION
|
|
|
|
| |
Budget Amount |
113,500,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 27 |
| |
OCID |
ocds-gyl66f-116001001-000112
|
|
Project Title |
Construction of 1 Unit of 30 Family CBQ at Command and Staff College, Jaji, Kaduna.
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
2,300,954,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
205,089,241.92
|
|
Contractor |
M/S TLMB CONSTRUCTION LTD
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 28 |
| |
OCID |
ocds-gyl66f-116001001-000118
|
|
Project Title |
SUPPLY OF VBL SPARE PARTS FOR THE NIGERIAN ARMY
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
170,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 29 |
| |
OCID |
ocds-gyl66f-116001001-000126
|
|
Project Title |
ARMED FORCES COUNCIL SECRETARIAT
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
10,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 30 |
| |
OCID |
ocds-gyl66f-116001001-000128
|
|
Project Title |
Construction of 1 Unit of 14 Family CBQ at Army Barracks, Asa, Abia State.
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
2,300,954,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
124,982,084.26
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 31 |
| |
OCID |
ocds-gyl66f-116001001-000132
|
|
Project Title |
PURCHASE/ACQUISITION OF LAND (NIGERIAN AIR FORCE KADUNA
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
300,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 32 |
| |
OCID |
ocds-gyl66f-116001001-000081
|
|
Project Title |
PROCUREMENT OF COMPUTERS AND ASSESSORIES TO THE MINISTRY OF DEFENCE HEADQUARTERS, SHIP HOUSE, ABUJA
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
190,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
4,814,250.00
|
|
Contractor |
M/S UGOMEC AND ASSOCIATES
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 33 |
| |
OCID |
ocds-gyl66f-116001001-000087
|
|
Project Title |
PURCHASE OF MEDICAL EQUIPMENT FOR MINISTRY OF DEFENCE STAFF CLINIC, ABUJA, FCT
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
284,172,017.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
15,286,650.00
|
|
Contractor |
M/S FABWA ASSOCIATES LTD
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 34 |
| |
OCID |
ocds-gyl66f-116001001-000089
|
|
Project Title |
SUPPLY OF MULTI PARAMETER PATIENT MONITOR AND SYRINGE INFUSION PUMP TO THE MINSTRY OF DEFENCE HEADQU
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
284,172,017.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
4,752,000.00
|
|
Contractor |
M/S SURE HEALTH INVESTMENT LTD
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 35 |
| |
OCID |
ocds-gyl66f-116001001-000094
|
|
Project Title |
PURCHASE OF AN ADVANCED OTOSCOPY STIMULATOR TO THE MINISTRY OF DEFENCE HEADQUARTERS
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
284,172,017.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
3,570,000.00
|
|
Contractor |
WUNCO NIG LTD
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 36 |
| |
OCID |
ocds-gyl66f-116001001-000096
|
|
Project Title |
PROCUREMENT OF PREMIUM QUALITY QUALITY STARTRAC TOTAL BODY TRAINER (ELLIPTICAL) GYM EQUIPMENT AND FO
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
284,172,017.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
4,101,100.00
|
|
Contractor |
FABWA ASSOCIATES LIMITED
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 37 |
| |
OCID |
ocds-gyl66f-116001001-000103
|
|
Project Title |
PURCHASE OF THREE (3) SUKAM INVERTERS (3.0 KVA) AND ACCESSORIES TO THE MINISTRY OF DEFENCE HEADQUART
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
1,500,954,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
3,501,225.00
|
|
Contractor |
M/S TAHMID INTEGRATED RESOURCES
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 38 |
| |
OCID |
ocds-gyl66f-116001001-000105
|
|
Project Title |
PROCUREMENT OF MOD SPORTS MATERIALS TO MINISTRY OF DEFENCE HEADQUARTERS, SHIP HOUSE, GARKI, ABUJA
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
287,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 39 |
| |
OCID |
ocds-gyl66f-231001001-000025
|
|
Project Title |
URBAN RENEWAL AND SLUM UPGRADING INVOLVING PROVISION OF SOLAR POWERED BOREHOLE IN OFFA, KWARA STATE
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
9,681,313.00
NGN
|
|
Budget year |
2019
|
|
| |
Project Amount |
8,965,864.00
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 40 |
| |
OCID |
ocds-gyl66f-231001001-000030
|
|
Project Title |
Construction of Ugwueme-Nenwele-Mkwe-Ezere-Awgunta-Obeagu-Mgbidi Nmaku Road in Egunu State C/No. 634
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
1,566,800,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
6,437,166,957.38
|
|
Contractor |
Rockbridge Construction Nigeria Limited
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
| 41 |
| |
OCID |
ocds-gyl66f-231001001-000032
|
|
Project Title |
Rehabilitation of Nguru-Gashua-Bayamari Road, Section II (Nguru-Gashua) Phase II (KM30+000-KM62+000)
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
2,700,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
10,509,584,430.13
|
|
Contractor |
Mothercat Limited
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
| 42 |
| |
OCID |
ocds-gyl66f-231001001-000034
|
|
Project Title |
Reconstruction of Bida-Lambata Road in Niger State
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
600,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
33,305,001,956.57
|
|
Contractor |
CGC Nigeria Limited
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
| 43 |
| |
OCID |
ocds-gyl66f-231001001-000040
|
|
Project Title |
Rehabilitation of Auchi-Iyakpi-Weppa Road, Edo State
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
70,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
7,000,000,000.00
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
|
|
| |
|
| 44 |
| |
OCID |
ocds-gyl66f-231001001-000040
|
|
Project Title |
Rehabilitation of Auchi-Iyakpi-Weppa Road, Edo State
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
70,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
7,000,000,000.00
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
|
|
| |
|
| 45 |
| |
OCID |
ocds-gyl66f-231001001-000040
|
|
Project Title |
Rehabilitation of Auchi-Iyakpi-Weppa Road, Edo State
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
70,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
7,000,000,000.00
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
|
|
| |
|
| 46 |
| |
OCID |
ocds-gyl66f-231001001-000040
|
|
Project Title |
Rehabilitation of Auchi-Iyakpi-Weppa Road, Edo State
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
70,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
7,000,000,000.00
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
|
|
| |
|
| 47 |
| |
OCID |
ocds-gyl66f-231001001-000040
|
|
Project Title |
Rehabilitation of Auchi-Iyakpi-Weppa Road, Edo State
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
70,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
7,000,000,000.00
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
|
|
| |
|
| 48 |
| |
OCID |
ocds-gyl66f-231001001-000040
|
|
Project Title |
Rehabilitation of Auchi-Iyakpi-Weppa Road, Edo State
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
70,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
7,000,000,000.00
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
|
|
| |
|
| 49 |
| |
OCID |
ocds-gyl66f-231001001-000040
|
|
Project Title |
Rehabilitation of Auchi-Iyakpi-Weppa Road, Edo State
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
70,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
7,000,000,000.00
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
|
|
| |
|
| 50 |
| |
OCID |
ocds-gyl66f-231001001-000040
|
|
Project Title |
Rehabilitation of Auchi-Iyakpi-Weppa Road, Edo State
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
70,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
7,000,000,000.00
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
|
|
| |
|
| 51 |
| |
OCID |
ocds-gyl66f-231001001-000040
|
|
Project Title |
Rehabilitation of Auchi-Iyakpi-Weppa Road, Edo State
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
70,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
7,000,000,000.00
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
| 52 |
| |
OCID |
ocds-gyl66f-231001001-000040
|
|
Project Title |
Rehabilitation of Auchi-Iyakpi-Weppa Road, Edo State
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
70,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
7,000,000,000.00
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
|
|
| |
|
| 53 |
| |
OCID |
ocds-gyl66f-231001001-000040
|
|
Project Title |
Rehabilitation of Auchi-Iyakpi-Weppa Road, Edo State
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
70,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
7,000,000,000.00
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
|
|
| |
|
| 54 |
| |
OCID |
ocds-gyl66f-231001001-000040
|
|
Project Title |
Rehabilitation of Auchi-Iyakpi-Weppa Road, Edo State
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
70,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
7,000,000,000.00
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
|
|
| |
|
| 55 |
| |
OCID |
ocds-gyl66f-231001001-000040
|
|
Project Title |
Rehabilitation of Auchi-Iyakpi-Weppa Road, Edo State
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
70,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
7,000,000,000.00
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
|
|
| |
|
| 56 |
| |
OCID |
ocds-gyl66f-521027040-000003
|
|
Project Title |
PROCUREMENT OF UTILITY VEHICLES
|
|
| |
Procurring Entity |
NATIONAL EAR CARE CENTRE KADUNA
|
|
|
|
| |
Budget Amount |
34,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
29,909,250.00
|
|
Contractor |
GLOBE MOTORS
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
|
|
| |
|
| 57 |
| |
OCID |
ocds-gyl66f-222030001-000005
|
|
Project Title |
Procurement of 7 units, Hyundai Sonata Elite SE GLS 2.0L
|
|
| |
Procurring Entity |
NIGERIAN INVESTMENT PROMOTION COMMISSION
|
|
|
|
| |
Budget Amount |
162,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Tender Stage
|
|
Status |
|
|
| |
|
| 58 |
| |
OCID |
ocds-gyl66f-222030001-000007
|
|
Project Title |
Purchase of Office Furniture and Fittings
|
|
| |
Procurring Entity |
NIGERIAN INVESTMENT PROMOTION COMMISSION
|
|
|
|
| |
Budget Amount |
30,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 59 |
| |
OCID |
ocds-gyl66f-222030001-000009
|
|
Project Title |
Purchase of Computer Printers
|
|
| |
Procurring Entity |
NIGERIAN INVESTMENT PROMOTION COMMISSION
|
|
|
|
| |
Budget Amount |
25,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 60 |
| |
OCID |
ocds-gyl66f-222030001-000014
|
|
Project Title |
Research and Development
|
|
| |
Procurring Entity |
NIGERIAN INVESTMENT PROMOTION COMMISSION
|
|
|
|
| |
Budget Amount |
20,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 61 |
| |
OCID |
ocds-gyl66f-222030001-000016
|
|
Project Title |
Sinking fund for infrastructural Development
|
|
| |
Procurring Entity |
NIGERIAN INVESTMENT PROMOTION COMMISSION
|
|
|
|
| |
Budget Amount |
97,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 62 |
| |
OCID |
ocds-gyl66f-116001001-000111
|
|
Project Title |
Construction of 1 Unit of 12 Family CBQ at Army Barracks, Gusau.
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
2,300,954,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
88,585,332.64
|
|
Contractor |
M/S UYK NIG LTD
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
| 63 |
| |
OCID |
ocds-gyl66f-116001001-000113
|
|
Project Title |
Construction of 1 Unit of 2 Bedroom Block of 6 Flats at NAF Base, Daura, Katsina State
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
2,300,954,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
98,112,927.56
|
|
Contractor |
M/S TLMB CONSTRUCTION LTD
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
| 64 |
| |
OCID |
ocds-gyl66f-116001001-000083
|
|
Project Title |
PROCUREMENT OF OFFICE EQUIPMENT AND WORKING MATERIALS FOR THE PROCUREMENT DEPARTMENT
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
190,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
3,708,888.75
|
|
Contractor |
M/S LOKO RESOURCES NIG. LTD
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
| 65 |
| |
OCID |
ocds-gyl66f-116001001-000084
|
|
Project Title |
SUPPLY OF FIRE PROTECTION, PREVENTION AND SECURITY DEVICE TO THE MINISTRY OF DEFENCE HEADQUARTERS, S
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
190,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
640,000.00
|
|
Contractor |
M/S PRINCEHOOD CONSOLIDATED LTD
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 66 |
| |
OCID |
ocds-gyl66f-116001001-000085
|
|
Project Title |
PROCUREMENT OF INFORMATION/ COMMUNICATION/ PRESS EQUIPMENT TO THE MINSTRY OF DEFENCE HEADQUARTERS, S
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
190,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
3,813,232.50
|
|
Contractor |
M/S TUNDIS NIGERIA LIMITED
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 67 |
| |
OCID |
ocds-gyl66f-116001001-000098
|
|
Project Title |
PROCUREMENT OF NASAL DEBRIDER SET WITH SHAVING BLADE FOR THE MINISTRY OF DEFENCE HEADQUARTERS, SHIP
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
284,172,017.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
4,975,000.00
|
|
Contractor |
PACHIZUE NIG LTD
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 68 |
| |
OCID |
ocds-gyl66f-116001001-000099
|
|
Project Title |
REPAIR AND MAINTENANCE OF PHYSIOTHERAPY EQUIPMENT AND PROCUREMENT OF SCALING MACHINE FOR THE MINISTR
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
284,172,017.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
4,960,000.00
|
|
Contractor |
GABAYA NIG LTD
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 69 |
| |
OCID |
ocds-gyl66f-116001001-000100
|
|
Project Title |
PROCUREMENT OF 3-IN-1 ENDOSCOPY SET (CAMERA, CCU AND MONITOR + RECORDER) FOR THE MINISTRY OF DEFENCE
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
284,172,017.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
0.00
|
|
Contractor |
AFRIBASED PROJECTS LIMITED
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
|
|
| |
|
| 70 |
| |
OCID |
ocds-gyl66f-116001001-000101
|
|
Project Title |
THE SURVEY, EVALUATION AND ASSESSMENT, METERING DEPLOYMENT, CABLING, INSTALLATION OF ACCESSORIES/ SE
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
250,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
236,995,800.00
|
|
Contractor |
MOMAS ELECTRICITY METERS MANUFACTURING COMPANY
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 71 |
| |
OCID |
ocds-gyl66f-116001001-000102
|
|
Project Title |
SUPPLY OF ALTERNATIVE POWER SOURCE FOR MOD - STAFF CLINIC
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
1,500,954,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
14,931,000.00
|
|
Contractor |
M/S TRUSTFIELD GLOBAL NETWORK
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 72 |
| |
OCID |
ocds-gyl66f-231001001-000042
|
|
Project Title |
Construction of 1.3km Rural Road and Drainage in Jikwoyi Phase 1 in AMAC
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
80,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
8,000,000,000.00
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
| 73 |
| |
OCID |
ocds-gyl66f-231001001-000042
|
|
Project Title |
Construction of 1.3km Rural Road and Drainage in Jikwoyi Phase 1 in AMAC
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
80,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
8,000,000,000.00
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
|
|
| |
|
| 74 |
| |
OCID |
ocds-gyl66f-231001001-000042
|
|
Project Title |
Construction of 1.3km Rural Road and Drainage in Jikwoyi Phase 1 in AMAC
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
80,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
8,000,000,000.00
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
|
|
| |
|
| 75 |
| |
OCID |
ocds-gyl66f-231001001-000042
|
|
Project Title |
Construction of 1.3km Rural Road and Drainage in Jikwoyi Phase 1 in AMAC
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
80,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
8,000,000,000.00
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
|
|
| |
|
| 76 |
| |
OCID |
ocds-gyl66f-231001001-000042
|
|
Project Title |
Construction of 1.3km Rural Road and Drainage in Jikwoyi Phase 1 in AMAC
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
80,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
8,000,000,000.00
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
|
|
| |
|
| 77 |
| |
OCID |
ocds-gyl66f-231001001-000043
|
|
Project Title |
Repairs of failed Section of Apapa-Ijora Flyover and Approach Road by Leventis in Lagos (Apap-Ijora
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
614,023,533.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
449,079,139.95
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
|
|
| |
|
| 78 |
| |
OCID |
ocds-gyl66f-231001001-000043
|
|
Project Title |
Repairs of failed Section of Apapa-Ijora Flyover and Approach Road by Leventis in Lagos (Apap-Ijora
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
614,023,533.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
449,079,139.95
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
| 79 |
| |
OCID |
ocds-gyl66f-231001001-000043
|
|
Project Title |
Repairs of failed Section of Apapa-Ijora Flyover and Approach Road by Leventis in Lagos (Apap-Ijora
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
614,023,533.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
449,079,139.95
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
|
|
| |
|
| 80 |
| |
OCID |
ocds-gyl66f-231001001-000043
|
|
Project Title |
Repairs of failed Section of Apapa-Ijora Flyover and Approach Road by Leventis in Lagos (Apap-Ijora
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
614,023,533.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
449,079,139.95
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
|
|
| |
|
| 81 |
| |
OCID |
ocds-gyl66f-231001001-000044
|
|
Project Title |
Reconstruction of Magami-Kwajale-Ningi Road in Bauchi State (Contract No. 6411)
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
434,400,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
|
|
| |
|
| 82 |
| |
OCID |
ocds-gyl66f-222030001-000010
|
|
Project Title |
Purchase of Photocopying Machines
|
|
| |
Procurring Entity |
NIGERIAN INVESTMENT PROMOTION COMMISSION
|
|
|
|
| |
Budget Amount |
5,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 83 |
| |
OCID |
ocds-gyl66f-222030001-000011
|
|
Project Title |
Purchase of Shredding Machines
|
|
| |
Procurring Entity |
NIGERIAN INVESTMENT PROMOTION COMMISSION
|
|
|
|
| |
Budget Amount |
1,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 84 |
| |
OCID |
ocds-gyl66f-222030001-000012
|
|
Project Title |
Computer software acquisition
|
|
| |
Procurring Entity |
NIGERIAN INVESTMENT PROMOTION COMMISSION
|
|
|
|
| |
Budget Amount |
58,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 85 |
| |
OCID |
ocds-gyl66f-222030001-000013
|
|
Project Title |
Rehabilitation and Repairs of Office Buildings
|
|
| |
Procurring Entity |
NIGERIAN INVESTMENT PROMOTION COMMISSION
|
|
|
|
| |
Budget Amount |
40,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 86 |
| |
OCID |
ocds-gyl66f-116001001-000114
|
|
Project Title |
Construction of 1 Unit of 3 Bedroom Block of 6 flats at Army Barracks, Shadawanka, Bauchi.
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
2,300,954,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
123,077,376.63
|
|
Contractor |
M/S CLEMS & OK SYNERGY LTD
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
| 87 |
| |
OCID |
ocds-gyl66f-116001001-000115
|
|
Project Title |
Construction of 1 Unit of 2 Bedroom Block of 6 flats at NAF Base, Yola, Adamawa State.
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
2,300,954,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
109,865,367.22
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 88 |
| |
OCID |
ocds-gyl66f-116001001-000116
|
|
Project Title |
Construction of 1 Unit of 12 Family CBQ at Army Barracks, Gombe, Gombe State.
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
2,300,954,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
80,319,311.14
|
|
Contractor |
Fadil and Farida Inv & Property Ltd
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 89 |
| |
OCID |
ocds-gyl66f-116001001-000117
|
|
Project Title |
Construction of 1 Unit of 14 Family CBQ at Army Barracks, Biu, Borno State.
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
2,300,954,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
115,096,709.42
|
|
Contractor |
Al-Amir Int'l Nig.Ltd
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 90 |
| |
OCID |
ocds-gyl66f-116001001-000129
|
|
Project Title |
Construction of 1 Unit of 3 Bedroom Block of 6 flats at Nwagu Barracks, Abakaliki, Ebonyi State.
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
2,300,954,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
114,921,400.28
|
|
Contractor |
LIARA NIG LIMITED
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
| 91 |
| |
OCID |
ocds-gyl66f-116001001-000130
|
|
Project Title |
Construction of 1 Unit of 12 Family CBQ at Army Barracks, Onitsha, Anambra State.
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
2,300,954,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
99,770,594.20
|
|
Contractor |
BELSA'AD GLOBAL SERVICES LTD
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
| 92 |
| |
OCID |
ocds-gyl66f-116001001-000131
|
|
Project Title |
Construction of 1 Unit of 12 Family CBQ at NAF Base, Enugu.
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
2,300,954,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
99,817,849.09
|
|
Contractor |
M/S I.C.O ENGINEERING CONSULT LIMITED
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 93 |
| |
OCID |
ocds-gyl66f-116001001-000075
|
|
Project Title |
SUPPLY OF FURNITURE AND EQUIPMENT AT THE CIVILIAN PERSONNEL UNIT BUILDING MILITARY HOSPITAL BENIN, E
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
190,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
2,103,547.50
|
|
Contractor |
M/S CLET AND CLETTA NIG LTD
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 94 |
| |
OCID |
ocds-gyl66f-116001001-000076
|
|
Project Title |
SUPPLY OF OFFICE EQUIPMENT TO THE MINISTRY OF DEFENCE HEADQUARTERS
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
190,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Tender Stage
|
|
Status |
|
|
| |
|
| 95 |
| |
OCID |
ocds-gyl66f-116001001-000077
|
|
Project Title |
SUPPLY OF STATIONERIES, COMPUTER SYSTEMS (WITH ACCESSORIES) AND PRINTERS FOR SERVICOM UNITS IN THE C
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
190,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 96 |
| |
OCID |
ocds-gyl66f-116001001-000078
|
|
Project Title |
PROCUREMENT OF OFFICE EQUIPMENT AND ACCESSORIES FOR THE MINSTRY OF DEFENCE HEADQUARTERS, SHIP HOUSE,
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
190,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
4,576,120.50
|
|
Contractor |
M/S BILA CON LTD
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 97 |
| |
OCID |
ocds-gyl66f-116001001-000090
|
|
Project Title |
SUPPLY OF MIDDLE EAR ANALYSER TO THE MINSTRY OF DEFENCE HEADQUARTERS, SHIP HOUSE, ABUJA
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
284,172,017.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
4,992,000.00
|
|
Contractor |
BARUCH-ARIS WORKS LTD
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 98 |
| |
OCID |
ocds-gyl66f-116001001-000091
|
|
Project Title |
SUPPLY OF PACHYMETER TO THE MINSTRY OF DEFENCE HEADQUARTERS, SHIP HOUSE, ABUJA
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
284,172,017.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
4,996,000.00
|
|
Contractor |
FLOCHA COMPANY LTD
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 99 |
| |
OCID |
ocds-gyl66f-116001001-000093
|
|
Project Title |
PROCUREMENT OF DIATHERMY MACHINE (MONOPOLAR AND BIPOLAR) FOR THE MINISTRY OF DEFENCE HEADQUARTERS, S
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
284,172,017.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
4,900,000.00
|
|
Contractor |
BABADOS GLOBAL RESOURCES LTD
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 100 |
| |
OCID |
ocds-gyl66f-116001001-000107
|
|
Project Title |
CONSTRUCTION OF DISABLED ENTRANCE RAMP AT THE MINSTRY OF DEFENCE HEADQUARTERS, SHIP HOUSE, ABUJA
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
949,000,029.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
55,373,877.17
|
|
Contractor |
M/S BENGABSON ENTERPRISESLTD
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 101 |
| |
OCID |
ocds-gyl66f-116001001-000108
|
|
Project Title |
PUBLIC PROCUREMENT TRAINING OF25 NOS. OFFICERS INVOLVED IN THE PROCUREMENT VALUE CHAIN
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
38,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
2,500,000.00
|
|
Contractor |
M/S A4 ASSOCIATES LTD
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 102 |
| |
OCID |
ocds-gyl66f-116001001-000109
|
|
Project Title |
Construction of 1 Unit of 3 Bedroom Block of 6 flats at Army Barracks Natsinta, Katsina.
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
2,300,954,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
108,620,747.57
|
|
Contractor |
M/S DAN ADIDA
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
| 103 |
| |
OCID |
ocds-gyl66f-231001001-000027
|
|
Project Title |
PURCHASE OF PHOTOCOPIERS, PRINTERS, SCANNERS & COMPUTERS FOR EFFECTIVE EXECUTION OF ASSIGNMENT
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
6,680,105.00
NGN
|
|
Budget year |
2019
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 104 |
| |
OCID |
ocds-gyl66f-231001001-000028
|
|
Project Title |
PURCHASE OF PROJECT VEHICLES OF 1NO. TOYOTA HILUX AND 1NO TOYOTA HAICE BUS FOR PROPER SUPERVISION AN
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
40,080,635.00
NGN
|
|
Budget year |
2019
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 105 |
| |
OCID |
ocds-gyl66f-231001001-000035
|
|
Project Title |
Reconstruction of Sumaila-Falali-Birnin Bako-Bauchi State Border Road in Kano State, Contract No. 62
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
900,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
4,578,813,522.36
|
|
Contractor |
Spectrum Engineering Limited
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
| 106 |
| |
OCID |
ocds-gyl66f-231001001-000036
|
|
Project Title |
Construction of Road in Odogbe, Esan Central LGA in Edo State
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
100,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
100,000,000.00
|
|
Contractor |
Nugi Limited
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
| 107 |
| |
OCID |
ocds-gyl66f-231001001-000037
|
|
Project Title |
Rehabilitation of Nasty Road Ewu in Edo State
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
230,700,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
230,700,000.00
|
|
Contractor |
Adland Projects Nigeria Limited
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
| 108 |
| |
OCID |
ocds-gyl66f-231001001-000038
|
|
Project Title |
Rehabilitation of Irrua-Ibore, Afuda, Udomi –Ohe Road and Drains in Edo State
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
294,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
294,000,000.00
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
| 109 |
| |
OCID |
ocds-gyl66f-222030001-000001
|
|
Project Title |
Supply of year end Ex-Gratia Items for staff of NIPC
|
|
| |
Procurring Entity |
NIGERIAN INVESTMENT PROMOTION COMMISSION
|
|
|
|
| |
Budget Amount |
6,271,700.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Tender Stage
|
|
Status |
|
|
| |
|
| 110 |
| |
OCID |
ocds-gyl66f-222030001-000002
|
|
Project Title |
Procurement and installation of Unified Communication Systems
|
|
| |
Procurring Entity |
NIGERIAN INVESTMENT PROMOTION COMMISSION
|
|
|
|
| |
Budget Amount |
23,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Tender Stage
|
|
Status |
|
|
| |
|
| 111 |
| |
OCID |
ocds-gyl66f-222030001-000003
|
|
Project Title |
Procurement and installation of Solar Security, Light and Accessories
|
|
| |
Procurring Entity |
NIGERIAN INVESTMENT PROMOTION COMMISSION
|
|
|
|
| |
Budget Amount |
15,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Tender Stage
|
|
Status |
|
|
| |
|
| 112 |
| |
OCID |
ocds-gyl66f-222030001-000004
|
|
Project Title |
Procurement of 6 units, Nissan Pick-up NP300 2.4L Double Cab 4WD MT
|
|
| |
Procurring Entity |
NIGERIAN INVESTMENT PROMOTION COMMISSION
|
|
|
|
| |
Budget Amount |
162,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Tender Stage
|
|
Status |
|
|
| |
|
| 113 |
| |
OCID |
ocds-gyl66f-231001001-000046
|
|
Project Title |
Construction of Sabon Birnin-Tsululu-Kuya-Maradi Junction Road in Sokoto State, Contract No. 6462
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
950,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
435,474,652.87
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
| 114 |
| |
OCID |
ocds-gyl66f-231001001-000046
|
|
Project Title |
Construction of Sabon Birnin-Tsululu-Kuya-Maradi Junction Road in Sokoto State, Contract No. 6462
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
950,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
435,474,652.87
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
|
|
| |
|
| 115 |
| |
OCID |
ocds-gyl66f-231001001-000046
|
|
Project Title |
Construction of Sabon Birnin-Tsululu-Kuya-Maradi Junction Road in Sokoto State, Contract No. 6462
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
950,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
435,474,652.87
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
|
|
| |
|
| 116 |
| |
OCID |
ocds-gyl66f-116001001-000120
|
|
Project Title |
Construction of 1 Unit of 1,200 Capacity Auditorium, NAFRC, Oshodi.
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
2,300,954,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
105,588,903.89
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 117 |
| |
OCID |
ocds-gyl66f-116001001-000121
|
|
Project Title |
PURCHASE OF VERTA ARMOURD PERSONNEL CARRIER (UKRAINIAN ARMOUR)
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
460,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 118 |
| |
OCID |
ocds-gyl66f-116001001-000122
|
|
Project Title |
Construction of 1 Unit of 12 Family CBQ at NN Apapa, Lagos.
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
2,300,954,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
99,530,396.07
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
| 119 |
| |
OCID |
ocds-gyl66f-116001001-000123
|
|
Project Title |
Construction of 1 Unit of 14 Family CBQ at Owena Barracks, Akure, Ondo State.
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
2,300,954,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
125,077,703.57
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 120 |
| |
OCID |
ocds-gyl66f-116001001-000124
|
|
Project Title |
Construction of 1 Unit of 3 Bedroom Block of 6 flats at NNS Pathfinder, Port Harcourt.
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
2,300,954,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
138,331,336.41
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
| 121 |
| |
OCID |
ocds-gyl66f-116001001-000136
|
|
Project Title |
EQUIPPING OF LAW LIBRARY
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
25,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 122 |
| |
OCID |
ocds-gyl66f-116001001-000137
|
|
Project Title |
PURCHASE OF PROJECT VEHICLES
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
270,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 123 |
| |
OCID |
ocds-gyl66f-116001001-000119
|
|
Project Title |
Construction of 1 Unit of 3 Bedroom Block of 6 flats at NAF Base, Shasha, Lagos.
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
2,300,954,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
132,155,611.11
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 124 |
| |
OCID |
ocds-gyl66f-116001001-000125
|
|
Project Title |
Construction of 1 Unit of 2 Bedroom Block of 6 flats at NNS Yenagoa, Bayelsa State.
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
2,300,954,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
109,099,994.99
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 125 |
| |
OCID |
ocds-gyl66f-116001001-000127
|
|
Project Title |
Construction of 1 Unit of 12 Family CBQ at NN Atimbo Barracks, Calabar.
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
2,300,954,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
100,713,741.34
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
| 126 |
| |
OCID |
ocds-gyl66f-116001001-000133
|
|
Project Title |
Construction of 3 Units of 2 Bedroom (Twin) SNCO at Army Barracks Gombe
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
300,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
55,325,763.76
|
|
Contractor |
M/S QUADSTAR SOLID GEN. SERVICES
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 127 |
| |
OCID |
ocds-gyl66f-116001001-000135
|
|
Project Title |
TENDER PROCESSESS AND ADVERTISEMENT OF CAPITAL PROJECTS AND RECURRENT PROCUREMENT
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
50,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 128 |
| |
OCID |
ocds-gyl66f-116001001-000139
|
|
Project Title |
Rehabilitation of 7 Units of MOQ (3 Bedroom Bungalow) at Army Barracks, Biu
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
300,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
68,972,439.00
|
|
Contractor |
M/S MAIWADA GLOBAL CONC. LTD
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 129 |
| |
OCID |
ocds-gyl66f-220002001-000016
|
|
Project Title |
Utilities General
|
|
| |
Procurring Entity |
DEBT MANAGEMENT OFFICE
|
|
|
|
| |
Budget Amount |
2,694,500.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
2,694,500.00
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 130 |
| |
OCID |
ocds-gyl66f-116001001-000142
|
|
Project Title |
Rehabilitation of 5 Units of 2 Bedroom (Twin) SNCO at Bokabo Army Barracks, Kano.
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
300,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
54,823,069.93
|
|
Contractor |
Streamline Properties Ltd
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
| 131 |
| |
OCID |
ocds-gyl66f-116001001-000144
|
|
Project Title |
Rehabilitation of 2 Units of 12 Family CBQ at Obinze Barracks, Imo State
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
300,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
69,084.00
|
|
Contractor |
ELEKU CONSTRUCTION LTD
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 132 |
| |
OCID |
ocds-gyl66f-231001001-000048
|
|
Project Title |
Rehabilitation of Gwoza-Damboa-Goniri-Ngamdu Road in Yobe/Borno States, Contract No. 6449
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
200,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
34,608,285,182.52
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
| 133 |
| |
OCID |
ocds-gyl66f-231001001-000050
|
|
Project Title |
Rehabilitation of Old Enugu-Port Harcourt Road (Agbogugu-Abia Border Spur to Mmaku), Contract No. 64
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
500,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
13,933,953,708.62
|
|
Contractor |
13,933,953,708.62
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
|
|
| |
|
| 134 |
| |
OCID |
ocds-gyl66f-231001001-000050
|
|
Project Title |
Rehabilitation of Old Enugu-Port Harcourt Road (Agbogugu-Abia Border Spur to Mmaku), Contract No. 64
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
500,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
13,933,953,708.62
|
|
Contractor |
13,933,953,708.62
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
| 135 |
| |
OCID |
ocds-gyl66f-231001001-000058
|
|
Project Title |
Construction of Bridge and Expansion of Bussa – Monnai and Yuna Road in Niger North Senatorial Distr
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
50,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
|
|
| |
|
| 136 |
| |
OCID |
ocds-gyl66f-231001001-000065
|
|
Project Title |
Construction of 2Nos Bridges (Nata'ala/Tsaiburawa) including Burum Burum - Sith Road
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
1,547,200,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
|
|
| |
|
| 137 |
| |
OCID |
ocds-gyl66f-231001001-000067
|
|
Project Title |
Installation of Street Lights on Abuja – Kaduna Road, Old Toll Gate, Kaduna (Phase III)
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
50,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
44,829,028.13
|
|
Contractor |
Ama-Yaro Associates Ltd
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 138 |
| |
OCID |
ocds-gyl66f-231001001-000074
|
|
Project Title |
Installation of Street Lights on Abuja – Abaji – Lokoja Expressway, Giri Interchange
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
125,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
107,349,218.70
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
| 139 |
| |
OCID |
ocds-gyl66f-231001001-000076
|
|
Project Title |
Provision of Illuminated Road Sign in Six (6) Geographical Zones
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
110,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
110,000,000.00
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
| 140 |
| |
OCID |
ocds-gyl66f-231001001-000081
|
|
Project Title |
Rehabilitation of Street Lights on Numan Bridge, Yola, Adamawa
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
100,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
69,399,483.00
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 141 |
| |
OCID |
ocds-gyl66f-231001001-000083
|
|
Project Title |
Reclamation of Surrounding and Renovation/Rehabilitation of Electrical Workshop Building at Federal
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
70,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
|
|
| |
|
| 142 |
| |
OCID |
ocds-gyl66f-228068001-000007
|
|
Project Title |
Procurement of Furniture for Laboratory and Offices
|
|
| |
Procurring Entity |
NATIONAL CENTRE FOR ENERGY EFFICIENCY AND CONSERVATIVE,UNIVERSITY OF LAGOS.
|
|
|
|
| |
Budget Amount |
20,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 143 |
| |
OCID |
ocds-gyl66f-238005001-000007
|
|
Project Title |
REHABILITATION OF WATER WORKS EQUIPMENT (11Nos.) WATER TANKS AND PURCHASE OF 2 Nos. PUMPING MACHINE
|
|
| |
Procurring Entity |
BUDGET OFFICE OF THE FEDERATION
|
|
|
|
| |
Budget Amount |
3,500,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 144 |
| |
OCID |
ocds-gyl66f-124007001-000004
|
|
Project Title |
Supply of 6 Nos Water Tankers with Fire Pumps mounted behind
|
|
| |
Procurring Entity |
FEDERAL FIRE SERVICE
|
|
|
|
| |
Budget Amount |
2,800,172,273.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 145 |
| |
OCID |
ocds-gyl66f-124007001-000006
|
|
Project Title |
supply 1 No. Mobile Mechanic Workshop
|
|
| |
Procurring Entity |
FEDERAL FIRE SERVICE
|
|
|
|
| |
Budget Amount |
2,800,172,273.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 146 |
| |
OCID |
ocds-gyl66f-124007001-000011
|
|
Project Title |
Design & Construction of Parking Lots (60 Lot capacity with street lighting)
|
|
| |
Procurring Entity |
FEDERAL FIRE SERVICE
|
|
|
|
| |
Budget Amount |
1,203,519,499.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 147 |
| |
OCID |
ocds-gyl66f-124007001-000019
|
|
Project Title |
Development and Implementation of Training Program for the Federal Fire Service
|
|
| |
Procurring Entity |
FEDERAL FIRE SERVICE
|
|
|
|
| |
Budget Amount |
73,111,583.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 148 |
| |
OCID |
ocds-gyl66f-124007001-000020
|
|
Project Title |
Renovation of FFS, Surulere Barracks, Lagos
|
|
| |
Procurring Entity |
FEDERAL FIRE SERVICE
|
|
|
|
| |
Budget Amount |
1,203,519,499.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 149 |
| |
OCID |
ocds-gyl66f-124007001-000021
|
|
Project Title |
Renovation of FFS, Ebute-Meta Barracks, Lagos
|
|
| |
Procurring Entity |
FEDERAL FIRE SERVICE
|
|
|
|
| |
Budget Amount |
1,203,519,499.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 150 |
| |
OCID |
ocds-gyl66f-124007001-000022
|
|
Project Title |
Upgrade and Hold Stakeholders Workshop on the Use of National Fire Data Repository Consoles for Fede
|
|
| |
Procurring Entity |
FEDERAL FIRE SERVICE
|
|
|
|
| |
Budget Amount |
306,279,948.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 151 |
| |
OCID |
ocds-gyl66f-124007001-000027
|
|
Project Title |
12 NO. PICK UP VANS
|
|
| |
Procurring Entity |
FEDERAL FIRE SERVICE
|
|
|
|
| |
Budget Amount |
2,800,172,273.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 152 |
| |
OCID |
ocds-gyl66f-116001001-000148
|
|
Project Title |
Rehabilitation of 1 Unit of 30 Family at Awkunanaw Barracks, Enugu.
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
300,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
75,345,127.52
|
|
Contractor |
BASTRUCT NIG LTD
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 153 |
| |
OCID |
ocds-gyl66f-116001001-000150
|
|
Project Title |
FURNISHING OF MOD SHIP HOUSE (DIRECTORS, DDs, Ads AND OTHER PRINCIPAL OFFICERS (ON-GOING)
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
300,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 154 |
| |
OCID |
ocds-gyl66f-220002001-000018
|
|
Project Title |
Maintenance Services General
|
|
| |
Procurring Entity |
DEBT MANAGEMENT OFFICE
|
|
|
|
| |
Budget Amount |
4,151,356.20
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
5,890,946.00
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 155 |
| |
OCID |
ocds-gyl66f-116001001-000143
|
|
Project Title |
Rehabilitation of 1 Unit of 36 Family CBQ at Mambila Barracks 1
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
300,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
70,214,629.21
|
|
Contractor |
JAJI M.M. NIG. LTD
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 156 |
| |
OCID |
ocds-gyl66f-220002001-000017
|
|
Project Title |
Consulting and Professional Service General
|
|
| |
Procurring Entity |
DEBT MANAGEMENT OFFICE
|
|
|
|
| |
Budget Amount |
4,633,990.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 157 |
| |
OCID |
ocds-gyl66f-116001001-000146
|
|
Project Title |
Construction of 1 Unit of 1 Bedroom 10 Family CBQ 176 Barracks, Gwagwalada
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
300,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
65,096,319.83
|
|
Contractor |
Coci Engr. Co. Ltd
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
| 158 |
| |
OCID |
ocds-gyl66f-231001001-000051
|
|
Project Title |
Rehabilitation of Umulungbe-Umuoka-Amokwu-Ikedimpkpe Egede-Ojieyi-Awhum Road in Enugu State, Contrac
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
400,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
6,245,100,307.91
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
| 159 |
| |
OCID |
ocds-gyl66f-231001001-000051
|
|
Project Title |
Rehabilitation of Umulungbe-Umuoka-Amokwu-Ikedimpkpe Egede-Ojieyi-Awhum Road in Enugu State, Contrac
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
400,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
6,245,100,307.91
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
|
|
| |
|
| 160 |
| |
OCID |
ocds-gyl66f-231001001-000051
|
|
Project Title |
Rehabilitation of Umulungbe-Umuoka-Amokwu-Ikedimpkpe Egede-Ojieyi-Awhum Road in Enugu State, Contrac
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
400,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
6,245,100,307.91
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
|
|
| |
|
| 161 |
| |
OCID |
ocds-gyl66f-231001001-000052
|
|
Project Title |
Construction of 4-Span Inana Bridge at CH. 11 + 350 Along Kontagora – Gulbin Boka – Sambo – Inana –
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
285,609,413.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
497,547,261.75
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
| 162 |
| |
OCID |
ocds-gyl66f-231001001-000053
|
|
Project Title |
Construction of Pedestrian Bridge at KM 49 + 000 along Lokoja – Benin Road, Ogaminana in Adavi LGA,
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
70,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
69,994,050.00
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
| 163 |
| |
OCID |
ocds-gyl66f-231001001-000054
|
|
Project Title |
Emergency Repairs of failed Section of Ifaki – Ido Road, Ekiti State
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
100,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
133,627,987.50
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
| 164 |
| |
OCID |
ocds-gyl66f-231001001-000055
|
|
Project Title |
Rehabilitation/Construction of Ossomala –Ogwuikpele – Ase – Ndoni Road
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
500,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
468,500,000.00
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
| 165 |
| |
OCID |
ocds-gyl66f-231001001-000069
|
|
Project Title |
Rehabilitation of Street Lights on Benin Interchange
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
65,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
|
|
| |
|
| 166 |
| |
OCID |
ocds-gyl66f-231001001-000070
|
|
Project Title |
Rehabilitation of Street Lights on Sapele – Benin Interchange, Benin End
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
75,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
66,612,461.00
|
|
Contractor |
Heridem Worldwide Limited
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 167 |
| |
OCID |
ocds-gyl66f-231001001-000071
|
|
Project Title |
Installation of Street Lights on Ibadan – Ilorin Expressway, Ogbomosho Interchange (Phase III)
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
150,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
|
|
| |
|
| 168 |
| |
OCID |
ocds-gyl66f-231001001-000072
|
|
Project Title |
Rehabilitation of Street Lights on Murtala Muhammed Bridge, Lokoja Abuja Road, Lokoja
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
30,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
29,332,012.50
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
| 169 |
| |
OCID |
ocds-gyl66f-231001001-000072
|
|
Project Title |
Rehabilitation of Street Lights on Murtala Muhammed Bridge, Lokoja Abuja Road, Lokoja
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
30,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
29,332,012.50
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
|
|
| |
|
| 170 |
| |
OCID |
ocds-gyl66f-238005001-000008
|
|
Project Title |
PURCHASE OF ANTIVIRUS
|
|
| |
Procurring Entity |
BUDGET OFFICE OF THE FEDERATION
|
|
|
|
| |
Budget Amount |
4,370,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 171 |
| |
OCID |
ocds-gyl66f-124007001-000007
|
|
Project Title |
Design & Construction of H/Q Fencing work
|
|
| |
Procurring Entity |
FEDERAL FIRE SERVICE
|
|
|
|
| |
Budget Amount |
1,203,519,499.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 172 |
| |
OCID |
ocds-gyl66f-124007001-000008
|
|
Project Title |
supply of 1 No. Towing Vehicle
|
|
| |
Procurring Entity |
FEDERAL FIRE SERVICE
|
|
|
|
| |
Budget Amount |
2,800,172,273.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 173 |
| |
OCID |
ocds-gyl66f-124007001-000009
|
|
Project Title |
PROCUREMENT OF COMMUNICATION EQUIPMENT
|
|
| |
Procurring Entity |
FEDERAL FIRE SERVICE
|
|
|
|
| |
Budget Amount |
65,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 174 |
| |
OCID |
ocds-gyl66f-124007001-000010
|
|
Project Title |
Design & Construction of Access Road (NFA, Sheda)
|
|
| |
Procurring Entity |
FEDERAL FIRE SERVICE
|
|
|
|
| |
Budget Amount |
1,203,519,499.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 175 |
| |
OCID |
ocds-gyl66f-124007001-000018
|
|
Project Title |
Renovation of FFS, Apapa Barracks, Lagos
|
|
| |
Procurring Entity |
FEDERAL FIRE SERVICE
|
|
|
|
| |
Budget Amount |
1,203,519,499.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 176 |
| |
OCID |
ocds-gyl66f-124007001-000024
|
|
Project Title |
20 NOS FIRE FIGHTING TENDERS(VEHICLES) OF 5000 LTRS WATER TANK CAPACITY
|
|
| |
Procurring Entity |
FEDERAL FIRE SERVICE
|
|
|
|
| |
Budget Amount |
2,800,172,273.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 177 |
| |
OCID |
ocds-gyl66f-220006001-000001
|
|
Project Title |
Procurement of Generations
|
|
| |
Procurring Entity |
INVESTMENT AND SECURITIES TRIBUNAL
|
|
|
|
| |
Budget Amount |
50,000,000.00
NGN
|
|
Budget year |
2019
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 178 |
| |
OCID |
ocds-gyl66f-124007001-000025
|
|
Project Title |
1 NO. WATER/FOAM FIRE FIGHTING TENDERS(VEHICLES) WITH 7,500 LTRS AND 1000LTRS (FOAM) TANK CAPACITIES
|
|
| |
Procurring Entity |
FEDERAL FIRE SERVICE
|
|
|
|
| |
Budget Amount |
2,800,172,273.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 179 |
| |
OCID |
ocds-gyl66f-220006001-000002
|
|
Project Title |
Procurement of Vehicles
|
|
| |
Procurring Entity |
INVESTMENT AND SECURITIES TRIBUNAL
|
|
|
|
| |
Budget Amount |
1,025,000,000.00
NGN
|
|
Budget year |
2019
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 180 |
| |
OCID |
ocds-gyl66f-124007001-000029
|
|
Project Title |
Renovation of Existing Three (3) BedroomBlocks of Flats (NFA, Sheda), Abuja
|
|
| |
Procurring Entity |
FEDERAL FIRE SERVICE
|
|
|
|
| |
Budget Amount |
1,203,519,499.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 181 |
| |
OCID |
ocds-gyl66f-521027002-000001
|
|
Project Title |
Medical outreach in Eket, ONNA, Esit-eket, Ibeno federal constituency
|
|
| |
Procurring Entity |
UNIVERSITY OF UYO TEACHING HOSPITAL
|
|
|
|
| |
Budget Amount |
20,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 182 |
| |
OCID |
ocds-gyl66f-116001001-000147
|
|
Project Title |
Rehabilitation of 2 Units of 12 Family CBQ at Nwagu Barracks, Ebonyi State.
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
300,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
69,084,891.96
|
|
Contractor |
AYFIR CONSTRUCTION NIG LTD
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 183 |
| |
OCID |
ocds-gyl66f-220002001-000019
|
|
Project Title |
Financial Charges General
|
|
| |
Procurring Entity |
DEBT MANAGEMENT OFFICE
|
|
|
|
| |
Budget Amount |
154,665.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 184 |
| |
OCID |
ocds-gyl66f-220002001-000020
|
|
Project Title |
Fuel and Lubricant General
|
|
| |
Procurring Entity |
DEBT MANAGEMENT OFFICE
|
|
|
|
| |
Budget Amount |
1,195,920.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 185 |
| |
OCID |
ocds-gyl66f-116001001-000159
|
|
Project Title |
CONSTRUCTION OF 1 UNIT ZONAL EDUCATIONAL INSPECTORATE OFFICES IN KADUNA
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
250,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
164,158,735.00
|
|
Contractor |
AYAN GLOBAL RESOURCES LIMITED
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 186 |
| |
OCID |
ocds-gyl66f-116001001-000162
|
|
Project Title |
REHABILITATION OF MILITARY CEMETERY IN PORT HARCOURT
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
40,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
18,945,181.50
|
|
Contractor |
M/S NIPHEMY SOLUTIONS
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 187 |
| |
OCID |
ocds-gyl66f-116001001-000163
|
|
Project Title |
RENOVATION OF MOD CPU, BONNY CAMP (81 DIV.) VI, LAGOS
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
80,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
76,353,165.43
|
|
Contractor |
M/S GENERALVIEW LTD
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
| 188 |
| |
OCID |
ocds-gyl66f-220002001-000015
|
|
Project Title |
Miscellaneous Expenses General
|
|
| |
Procurring Entity |
DEBT MANAGEMENT OFFICE
|
|
|
|
| |
Budget Amount |
14,153,091.60
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
14,636,638.00
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 189 |
| |
OCID |
ocds-gyl66f-220002001-000015
|
|
Project Title |
Miscellaneous Expenses General
|
|
| |
Procurring Entity |
DEBT MANAGEMENT OFFICE
|
|
|
|
| |
Budget Amount |
14,153,091.60
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
14,153,091.00
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
|
|
| |
|
| 190 |
| |
OCID |
ocds-gyl66f-220002001-000015
|
|
Project Title |
Miscellaneous Expenses General
|
|
| |
Procurring Entity |
DEBT MANAGEMENT OFFICE
|
|
|
|
| |
Budget Amount |
14,153,091.60
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
14,636,638.00
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
|
|
| |
|
| 191 |
| |
OCID |
ocds-gyl66f-116001001-000138
|
|
Project Title |
Construction of 2 Units of 2 Bedroom (Twin) SNCO at Army Barracks, Bauchi.
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
300,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
33,111,749.86
|
|
Contractor |
M/S SAHAD INVESTMENT LTD
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 192 |
| |
OCID |
ocds-gyl66f-116001001-000145
|
|
Project Title |
Rehabilitation of 1 Unit of 36 Family CBQ at Lungi Barracks
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
300,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
70,214,629.21
|
|
Contractor |
Ken-Psamie Global Ventures
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 193 |
| |
OCID |
ocds-gyl66f-231001001-000060
|
|
Project Title |
Construction of Bridge over River Kaapu, Gbeswa, Ufaan and Expansion of Babanna – Kabe Road in Bor
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
50,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
1,484,500,000.00
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
| 194 |
| |
OCID |
ocds-gyl66f-231001001-000061
|
|
Project Title |
Replacement of Sub-Standard Bridge at Km 51+700 and Km 62+600 (Mayanchi) Along Gusau-Sokoto Road in
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
321,000,739.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
|
|
| |
|
| 195 |
| |
OCID |
ocds-gyl66f-231001001-000062
|
|
Project Title |
Reconstruction of Ohan & Moro Bridges on Ilorin-Igbeti Road in Osun State
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
122,176,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
|
|
| |
|
| 196 |
| |
OCID |
ocds-gyl66f-231001001-000063
|
|
Project Title |
Construction of Ojutu Bridge on Erinle River, Ilobu
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
1,035,994,100.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
|
|
| |
|
| 197 |
| |
OCID |
ocds-gyl66f-231001001-000077
|
|
Project Title |
Rehabilitation of Street Lights on Abuja – Keffi Expressway, Keffi End, Nasarawa State
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
75,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
615,525,755.00
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
|
|
| |
|
| 198 |
| |
OCID |
ocds-gyl66f-231001001-000078
|
|
Project Title |
Rehabilitation of Street Lights on Damaturu – Gombe Road in Yobe State
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
60,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
66,938,462.87
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
| 199 |
| |
OCID |
ocds-gyl66f-231001001-000079
|
|
Project Title |
Rehabilitation of Street Lights on Bauchi – Gombe Road, Gombe End
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
80,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
66,938,462.87
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 200 |
| |
OCID |
ocds-gyl66f-231001001-000080
|
|
Project Title |
Installation of Street Lights on Auchi – Okene Expressway (Auchi End)
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
130,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
102,928,641.37
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 201 |
| |
OCID |
ocds-gyl66f-228068001-000005
|
|
Project Title |
Procurement of Laboratory Equipment
|
|
| |
Procurring Entity |
NATIONAL CENTRE FOR ENERGY EFFICIENCY AND CONSERVATIVE,UNIVERSITY OF LAGOS.
|
|
|
|
| |
Budget Amount |
15,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 202 |
| |
OCID |
ocds-gyl66f-238005001-000001
|
|
Project Title |
PURCHASE OF COMPUTERS
|
|
| |
Procurring Entity |
BUDGET OFFICE OF THE FEDERATION
|
|
|
|
| |
Budget Amount |
27,230,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 203 |
| |
OCID |
ocds-gyl66f-238005001-000002
|
|
Project Title |
PURCHASE OF MOTOR VEHICLE
|
|
| |
Procurring Entity |
BUDGET OFFICE OF THE FEDERATION
|
|
|
|
| |
Budget Amount |
104,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 204 |
| |
OCID |
ocds-gyl66f-238005001-000003
|
|
Project Title |
COMPUTER SOFTWARE ACQUISITION
|
|
| |
Procurring Entity |
BUDGET OFFICE OF THE FEDERATION
|
|
|
|
| |
Budget Amount |
30,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 205 |
| |
OCID |
ocds-gyl66f-238005001-000004
|
|
Project Title |
UPGRADING OF THE INTERNET SERVER
|
|
| |
Procurring Entity |
BUDGET OFFICE OF THE FEDERATION
|
|
|
|
| |
Budget Amount |
25,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 206 |
| |
OCID |
ocds-gyl66f-238005001-000005
|
|
Project Title |
PROCUREMENT (BULK PURCHASE) OF DIESEL
|
|
| |
Procurring Entity |
BUDGET OFFICE OF THE FEDERATION
|
|
|
|
| |
Budget Amount |
67,500,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 207 |
| |
OCID |
ocds-gyl66f-124007001-000001
|
|
Project Title |
Design & Construction of L Shape Female Hostel (NFA, Sheda), Abuja.
|
|
| |
Procurring Entity |
FEDERAL FIRE SERVICE
|
|
|
|
| |
Budget Amount |
1,203,519,499.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 208 |
| |
OCID |
ocds-gyl66f-124007001-000002
|
|
Project Title |
Design & Construction of B.A Gallery (NFA, Sheda) Abuja
|
|
| |
Procurring Entity |
FEDERAL FIRE SERVICE
|
|
|
|
| |
Budget Amount |
1,203,519,499.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 209 |
| |
OCID |
ocds-gyl66f-124007001-000003
|
|
Project Title |
supply of 8 Nos. Rapid Intervention Vehicles
|
|
| |
Procurring Entity |
FEDERAL FIRE SERVICE
|
|
|
|
| |
Budget Amount |
2,800,172,273.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 210 |
| |
OCID |
ocds-gyl66f-124007001-000013
|
|
Project Title |
Renovation of Federal Fire Service Headquarters Building, Abuja
|
|
| |
Procurring Entity |
FEDERAL FIRE SERVICE
|
|
|
|
| |
Budget Amount |
1,203,519,499.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 211 |
| |
OCID |
ocds-gyl66f-124007001-000014
|
|
Project Title |
Renovation of FFS Station, Surulere-Lagos
|
|
| |
Procurring Entity |
FEDERAL FIRE SERVICE
|
|
|
|
| |
Budget Amount |
1,203,519,499.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 212 |
| |
OCID |
ocds-gyl66f-124007001-000015
|
|
Project Title |
Renovation of FFS station, Ebute-Meta, Lagos
|
|
| |
Procurring Entity |
FEDERAL FIRE SERVICE
|
|
|
|
| |
Budget Amount |
1,203,519,499.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 213 |
| |
OCID |
ocds-gyl66f-124007001-000016
|
|
Project Title |
Renovation of FFS H/Q Barracks, Abuja
|
|
| |
Procurring Entity |
FEDERAL FIRE SERVICE
|
|
|
|
| |
Budget Amount |
1,203,519,499.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 214 |
| |
OCID |
ocds-gyl66f-124007001-000028
|
|
Project Title |
3 NOS. OPERATIONAL VEHICLES
|
|
| |
Procurring Entity |
FEDERAL FIRE SERVICE
|
|
|
|
| |
Budget Amount |
2,800,172,273.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 215 |
| |
OCID |
ocds-gyl66f-116001001-000152
|
|
Project Title |
PURCHASE OF SPECIALIZED SECURITY EQUIPMENT
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
200,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 216 |
| |
OCID |
ocds-gyl66f-116001001-000153
|
|
Project Title |
ESTABLISHMENT OF LANGUANGE BUREAU/ INTERPRETATION UNIT
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
5,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 217 |
| |
OCID |
ocds-gyl66f-116001001-000154
|
|
Project Title |
Rehabilitation of 1 Unit of 3 Bedroom Block of 6 Flats (MOQ) at Block 42 An Barracks, Yaba, Lagos.
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
300,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
89,136,265.52
|
|
Contractor |
M/S IBAAB INTERNTIONAL NIGERIA LTD
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 218 |
| |
OCID |
ocds-gyl66f-116001001-000155
|
|
Project Title |
Construction of 1 Unit of 10 Family CBQ at Navy Barracks, Port Harcourt, Rivers State.
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
300,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
71,785,440.54
|
|
Contractor |
M/S DIAMOND SQUARE LTD
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 219 |
| |
OCID |
ocds-gyl66f-220002001-000024
|
|
Project Title |
Travels and Transport General
|
|
| |
Procurring Entity |
DEBT MANAGEMENT OFFICE
|
|
|
|
| |
Budget Amount |
7,756,400.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 220 |
| |
OCID |
ocds-gyl66f-116001001-000160
|
|
Project Title |
CONSTRUCTION OF 1 UNIT ZONAL EDUCATIONAL INSPECTORATE OFFICES IN ENUGU
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
250,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
174,191,771.09
|
|
Contractor |
M/S I.A.C. ALLIED TECHNICAL AND CONSTRUCTION COMPANY
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
| 221 |
| |
OCID |
ocds-gyl66f-116001001-000164
|
|
Project Title |
PURCHASE OF MOTOR VEHICLES
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
270,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Tender Stage
|
|
Status |
|
|
| |
|
| 222 |
| |
OCID |
ocds-gyl66f-116001001-000165
|
|
Project Title |
COMPLETION OF MOD CPU NAF BASE KADUNA
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
60,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
55,378,877.17
|
|
Contractor |
M/S BENGABSON ENT. NIG. LTD
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 223 |
| |
OCID |
ocds-gyl66f-220002001-000025
|
|
Project Title |
Materials & Supplies General
|
|
| |
Procurring Entity |
DEBT MANAGEMENT OFFICE
|
|
|
|
| |
Budget Amount |
4,871,965.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
4,871,965.00
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 224 |
| |
OCID |
ocds-gyl66f-116001001-000166
|
|
Project Title |
RENOVATION OF ARMOURED BRIDGADE, SOBI BARRACKS, ILORIN
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
60,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
55,464,402.80
|
|
Contractor |
M/S FISERV INTERNATIONAL LTD
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 225 |
| |
OCID |
ocds-gyl66f-116001001-000167
|
|
Project Title |
RENOVATION OF MOD CPU, EASTERN NAVAL COMMAND, CALABAR
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
50,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
46,471,847.10
|
|
Contractor |
M/S ANISET INTEGRATED SERVICES
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 226 |
| |
OCID |
ocds-gyl66f-116001001-000171
|
|
Project Title |
WEST AFRICAN LIAISON OFFICE OF INTERNATIONAL MILITARY SPORTS COUNCIL (ON-GOING)
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
105,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 227 |
| |
OCID |
ocds-gyl66f-116001001-000172
|
|
Project Title |
PROCUREMENT OF LIFTS (ELEVATORS)
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
39,677,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
30,563,925.00
|
|
Contractor |
JOEHEL GLOBAL SERVICES LTD
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 228 |
| |
OCID |
ocds-gyl66f-228033001-000001
|
|
Project Title |
PURCHASE AND INSTALLATION OF 350KVA GENERATING SET FOR THE ADMINISTRATIVE BUILDING AT THE HEADQUARTE
|
|
| |
Procurring Entity |
NATIONAL CENTRE FOR TECHNOLOGY MANAGEMENT, HQTRS, ILE IFE
|
|
|
|
| |
Budget Amount |
15,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 229 |
| |
OCID |
ocds-gyl66f-228033001-000002
|
|
Project Title |
REHABILITATION OF ROADS TO GUEST CHALETS, STRUCTURAL DEFECTIVE PARTS, EROSION CONTROL AND RE-ROOFING
|
|
| |
Procurring Entity |
NATIONAL CENTRE FOR TECHNOLOGY MANAGEMENT, HQTRS, ILE IFE
|
|
|
|
| |
Budget Amount |
30,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 230 |
| |
OCID |
ocds-gyl66f-231001001-000001
|
|
Project Title |
Provision of 1 No Froject Vehicle
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
25,000,000.00
NGN
|
|
Budget year |
2019
|
|
| |
Project Amount |
97,243,000.00
|
|
Contractor |
Messrs Miyetti Automobiles Nig. Ltd
|
|
| |
Procurement Stage |
Contract Stage
|
|
Status |
|
|
| |
|
| 231 |
| |
OCID |
ocds-gyl66f-231001001-000002
|
|
Project Title |
Preparation of Annual Report
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
4,322,515.00
NGN
|
|
Budget year |
2019
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 232 |
| |
OCID |
ocds-gyl66f-231001001-000005
|
|
Project Title |
UPGRADING OF PROCUREMENT DATABASE MANAGEMENT SYSTEM
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
4,500,000.00
NGN
|
|
Budget year |
2019
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 233 |
| |
OCID |
ocds-gyl66f-513001001-000002
|
|
Project Title |
Purchase of Library Books & Equipment
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF YOUTH & SPORTS DEVELOPMENT - HQTRS
|
|
|
|
| |
Budget Amount |
26,060,500.00
NGN
|
|
Budget year |
2016
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 234 |
| |
OCID |
ocds-gyl66f-513001001-000003
|
|
Project Title |
Purchase of Library Books & Equipment 1
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF YOUTH & SPORTS DEVELOPMENT - HQTRS
|
|
|
|
| |
Budget Amount |
11,764,000.00
NGN
|
|
Budget year |
2016
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 235 |
| |
OCID |
ocds-gyl66f-513001001-000004
|
|
Project Title |
Purchase of Office Furniture and FittingsFMY
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF YOUTH & SPORTS DEVELOPMENT - HQTRS
|
|
|
|
| |
Budget Amount |
81,701,880.00
NGN
|
|
Budget year |
2016
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 236 |
| |
OCID |
ocds-gyl66f-513001001-000005
|
|
Project Title |
Purchase of Office Furniture and Fittings 1
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF YOUTH & SPORTS DEVELOPMENT - HQTRS
|
|
|
|
| |
Budget Amount |
29,400,000.00
NGN
|
|
Budget year |
2016
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 237 |
| |
OCID |
ocds-gyl66f-513001001-000016
|
|
Project Title |
Electricity Package 'B'
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF YOUTH & SPORTS DEVELOPMENT - HQTRS
|
|
|
|
| |
Budget Amount |
15,000,000.00
NGN
|
|
Budget year |
2016
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 238 |
| |
OCID |
ocds-gyl66f-513001001-000017
|
|
Project Title |
Supply of Disel to Package 'A'
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF YOUTH & SPORTS DEVELOPMENT - HQTRS
|
|
|
|
| |
Budget Amount |
20,000,000.00
NGN
|
|
Budget year |
2016
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 239 |
| |
OCID |
ocds-gyl66f-513001001-000018
|
|
Project Title |
Supply of Diesel to Package 'B'
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF YOUTH & SPORTS DEVELOPMENT - HQTRS
|
|
|
|
| |
Budget Amount |
10,000,000.00
NGN
|
|
Budget year |
2016
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 240 |
| |
OCID |
ocds-gyl66f-513001001-000019
|
|
Project Title |
Maintenance of Swimming Pool, Chemicals etc
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF YOUTH & SPORTS DEVELOPMENT - HQTRS
|
|
|
|
| |
Budget Amount |
10,000,000.00
NGN
|
|
Budget year |
2016
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 241 |
| |
OCID |
ocds-gyl66f-513001001-000033
|
|
Project Title |
Renovation of Athletes' Hostel
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF YOUTH & SPORTS DEVELOPMENT - HQTRS
|
|
|
|
| |
Budget Amount |
50,000,000.00
NGN
|
|
Budget year |
2016
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 242 |
| |
OCID |
ocds-gyl66f-513001001-000034
|
|
Project Title |
Maintenance of Main Bowl and 2 Nos. Training Pitches
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF YOUTH & SPORTS DEVELOPMENT - HQTRS
|
|
|
|
| |
Budget Amount |
25,000,000.00
NGN
|
|
Budget year |
2016
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 243 |
| |
OCID |
ocds-gyl66f-513001001-000035
|
|
Project Title |
Renovation of Indoor Sports Hall
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF YOUTH & SPORTS DEVELOPMENT - HQTRS
|
|
|
|
| |
Budget Amount |
30,000,000.00
NGN
|
|
Budget year |
2016
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 244 |
| |
OCID |
ocds-gyl66f-513001001-000036
|
|
Project Title |
Renovation of Changing Rooms
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF YOUTH & SPORTS DEVELOPMENT - HQTRS
|
|
|
|
| |
Budget Amount |
30,000,000.00
NGN
|
|
Budget year |
2016
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 245 |
| |
OCID |
ocds-gyl66f-513001001-000049
|
|
Project Title |
Construction of Mini Sports Centre at Bogoro, Bauchi State
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF YOUTH & SPORTS DEVELOPMENT - HQTRS
|
|
|
|
| |
Budget Amount |
50,000,000.00
NGN
|
|
Budget year |
2016
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 246 |
| |
OCID |
ocds-gyl66f-513001001-000050
|
|
Project Title |
Contruction of Mini Sports Centre at Bashar, Plateau State
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF YOUTH & SPORTS DEVELOPMENT - HQTRS
|
|
|
|
| |
Budget Amount |
30,307,000.00
NGN
|
|
Budget year |
2016
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 247 |
| |
OCID |
ocds-gyl66f-513001001-000051
|
|
Project Title |
Construction of Mini Sports Centre at Ayeedade/Irewole/Isokan Federal Constituency, Osun State
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF YOUTH & SPORTS DEVELOPMENT - HQTRS
|
|
|
|
| |
Budget Amount |
25,000,000.00
NGN
|
|
Budget year |
2016
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 248 |
| |
OCID |
ocds-gyl66f-513001001-000052
|
|
Project Title |
Construction of Stadium, Sitting Shade and Fencing of Rijau Township Stadium at Rijau/Magama Federal
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF YOUTH & SPORTS DEVELOPMENT - HQTRS
|
|
|
|
| |
Budget Amount |
40,000,000.00
NGN
|
|
Budget year |
2016
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 249 |
| |
OCID |
ocds-gyl66f-521027003-02152
|
|
Project Title |
Procurement of Solar Power
|
|
| |
Procurring Entity |
FEDERAL MEDICAL CENTRE - JABI ABUJA
|
|
|
|
| |
Budget Amount |
73,266,667.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 250 |
| |
OCID |
ocds-gyl66f-521027003-02153
|
|
Project Title |
PURCHASE OF MOTOR VEHICLES
|
|
| |
Procurring Entity |
FEDERAL MEDICAL CENTRE - JABI ABUJA
|
|
|
|
| |
Budget Amount |
55,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 251 |
| |
OCID |
ocds-gyl66f-521027003-02154
|
|
Project Title |
EQUIPPING OF CRECHE CENTER
|
|
| |
Procurring Entity |
FEDERAL MEDICAL CENTRE - JABI ABUJA
|
|
|
|
| |
Budget Amount |
55,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 252 |
| |
OCID |
ocds-gyl66f-521027003-02155
|
|
Project Title |
EXPANSION AND FURNISHING OF INTENSIVE CARE UNIT
|
|
| |
Procurring Entity |
FEDERAL MEDICAL CENTRE - JABI ABUJA
|
|
|
|
| |
Budget Amount |
75,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 253 |
| |
OCID |
ocds-gyl66f-521027003-03172
|
|
Project Title |
PURCHASE OF HEALTH /MEDICAL EQUIPMENT
|
|
| |
Procurring Entity |
FEDERAL MEDICAL CENTRE - JABI ABUJA
|
|
|
|
| |
Budget Amount |
24,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 254 |
| |
OCID |
ocds-gyl66f-521027003-03173
|
|
Project Title |
CONSTRUCTION OF CRECHE
|
|
| |
Procurring Entity |
FEDERAL MEDICAL CENTRE - JABI ABUJA
|
|
|
|
| |
Budget Amount |
50,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 255 |
| |
OCID |
ocds-gyl66f-231001001-03174
|
|
Project Title |
EMERGENCY REPAIRS OF COLLAPSED TATABU BRIDGE ALONG MOKWA-TEGINA ROAD IN NIGER STATE
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
1,597,416,620.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 256 |
| |
OCID |
ocds-gyl66f-521027003-03175
|
|
Project Title |
CONSTRUCTION /PROVISION OF HOSPITAL/HEALTH CENTERS
|
|
| |
Procurring Entity |
FEDERAL MEDICAL CENTRE - JABI ABUJA
|
|
|
|
| |
Budget Amount |
40,999,999.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 257 |
| |
OCID |
ocds-gyl66f-231001001-04209
|
|
Project Title |
CONSTRUCTION OF YOLA-FUFORE-GURIN ROAD IN ADAMAWA STATE
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
187,817,469.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
13,643,670,884.81
|
|
Contractor |
WIZ CHINA WORLDWIDE ENGINEERING LIMITED
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
| 258 |
| |
OCID |
ocds-gyl66f-231001001-04210
|
|
Project Title |
CONSTRUCTION OF KEBBI-LAMBA-BELEL ROAD IN ADAMAWA STATE
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
563,452,408.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Tender Stage
|
|
Status |
|
|
| |
|
| 259 |
| |
OCID |
ocds-gyl66f-231001001-04211
|
|
Project Title |
CONSTRUCTION OF KUNYA-BABURA-NIGER BORDER:BABURA-NIGER REPUBLIC BORDER IN KANO STATE
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
48,406,564.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 260 |
| |
OCID |
ocds-gyl66f-116001001-000134
|
|
Project Title |
EQUIPPING OF MOD ICT CENTRES
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
70,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 261 |
| |
OCID |
ocds-gyl66f-116001001-000140
|
|
Project Title |
Rehabilitation of 2 Units of 12 Family CBQ and 1 Unit of MOQ (3 Bedroom Bungalow) at Army Barracks,
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
300,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
78,996,088.60
|
|
Contractor |
OK & JOEL ENGINEERING SERV. LTD
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 262 |
| |
OCID |
ocds-gyl66f-116001001-000141
|
|
Project Title |
Rehabilitation of 2 Units of 12 Family CBQ and 1 Unit of SNCO (2 Bedroom Bungalow) at Giginya Barrac
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
300,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
72,396,022.55
|
|
Contractor |
Sand Track Nigeria
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 263 |
| |
OCID |
ocds-gyl66f-231001001-000047
|
|
Project Title |
Rehabilitation of Ado-Ifaki-Otun-Kwara State Border Road in Ekiti State, Contract No. 6451
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
200,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
6,002,326,775.96
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
| 264 |
| |
OCID |
ocds-gyl66f-231001001-000049
|
|
Project Title |
Rehabilitation of Nkwo Inyi-Akpugoeze-Anambra State Border Road Enugu/Anambra States, Contract No. 6
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
248,040,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
2,695,755,677.42
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
| 265 |
| |
OCID |
ocds-gyl66f-231001001-000056
|
|
Project Title |
Design and Construction of Oye Ukpo – Orofia Oranto off Enugu Onitsha Expressway Dunukofia, Anambra
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
100,400,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
77,450,500.00
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
| 266 |
| |
OCID |
ocds-gyl66f-231001001-000057
|
|
Project Title |
Rehabilitation of Gombe-Biu Road in Gombe/Borno States
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
264,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
27,233,494,538.25
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
| 267 |
| |
OCID |
ocds-gyl66f-231001001-000059
|
|
Project Title |
Construction of Nkwuni Mammu Bridge, Abia/Enugu States
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
155,160,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
181,800,000.00
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
| 268 |
| |
OCID |
ocds-gyl66f-231001001-000064
|
|
Project Title |
Construction of Shuwarin Gaya Intechange Kano/Jigawa state
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
1,151,520,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
8,361,573,392.50
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
| 269 |
| |
OCID |
ocds-gyl66f-231001001-000066
|
|
Project Title |
Rehabilitation/Repairs of Estate Roads in Federal Housing Estate, Karu, FCT.
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
5,000,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
27,827,812.44
|
|
Contractor |
Cisco Info Tech Nigeria Limited
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 270 |
| |
OCID |
ocds-gyl66f-231001001-000068
|
|
Project Title |
Installation of Street Lights on Abuja – Abaji – Lokoja Expressway (Gwagwalada-Abaji), Abaji End
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
150,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
110,469,948.75
|
|
Contractor |
Nas Capital Limited
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 271 |
| |
OCID |
ocds-gyl66f-231001001-000073
|
|
Project Title |
Installation of Street Lights on Abuja – Abaji – Lokoja Expressway, Section 1, Gwagwalada Interchang
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
150,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
|
|
| |
|
| 272 |
| |
OCID |
ocds-gyl66f-231001001-000075
|
|
Project Title |
Rehabilitation of Street Lights on Nsukka – Enugu Road, 9th Mile, Enugu State
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
50,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
43,698,330.75
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 273 |
| |
OCID |
ocds-gyl66f-231001001-000082
|
|
Project Title |
Rehabilitation of Solar Street Lights on Argungu Bridge, Kebbi State
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
60,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
52,681,339.40
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 274 |
| |
OCID |
ocds-gyl66f-228068001-000006
|
|
Project Title |
Procurement of Equipment for Design and Fabrication of Production of Laboratory for LED Lamps
|
|
| |
Procurring Entity |
NATIONAL CENTRE FOR ENERGY EFFICIENCY AND CONSERVATIVE,UNIVERSITY OF LAGOS.
|
|
|
|
| |
Budget Amount |
32,885,433.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 275 |
| |
OCID |
ocds-gyl66f-238005001-000006
|
|
Project Title |
REHABILITATION OF GENERATOR BUILDING/PROVISION OF DRAINAGE LINES AND FIRE EQUIPMENT
|
|
| |
Procurring Entity |
BUDGET OFFICE OF THE FEDERATION
|
|
|
|
| |
Budget Amount |
3,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 276 |
| |
OCID |
ocds-gyl66f-124007001-000005
|
|
Project Title |
Design & Construction of Flood Rescue Prop. (NFA, Sheda) Abuja
|
|
| |
Procurring Entity |
FEDERAL FIRE SERVICE
|
|
|
|
| |
Budget Amount |
1,203,519,499.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 277 |
| |
OCID |
ocds-gyl66f-124007001-000012
|
|
Project Title |
Provision of Conventional Street Lighting
|
|
| |
Procurring Entity |
FEDERAL FIRE SERVICE
|
|
|
|
| |
Budget Amount |
1,203,519,499.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 278 |
| |
OCID |
ocds-gyl66f-124007001-000017
|
|
Project Title |
Renovation of FFS Station, Apapa-Lagos
|
|
| |
Procurring Entity |
FEDERAL FIRE SERVICE
|
|
|
|
| |
Budget Amount |
1,203,519,499.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 279 |
| |
OCID |
ocds-gyl66f-124007001-000023
|
|
Project Title |
Renovation of FFS, Sattelite Town Barracks, Lagos
|
|
| |
Procurring Entity |
FEDERAL FIRE SERVICE
|
|
|
|
| |
Budget Amount |
1,203,519,499.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 280 |
| |
OCID |
ocds-gyl66f-124007001-000026
|
|
Project Title |
1 NO. AERIAL PLATFORM FIRE TRUCK OF AERIAL HEIGHT (45M)
|
|
| |
Procurring Entity |
FEDERAL FIRE SERVICE
|
|
|
|
| |
Budget Amount |
253,853,173.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 281 |
| |
OCID |
ocds-gyl66f-116001001-000149
|
|
Project Title |
Rehabilitation of 2 Units of 10 Family CBQ at Ikeja Cantonment
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
300,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
56,452,558.72
|
|
Contractor |
M/S NUMBERS LTD
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 282 |
| |
OCID |
ocds-gyl66f-116001001-000151
|
|
Project Title |
Rehabilitation of 1 Units of 30 Family CBQ at Navy Town Barracks, Lagos
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
300,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
78,489,344.52
|
|
Contractor |
M/S FULL-FLEDGED CONSULT
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 283 |
| |
OCID |
ocds-gyl66f-220002001-000021
|
|
Project Title |
Materials and Supplies General
|
|
| |
Procurring Entity |
DEBT MANAGEMENT OFFICE
|
|
|
|
| |
Budget Amount |
5,481,149.99
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Tender Stage
|
|
Status |
|
|
| |
|
| 284 |
| |
OCID |
ocds-gyl66f-220002001-000022
|
|
Project Title |
Other services general
|
|
| |
Procurring Entity |
DEBT MANAGEMENT OFFICE
|
|
|
|
| |
Budget Amount |
16,130,981.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 285 |
| |
OCID |
ocds-gyl66f-116001001-000156
|
|
Project Title |
Rehabilitation of 2 Units of 12 Family CBQ and 1 Unit of 2 Bedroom (Twin) SNCO at NAF, Calabar, Cros
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
300,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
76,293,333.70
|
|
Contractor |
M/S NUMORA INTEGRATED
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 286 |
| |
OCID |
ocds-gyl66f-116001001-000158
|
|
Project Title |
Rehabilitation of 2 Unit of 12 Family CBQ at Navy Barracks, Yenagoa.
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
300,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
69,084,891.96
|
|
Contractor |
M/S GRACELAND GLOBAL LEGENDS LTD
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
| 287 |
| |
OCID |
ocds-gyl66f-116001001-000169
|
|
Project Title |
CONSTRUCTION OF STUDENT HOSTEL IN NIGERIAN ARMY INSTITUTE OF TECHNOLOGY AND ENVIRONMENTAL STUDIES (N
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
200,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 288 |
| |
OCID |
ocds-gyl66f-116001001-000170
|
|
Project Title |
CONSTRUCTION OF STUDENT CLASSROOMS IN NIGERIAN ARMY INSTITUTE OF TECHNOLOGY AND ENVIRONMENTAL STUDIE
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
200,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 289 |
| |
OCID |
ocds-gyl66f-116001001-000174
|
|
Project Title |
REFORMS/REVIEW OF ENABLING DEFENCE LAWS (ARMED FORCES ACT) (ON-GOING)
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
50,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 290 |
| |
OCID |
ocds-gyl66f-116001001-000175
|
|
Project Title |
DEVELOPMENT OF COMPENDIUM OF DEFENCE STATISTICS, PHASE II
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
10,156,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 291 |
| |
OCID |
ocds-gyl66f-116001001-000177
|
|
Project Title |
STOCK INVENTORY/ENCODING OF ACCESS AT HQS AND CPUs
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
17,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 292 |
| |
OCID |
ocds-gyl66f-228068001-000001
|
|
Project Title |
Procurement of Project Vehicle
|
|
| |
Procurring Entity |
NATIONAL CENTRE FOR ENERGY EFFICIENCY AND CONSERVATIVE,UNIVERSITY OF LAGOS.
|
|
|
|
| |
Budget Amount |
10,417,163.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
10,417,163.00
|
|
Contractor |
Innoson Vehicle Manufacturing Company Limited
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 293 |
| |
OCID |
ocds-gyl66f-228068001-000002
|
|
Project Title |
Procurement of Energy Audit Equipment
|
|
| |
Procurring Entity |
NATIONAL CENTRE FOR ENERGY EFFICIENCY AND CONSERVATIVE,UNIVERSITY OF LAGOS.
|
|
|
|
| |
Budget Amount |
15,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
14,975,400.00
|
|
Contractor |
Joaks-Link Limited
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 294 |
| |
OCID |
ocds-gyl66f-116001001-000168
|
|
Project Title |
ICT INFRASTRUCTURE RE-ENGINEERING; EXPANSION AND MODIFICATION OF MOD LOCAL AREA NETWORK
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
78,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 295 |
| |
OCID |
ocds-gyl66f-116001001-000176
|
|
Project Title |
BUDGET MONITORING AND EVALUATION
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
30,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 296 |
| |
OCID |
ocds-gyl66f-521027002-000002
|
|
Project Title |
Renovation of dilapidated office building
|
|
| |
Procurring Entity |
UNIVERSITY OF UYO TEACHING HOSPITAL
|
|
|
|
| |
Budget Amount |
50,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 297 |
| |
OCID |
ocds-gyl66f-231001001-000010
|
|
Project Title |
purchase of 6nos utility vehicles
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
38,000,000.00
NGN
|
|
Budget year |
2019
|
|
| |
Project Amount |
22,523,550.00
|
|
Contractor |
Messrs Workland Wide Field Limited
|
|
| |
Procurement Stage |
Contract Stage
|
|
Status |
|
|
| |
|
| 298 |
| |
OCID |
ocds-gyl66f-231001001-000011
|
|
Project Title |
Procurement of office equipment (computers, printers, scanners, photocopier and stationery, A4, Biro
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
70,887,000.00
NGN
|
|
Budget year |
2019
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 299 |
| |
OCID |
ocds-gyl66f-231001001-000012
|
|
Project Title |
Vehicle insurance and tracking of the Ministry's utility and project vehicles to guarantee their saf
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
20,000,000.00
NGN
|
|
Budget year |
2019
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 300 |
| |
OCID |
ocds-gyl66f-231001001-000013
|
|
Project Title |
Manpower Development and Reforms in Works and Housing Sectors of the Ministry
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
33,043,209.00
NGN
|
|
Budget year |
2020
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 301 |
| |
OCID |
ocds-gyl66f-231001001-000017
|
|
Project Title |
Cleaning of Office Complex, Beautification of Environment and Purchase of Diesel for the Ministry
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
15,000,000.00
NGN
|
|
Budget year |
2019
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 302 |
| |
OCID |
ocds-gyl66f-513001001-000008
|
|
Project Title |
Additional Access Road to Athletes' Hostel
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF YOUTH & SPORTS DEVELOPMENT - HQTRS
|
|
|
|
| |
Budget Amount |
14,000,000.00
NGN
|
|
Budget year |
2016
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 303 |
| |
OCID |
ocds-gyl66f-513001001-000009
|
|
Project Title |
Additional Furnishing of Athletes' Hostel
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF YOUTH & SPORTS DEVELOPMENT - HQTRS
|
|
|
|
| |
Budget Amount |
10,000,000.00
NGN
|
|
Budget year |
2016
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 304 |
| |
OCID |
ocds-gyl66f-513001001-000010
|
|
Project Title |
Terraflex Flooring of Indoors sports Hall Package 'B' Abuja.
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF YOUTH & SPORTS DEVELOPMENT - HQTRS
|
|
|
|
| |
Budget Amount |
40,000,000.00
NGN
|
|
Budget year |
2016
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 305 |
| |
OCID |
ocds-gyl66f-513001001-000011
|
|
Project Title |
MAINTENANCE OF PITCHES LABOUR AND MATERIALS
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF YOUTH & SPORTS DEVELOPMENT - HQTRS
|
|
|
|
| |
Budget Amount |
25,000,000.00
NGN
|
|
Budget year |
2016
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 306 |
| |
OCID |
ocds-gyl66f-513001001-000024
|
|
Project Title |
Water Bills
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF YOUTH & SPORTS DEVELOPMENT - HQTRS
|
|
|
|
| |
Budget Amount |
10,000,000.00
NGN
|
|
Budget year |
2016
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 307 |
| |
OCID |
ocds-gyl66f-513001001-000025
|
|
Project Title |
Rehabilitation of Main Bowl
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF YOUTH & SPORTS DEVELOPMENT - HQTRS
|
|
|
|
| |
Budget Amount |
210,711,100.00
NGN
|
|
Budget year |
2016
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 308 |
| |
OCID |
ocds-gyl66f-513001001-000026
|
|
Project Title |
Rehabilitation of Nnamdi Azikiwe Stadium
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF YOUTH & SPORTS DEVELOPMENT - HQTRS
|
|
|
|
| |
Budget Amount |
100,000,000.00
NGN
|
|
Budget year |
2016
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 309 |
| |
OCID |
ocds-gyl66f-513001001-000027
|
|
Project Title |
Rehabilitation of Indoor Sports Hall
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF YOUTH & SPORTS DEVELOPMENT - HQTRS
|
|
|
|
| |
Budget Amount |
27,090,000.00
NGN
|
|
Budget year |
2016
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 310 |
| |
OCID |
ocds-gyl66f-513001001-000041
|
|
Project Title |
Rehabilitation of the Hostels
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF YOUTH & SPORTS DEVELOPMENT - HQTRS
|
|
|
|
| |
Budget Amount |
20,000,000.00
NGN
|
|
Budget year |
2016
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 311 |
| |
OCID |
ocds-gyl66f-513001001-000042
|
|
Project Title |
Construction of Association of National Olympic Committee of Africa (ANOCA) Headquarters.
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF YOUTH & SPORTS DEVELOPMENT - HQTRS
|
|
|
|
| |
Budget Amount |
80,000,000.00
NGN
|
|
Budget year |
2016
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 312 |
| |
OCID |
ocds-gyl66f-513001001-000043
|
|
Project Title |
Construction of Mini Sports Centre at Burusari, Busari LGA, Yobe State
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF YOUTH & SPORTS DEVELOPMENT - HQTRS
|
|
|
|
| |
Budget Amount |
100,000,000.00
NGN
|
|
Budget year |
2016
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 313 |
| |
OCID |
ocds-gyl66f-513001001-000044
|
|
Project Title |
Construction of Mini Sports Centre
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF YOUTH & SPORTS DEVELOPMENT - HQTRS
|
|
|
|
| |
Budget Amount |
60,000,000.00
NGN
|
|
Budget year |
2016
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 314 |
| |
OCID |
ocds-gyl66f-513001001-000054
|
|
Project Title |
Rehabilitation and Construction of Mini Stadia
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF YOUTH & SPORTS DEVELOPMENT - HQTRS
|
|
|
|
| |
Budget Amount |
350,000,000.00
NGN
|
|
Budget year |
2016
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 315 |
| |
OCID |
ocds-gyl66f-513001001-000055
|
|
Project Title |
Construction of Mini Sports Centre at Government Secondary School, Afikpo North/South Federal Consti
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF YOUTH & SPORTS DEVELOPMENT - HQTRS
|
|
|
|
| |
Budget Amount |
50,000,000.00
NGN
|
|
Budget year |
2016
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 316 |
| |
OCID |
ocds-gyl66f-513001001-000056
|
|
Project Title |
Construction/Provision of Sporting Facilities
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF YOUTH & SPORTS DEVELOPMENT - HQTRS
|
|
|
|
| |
Budget Amount |
1,665,804,377.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
231,018,432.70
|
|
Contractor |
Messrs Wise Skills Ltd
|
|
| |
Procurement Stage |
Contract Stage
|
|
Status |
|
|
| |
|
| 317 |
| |
OCID |
ocds-gyl66f-513001001-000057
|
|
Project Title |
CONSTRUCTION/EQUIPPING OF YOUTH SKILL ACQUISITION CENTER NKANU WEST LGA OBUOFFIA ENUGU STATE
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF YOUTH & SPORTS DEVELOPMENT - HQTRS
|
|
|
|
| |
Budget Amount |
60,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
54,070,800.00
|
|
Contractor |
MESSRS CELPARDY NIGERIA LIMITED
|
|
| |
Procurement Stage |
Contract Stage
|
|
Status |
|
|
| |
|
| 318 |
| |
OCID |
ocds-gyl66f-521027003-03180
|
|
Project Title |
PROCUREMENT AND INSTALLATION OF DIGITAL MAMMOGRAPHY MACHINE
|
|
| |
Procurring Entity |
FEDERAL MEDICAL CENTRE - JABI ABUJA
|
|
|
|
| |
Budget Amount |
75,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 319 |
| |
OCID |
ocds-gyl66f-521027003-04251
|
|
Project Title |
HIV AWARENESS CAMPAIGN IN COE
|
|
| |
Procurring Entity |
FEDERAL MEDICAL CENTRE - JABI ABUJA
|
|
|
|
| |
Budget Amount |
30,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 320 |
| |
OCID |
ocds-gyl66f-116001001-000001
|
|
Project Title |
REHABILITATION OF 2 UNITS OF 12 FAMILY CBQ, AND 1 UNIT OF MOQ (3 BEDROOM \BUNGALOW) AT NIGERIAN ARMY
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
2,750,000,000.00
NGN
|
|
Budget year |
2019
|
|
| |
Project Amount |
69,120,064.74
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 321 |
| |
OCID |
ocds-gyl66f-220002001-000002
|
|
Project Title |
Supply, installation and configuration of Video Conference Solution
|
|
| |
Procurring Entity |
DEBT MANAGEMENT OFFICE
|
|
|
|
| |
Budget Amount |
20,300,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
17,592,146.25
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 322 |
| |
OCID |
ocds-gyl66f-220002001-000003
|
|
Project Title |
Procurement of Computer Software and Enterprise Solution
|
|
| |
Procurring Entity |
DEBT MANAGEMENT OFFICE
|
|
|
|
| |
Budget Amount |
22,400,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
13,650,010.00
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
|
|
| |
|
| 323 |
| |
OCID |
ocds-gyl66f-220002001-000004
|
|
Project Title |
Purchase of Enterprise Server
|
|
| |
Procurring Entity |
DEBT MANAGEMENT OFFICE
|
|
|
|
| |
Budget Amount |
9,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
7,842,550.00
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 324 |
| |
OCID |
ocds-gyl66f-220002001-000005
|
|
Project Title |
Power Backup Capacity Enhancement
|
|
| |
Procurring Entity |
DEBT MANAGEMENT OFFICE
|
|
|
|
| |
Budget Amount |
3,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
2,328,750.00
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 325 |
| |
OCID |
ocds-gyl66f-220002001-000006
|
|
Project Title |
Procurement of Toyota Prado (1 Unit)
|
|
| |
Procurring Entity |
DEBT MANAGEMENT OFFICE
|
|
|
|
| |
Budget Amount |
50,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 326 |
| |
OCID |
ocds-gyl66f-513001001-000070
|
|
Project Title |
MONITORING AND EVALUATION OF CAPITAL PROJECTS
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF YOUTH & SPORTS DEVELOPMENT - HQTRS
|
|
|
|
| |
Budget Amount |
80,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 327 |
| |
OCID |
ocds-gyl66f-220002001-000023
|
|
Project Title |
Local Training
|
|
| |
Procurring Entity |
DEBT MANAGEMENT OFFICE
|
|
|
|
| |
Budget Amount |
23,240,409.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 328 |
| |
OCID |
ocds-gyl66f-116001001-000157
|
|
Project Title |
Rehabilitation of 1 Unit of 30 Family at Atim Barracks, Calabar (Navy)
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
300,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
76,030,946.16
|
|
Contractor |
M/S ROKOZI INVESTMENT LTD
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 329 |
| |
OCID |
ocds-gyl66f-116001001-000161
|
|
Project Title |
REHABILITATION OF MILITARY CEMETERY IN ABUJA
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
40,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
19,786,439.20
|
|
Contractor |
M/S GLOBAL HARVEST BUSINESS ENT. NIG. LTD
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 330 |
| |
OCID |
ocds-gyl66f-228068001-000004
|
|
Project Title |
Procurement of Laboratory Equipment
|
|
| |
Procurring Entity |
NATIONAL CENTRE FOR ENERGY EFFICIENCY AND CONSERVATIVE,UNIVERSITY OF LAGOS.
|
|
|
|
| |
Budget Amount |
15,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 331 |
| |
OCID |
ocds-gyl66f-116001001-000173
|
|
Project Title |
PRODUCTION OF DOCUMENTARY ON ACTIVITIES OF MOD AND ITS AGENCIES AND AIRING (ON-GOING)
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
10,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 332 |
| |
OCID |
ocds-gyl66f-521027002-000003
|
|
Project Title |
Completion of ibiono Ibom health centre
|
|
| |
Procurring Entity |
UNIVERSITY OF UYO TEACHING HOSPITAL
|
|
|
|
| |
Budget Amount |
110,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 333 |
| |
OCID |
ocds-gyl66f-521027002-000005
|
|
Project Title |
completion of construction of 2 storey school block
|
|
| |
Procurring Entity |
UNIVERSITY OF UYO TEACHING HOSPITAL
|
|
|
|
| |
Budget Amount |
71,481,328.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 334 |
| |
OCID |
ocds-gyl66f-228033001-000004
|
|
Project Title |
PURCHASE OF AIR CONDITIONERS, FANS AND LAPTOPS FOR ADMINISTRATIVE OFFICES AT THE HEADQUATERS AND ZON
|
|
| |
Procurring Entity |
NATIONAL CENTRE FOR TECHNOLOGY MANAGEMENT, HQTRS, ILE IFE
|
|
|
|
| |
Budget Amount |
15,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 335 |
| |
OCID |
ocds-gyl66f-231001001-000006
|
|
Project Title |
Consturction of Road, Bridges, Culvects and Drains in six(6) Geopolitical Zones.
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
1,504,628,584.00
NGN
|
|
Budget year |
2019
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 336 |
| |
OCID |
ocds-gyl66f-231001001-000008
|
|
Project Title |
Acquisition of Medical Equipment
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
8,000,313.00
NGN
|
|
Budget year |
2019
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 337 |
| |
OCID |
ocds-gyl66f-231001001-000014
|
|
Project Title |
SERVICOM Unititly Vehicles
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
50,200,000.00
NGN
|
|
Budget year |
2020
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 338 |
| |
OCID |
ocds-gyl66f-513001001-000001
|
|
Project Title |
Purchase of Office Furniture and Fittings
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF YOUTH & SPORTS DEVELOPMENT - HQTRS
|
|
|
|
| |
Budget Amount |
17,973,200.00
NGN
|
|
Budget year |
2016
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 339 |
| |
OCID |
ocds-gyl66f-513001001-000006
|
|
Project Title |
Purchase of Sporting/Gaming Equipment
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF YOUTH & SPORTS DEVELOPMENT - HQTRS
|
|
|
|
| |
Budget Amount |
2,200,000.00
NGN
|
|
Budget year |
2016
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 340 |
| |
OCID |
ocds-gyl66f-513001001-000012
|
|
Project Title |
Supply of Pitch Maintenance Equipment
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF YOUTH & SPORTS DEVELOPMENT - HQTRS
|
|
|
|
| |
Budget Amount |
40,000,000.00
NGN
|
|
Budget year |
2016
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 341 |
| |
OCID |
ocds-gyl66f-513001001-000014
|
|
Project Title |
Cleaning of Package 'B'
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF YOUTH & SPORTS DEVELOPMENT - HQTRS
|
|
|
|
| |
Budget Amount |
5,000,000.00
NGN
|
|
Budget year |
2016
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 342 |
| |
OCID |
ocds-gyl66f-513001001-000021
|
|
Project Title |
Rehabilitation of Swimming Pool
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF YOUTH & SPORTS DEVELOPMENT - HQTRS
|
|
|
|
| |
Budget Amount |
60,000,000.00
NGN
|
|
Budget year |
2016
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 343 |
| |
OCID |
ocds-gyl66f-513001001-000023
|
|
Project Title |
Electricity Bills
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF YOUTH & SPORTS DEVELOPMENT - HQTRS
|
|
|
|
| |
Budget Amount |
10,000,000.00
NGN
|
|
Budget year |
2016
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 344 |
| |
OCID |
ocds-gyl66f-513001001-000028
|
|
Project Title |
Rehabilitation of Tartan Tracks Swimming Pool
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF YOUTH & SPORTS DEVELOPMENT - HQTRS
|
|
|
|
| |
Budget Amount |
20,000,000.00
NGN
|
|
Budget year |
2016
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 345 |
| |
OCID |
ocds-gyl66f-513001001-000030
|
|
Project Title |
Electricity Bills, Obafemi Awolowo Stadium
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF YOUTH & SPORTS DEVELOPMENT - HQTRS
|
|
|
|
| |
Budget Amount |
15,000,000.00
NGN
|
|
Budget year |
2016
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 346 |
| |
OCID |
ocds-gyl66f-513001001-000032
|
|
Project Title |
Cleaning of Main Bowl and Offices, Obafemi Awolowo Stadium
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF YOUTH & SPORTS DEVELOPMENT - HQTRS
|
|
|
|
| |
Budget Amount |
10,000,000.00
NGN
|
|
Budget year |
2016
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 347 |
| |
OCID |
ocds-gyl66f-513001001-000037
|
|
Project Title |
Electricity Bills , Ahmadu Bello Stadium
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF YOUTH & SPORTS DEVELOPMENT - HQTRS
|
|
|
|
| |
Budget Amount |
10,000,000.00
NGN
|
|
Budget year |
2016
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 348 |
| |
OCID |
ocds-gyl66f-513001001-000039
|
|
Project Title |
Cleaning of Main Bowl and Offices, Ahmadu Bello Stadium
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF YOUTH & SPORTS DEVELOPMENT - HQTRS
|
|
|
|
| |
Budget Amount |
15,000,000.00
NGN
|
|
Budget year |
2016
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 349 |
| |
OCID |
ocds-gyl66f-513001001-000046
|
|
Project Title |
Construction of Mini Sports Centre at Lafia, Nasarawa State
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF YOUTH & SPORTS DEVELOPMENT - HQTRS
|
|
|
|
| |
Budget Amount |
30,016,000.00
NGN
|
|
Budget year |
2016
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 350 |
| |
OCID |
ocds-gyl66f-513001001-000048
|
|
Project Title |
Construction of Mini Sports Centre at Ikeduru, Imo State
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF YOUTH & SPORTS DEVELOPMENT - HQTRS
|
|
|
|
| |
Budget Amount |
50,000,000.00
NGN
|
|
Budget year |
2016
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 351 |
| |
OCID |
ocds-gyl66f-513001001-000053
|
|
Project Title |
Construction of Mini Stadium
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF YOUTH & SPORTS DEVELOPMENT - HQTRS
|
|
|
|
| |
Budget Amount |
250,000,000.00
NGN
|
|
Budget year |
2016
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 352 |
| |
OCID |
ocds-gyl66f-513001001-000058
|
|
Project Title |
COUNTERPART FUND FOR YOUTH DEVELOPMENT PROGRAMME IN COLLABORATION WITH UNIDO
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF YOUTH & SPORTS DEVELOPMENT - HQTRS
|
|
|
|
| |
Budget Amount |
30,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 353 |
| |
OCID |
ocds-gyl66f-231001001-03170
|
|
Project Title |
REHABILITATION OF ABUJA-KADUNA-ZARIA -KANO DUAL CARRIAGEWAY IN KADUNA AND KANO STATES
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
22,267,019,548.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 354 |
| |
OCID |
ocds-gyl66f-231001001-03177
|
|
Project Title |
COUNTERPART FUNDING FOR CONSTRUCTION OF JOINT BORDER BRIDGE AT MFUM/EKOK UNDER THE NIGERIA/CAMEROUN
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
281,726,204.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 355 |
| |
OCID |
ocds-gyl66f-521027003-03179
|
|
Project Title |
COMPLETION AND FURNISHING OF DOCTORS QUATERS
|
|
| |
Procurring Entity |
FEDERAL MEDICAL CENTRE - JABI ABUJA
|
|
|
|
| |
Budget Amount |
150,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 356 |
| |
OCID |
ocds-gyl66f-231001001-03209
|
|
Project Title |
REHABILITATION OF OBA-NNEWI ROAD SECTION I & II IN ANAMBRA STATE, C/NO. 5986
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
281,726,204.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 357 |
| |
OCID |
ocds-gyl66f-231001001-03211
|
|
Project Title |
CONSTRUCTION OF CALABAR-OBAN EKANG/CAMEROUN BORDER ROAD INCLUDING BRIDGES IN CROSS RIVERS STATE
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
281,726,204.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
27,781,851,866.55
|
|
Contractor |
SETRACO NIGERIA LIMITED
|
|
| |
Procurement Stage |
Contract Stage
|
|
Status |
|
|
| |
|
| 358 |
| |
OCID |
ocds-gyl66f-231001001-04213
|
|
Project Title |
REHABILITATION OF ADO-EKITI-IGEDE-ARAMOKO-ITAWAURE ROAD IN EKITI STATE
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
380,330,375.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
14,838,220,269.00
|
|
Contractor |
DUEX PROJECT LIMITED/HITECH CONSTRUCTION COMPANY LIMITED
|
|
| |
Procurement Stage |
Contract Stage
|
|
Status |
|
|
| |
|
| 359 |
| |
OCID |
ocds-gyl66f-521027003-04245
|
|
Project Title |
Construction and Provision of Housing
|
|
| |
Procurring Entity |
FEDERAL MEDICAL CENTRE - JABI ABUJA
|
|
|
|
| |
Budget Amount |
43,614,047.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 360 |
| |
OCID |
ocds-gyl66f-116001001-000002
|
|
Project Title |
REHABILITATION OF 2 UNITS OF 12 FAMILY CBQ, AND 1 UNIT OF MOQ (3 BEDROOM BUNGALOW) AT NIGERIAN ARMY
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
2,750,000,000.00
NGN
|
|
Budget year |
2019
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Tender Stage
|
|
Status |
|
|
| |
|
| 361 |
| |
OCID |
ocds-gyl66f-517029001-000001
|
|
Project Title |
Completion of Furnishing of NBTE Secretariat (New Wing)
|
|
| |
Procurring Entity |
NATIONAL BOARD FOR TECHNICAL EDUCATION
|
|
|
|
| |
Budget Amount |
10,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
3,546,000.00
|
|
Contractor |
Yeep Nigeria Company Limited
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 362 |
| |
OCID |
ocds-gyl66f-220002001-000001
|
|
Project Title |
Procurement of Computer Desktop
|
|
| |
Procurring Entity |
DEBT MANAGEMENT OFFICE
|
|
|
|
| |
Budget Amount |
9,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
7,560,000.00
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 363 |
| |
OCID |
ocds-gyl66f-513001001-000071
|
|
Project Title |
REHABILITATION AND MANAGEMENT OF NATIONAL YOUTH DEVELOPMENT CENTERS(NYDC)
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF YOUTH & SPORTS DEVELOPMENT - HQTRS
|
|
|
|
| |
Budget Amount |
58,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
27,904,275.00
|
|
Contractor |
Messrs Ansel Computers
|
|
| |
Procurement Stage |
Contract Stage
|
|
Status |
|
|
| |
|
| 364 |
| |
OCID |
ocds-gyl66f-513001001-000072
|
|
Project Title |
STOCK VERIFICATION UNIT EXERCISE
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF YOUTH & SPORTS DEVELOPMENT - HQTRS
|
|
|
|
| |
Budget Amount |
14,800,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 365 |
| |
OCID |
ocds-gyl66f-513001001-000073
|
|
Project Title |
BILATERAL RELATIONS ON YOUTH DEVELOPMENT AND JOB CREATION
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF YOUTH & SPORTS DEVELOPMENT - HQTRS
|
|
|
|
| |
Budget Amount |
20,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 366 |
| |
OCID |
ocds-gyl66f-513001001-000087
|
|
Project Title |
ESTABLISHMENT OF INNOVATION HUBS IN SELECTED UNIVERSITIES/COLLEGES ACROSS THE SIX GEOPOLITICAL ZONES
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF YOUTH & SPORTS DEVELOPMENT - HQTRS
|
|
|
|
| |
Budget Amount |
35,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 367 |
| |
OCID |
ocds-gyl66f-513001001-000088
|
|
Project Title |
INSTALLATION, TRAINING FEE, RECRUITMENT OF SPORTS SCIENTISTS TO RUN THE CENTER, WARRANTY EXTENSION A
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF YOUTH & SPORTS DEVELOPMENT - HQTRS
|
|
|
|
| |
Budget Amount |
105,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 368 |
| |
OCID |
ocds-gyl66f-513001001-000089
|
|
Project Title |
BALANCE PAYMENT FOR THE SUPPLY OF HIGH PERFORMANCE EQUIPMENTS
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF YOUTH & SPORTS DEVELOPMENT - HQTRS
|
|
|
|
| |
Budget Amount |
170,703,265.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 369 |
| |
OCID |
ocds-gyl66f-513001001-000090
|
|
Project Title |
PROCUREMENT OF PRESS/MEDIA EQUIPMENT
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF YOUTH & SPORTS DEVELOPMENT - HQTRS
|
|
|
|
| |
Budget Amount |
30,900,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 370 |
| |
OCID |
ocds-gyl66f-116001001-000011
|
|
Project Title |
CONSTRUCTION OF STUDENT CLASSROOMS IN NIGERIAN ARMY INSTITUTE OF TECHNOLOGY AND ENVIRONMENTAL STUDIE
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
200,000,000.00
$
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 371 |
| |
OCID |
ocds-gyl66f-116001001-000012
|
|
Project Title |
REHABILITATION OF 8 UNITS OF MOQ (3 BEDROOM BUNGALOW) AT NIGERIAN ARMY BARRACKS, MAIDUGURI, BORNO ST
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
300,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
77,746,408.76
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 372 |
| |
OCID |
ocds-gyl66f-116001001-000013
|
|
Project Title |
REHABILITATION OF 3 UNITS OF 12 FAMILY CBQ AT NWAGU BARRACKS, ABAKALIKI EBONYI STATE
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
300,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
92,287,032.88
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 373 |
| |
OCID |
ocds-gyl66f-220002001-000012
|
|
Project Title |
Procurement of Carpets and Rugs
|
|
| |
Procurring Entity |
DEBT MANAGEMENT OFFICE
|
|
|
|
| |
Budget Amount |
7,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 374 |
| |
OCID |
ocds-gyl66f-220002001-000013
|
|
Project Title |
Procurement of Office Tables and Chairs
|
|
| |
Procurring Entity |
DEBT MANAGEMENT OFFICE
|
|
|
|
| |
Budget Amount |
19,500,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 375 |
| |
OCID |
ocds-gyl66f-220002001-000014
|
|
Project Title |
Conduct of Debt Sustainability Analysis (DSA)
|
|
| |
Procurring Entity |
DEBT MANAGEMENT OFFICE
|
|
|
|
| |
Budget Amount |
16,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 376 |
| |
OCID |
ocds-gyl66f-116001001-000037
|
|
Project Title |
Construction of 8-Units of 3-Bedroom MOQ bungalow at AHQ Garrison Barracks, Abuja 4
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
300,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
118,618,430.00
|
|
Contractor |
M/S AYAN GLOBAL RESOURCES LTD
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 377 |
| |
OCID |
ocds-gyl66f-116001001-000186
|
|
Project Title |
LEGAL SERVICE TO SERVICES AND MILITARY INSTITUTIONS
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
25,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 378 |
| |
OCID |
ocds-gyl66f-116001001-000195
|
|
Project Title |
RESEARCH AND DEVELOPMENT
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
12,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 379 |
| |
OCID |
ocds-gyl66f-116001001-000196
|
|
Project Title |
ARM TRADE TREATY
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
100,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 380 |
| |
OCID |
ocds-gyl66f-111001001-000003
|
|
Project Title |
Renovation Work on 8 No. 2 B/R Flat at State House Security Quarters
|
|
| |
Procurring Entity |
STATE HOUSE - HQTRS
|
|
|
|
| |
Budget Amount |
284,587,922.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 381 |
| |
OCID |
ocds-gyl66f-111001001-000004
|
|
Project Title |
Provision of Network Infrastucture for old banquet hall (Conference Hall)
|
|
| |
Procurring Entity |
STATE HOUSE - HQTRS
|
|
|
|
| |
Budget Amount |
10,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 382 |
| |
OCID |
ocds-gyl66f-111001001-000005
|
|
Project Title |
Consultancy on Security Network with ASA Fundamentals
|
|
| |
Procurring Entity |
STATE HOUSE - HQTRS
|
|
|
|
| |
Budget Amount |
7,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 383 |
| |
OCID |
ocds-gyl66f-111001001-000006
|
|
Project Title |
Provision of Electronic Document Management System (EDMS)
|
|
| |
Procurring Entity |
STATE HOUSE - HQTRS
|
|
|
|
| |
Budget Amount |
93,659,025.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 384 |
| |
OCID |
ocds-gyl66f-111001001-000007
|
|
Project Title |
Fibre Connectivity to The Fire Service, Ceremonial Gate (MOPOL Office and Pilot Gate Lobby)
|
|
| |
Procurring Entity |
STATE HOUSE - HQTRS
|
|
|
|
| |
Budget Amount |
9,500,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 385 |
| |
OCID |
ocds-gyl66f-116001001-000208
|
|
Project Title |
Rehabilitation of 2 Units of 10 Family CBQ at Navy Town, Lagos.
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
300,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
53,241,384.54
|
|
Contractor |
MOBOL VENTURES LTD
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 386 |
| |
OCID |
ocds-gyl66f-116001001-000209
|
|
Project Title |
Rehabilitation of 6 Units of 2 Bedroom SNCO (Twin) Accommodation at NAF Base, Enugu, Enugu State.
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
300,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
65,787,683.91
|
|
Contractor |
MESSRS. KAPLAN
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 387 |
| |
OCID |
ocds-gyl66f-231001001-000019
|
|
Project Title |
PREPARATION OF OPERATIVE NATIONAL PHYSICAL DEVELOPMENT PLAN BY CONSORTIUM OF CONSULTANTS FOR 36 STAT
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
60,801,058.00
NGN
|
|
Budget year |
2019
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 388 |
| |
OCID |
ocds-gyl66f-231001001-000020
|
|
Project Title |
ACQUISITION OF GIS EQUIPMENT (HARDWARE ), DATA MINING SOFTWARE, SATELITE IMAGERIES AND HUMAN CAPACIT
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
30,210,711.00
NGN
|
|
Budget year |
2019
|
|
| |
Project Amount |
74,005,100.00
|
|
Contractor |
Messrs Powerbuild Nigeria Limited
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
| 389 |
| |
OCID |
ocds-gyl66f-513001001-000100
|
|
Project Title |
Review of National Youth Policy.
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF YOUTH & SPORTS DEVELOPMENT - HQTRS
|
|
|
|
| |
Budget Amount |
40,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 390 |
| |
OCID |
ocds-gyl66f-513001001-000113
|
|
Project Title |
Management of High Performance Center FCT, Abuja (as Per Subsystem Management Agreement)
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF YOUTH & SPORTS DEVELOPMENT - HQTRS
|
|
|
|
| |
Budget Amount |
30,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 391 |
| |
OCID |
ocds-gyl66f-513001001-000114
|
|
Project Title |
Rehabilitation and Re-Equiping of Lagos Sports Medicine Centre.
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF YOUTH & SPORTS DEVELOPMENT - HQTRS
|
|
|
|
| |
Budget Amount |
20,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
14,728,449.75
|
|
Contractor |
BACHON INTERNATIONAL LTD
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
| 392 |
| |
OCID |
ocds-gyl66f-513001001-000115
|
|
Project Title |
Specific Sports Equipment and Kits for the Youth Olympic Games.
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF YOUTH & SPORTS DEVELOPMENT - HQTRS
|
|
|
|
| |
Budget Amount |
30,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
23,259,079.68
|
|
Contractor |
GRACELAND GLOBAL LEGENDS LTD
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
| 393 |
| |
OCID |
ocds-gyl66f-513001001-000116
|
|
Project Title |
Specific Sports Equipment and Kits for the All African Youth Games.
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF YOUTH & SPORTS DEVELOPMENT - HQTRS
|
|
|
|
| |
Budget Amount |
30,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
27,248,662.00
|
|
Contractor |
JOPA DIGITAL CONCEPTS LIMITED
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
| 394 |
| |
OCID |
ocds-gyl66f-513001001-000117
|
|
Project Title |
Sport Kits for the Nigerian Universities Games.
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF YOUTH & SPORTS DEVELOPMENT - HQTRS
|
|
|
|
| |
Budget Amount |
5,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
4,370,485.00
|
|
Contractor |
ZINARY INVESTMENT BIZ. LTD
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
| 395 |
| |
OCID |
ocds-gyl66f-513001001-000130
|
|
Project Title |
Affiliation Fees/Congress by Sports Federation.
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF YOUTH & SPORTS DEVELOPMENT - HQTRS
|
|
|
|
| |
Budget Amount |
10,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 396 |
| |
OCID |
ocds-gyl66f-521027002-000004
|
|
Project Title |
completion of rehabilitation of internal roads
|
|
| |
Procurring Entity |
UNIVERSITY OF UYO TEACHING HOSPITAL
|
|
|
|
| |
Budget Amount |
34,578,810.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 397 |
| |
OCID |
ocds-gyl66f-521027002-000006
|
|
Project Title |
completion of construction of 2 storey laboratory building - phase ii
|
|
| |
Procurring Entity |
UNIVERSITY OF UYO TEACHING HOSPITAL
|
|
|
|
| |
Budget Amount |
70,924,156.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 398 |
| |
OCID |
ocds-gyl66f-228033001-000003
|
|
Project Title |
PURCHASE AND REFURBISHMENT OF FURNITURE AND ACCESSORIES, EQUIPMENT FOR GUEST CHALET, GUEST LOUNGE AN
|
|
| |
Procurring Entity |
NATIONAL CENTRE FOR TECHNOLOGY MANAGEMENT, HQTRS, ILE IFE
|
|
|
|
| |
Budget Amount |
20,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 399 |
| |
OCID |
ocds-gyl66f-231001001-000003
|
|
Project Title |
PROCUREMENT OF FIELD OFFICE SENSITIZATION EQUIPMENT
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
1,000,000.00
NGN
|
|
Budget year |
2019
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 400 |
| |
OCID |
ocds-gyl66f-231001001-000004
|
|
Project Title |
CREATION OF INTERNAL AND EXTERNAL DIRECTIONAL POST AND SIGNAGES
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
50,000,000.00
NGN
|
|
Budget year |
2019
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 401 |
| |
OCID |
ocds-gyl66f-231001001-000007
|
|
Project Title |
Construction of Displayed Board Reform
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
20,000,000.00
NGN
|
|
Budget year |
2019
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 402 |
| |
OCID |
ocds-gyl66f-231001001-000009
|
|
Project Title |
Purchase of Drugs / Medical Supply for use at the Ministry's Clinic
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
25,000,000.00
NGN
|
|
Budget year |
2019
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 403 |
| |
OCID |
ocds-gyl66f-231001001-000015
|
|
Project Title |
Updating, Priniting and Distribution of Service Charter of the Ministry to the State Field Offices
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
40,000,000.00
NGN
|
|
Budget year |
2020
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 404 |
| |
OCID |
ocds-gyl66f-513001001-000007
|
|
Project Title |
Inspection and Maintenance of Main Bowl and Velodrome Roofs
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF YOUTH & SPORTS DEVELOPMENT - HQTRS
|
|
|
|
| |
Budget Amount |
50,000,000.00
NGN
|
|
Budget year |
2016
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 405 |
| |
OCID |
ocds-gyl66f-231001001-000016
|
|
Project Title |
Acquisition of Coputer Hardware, Enterprise License Multimedia Software including Server Client Netw
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
20,000,000.00
NGN
|
|
Budget year |
2020
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 406 |
| |
OCID |
ocds-gyl66f-513001001-000013
|
|
Project Title |
Cleaning of Main Bowl and Offices National Stadium, Abuja
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF YOUTH & SPORTS DEVELOPMENT - HQTRS
|
|
|
|
| |
Budget Amount |
10,000,000.00
NGN
|
|
Budget year |
2016
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 407 |
| |
OCID |
ocds-gyl66f-513001001-000015
|
|
Project Title |
Electricity Package 'A'
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF YOUTH & SPORTS DEVELOPMENT - HQTRS
|
|
|
|
| |
Budget Amount |
15,000,000.00
NGN
|
|
Budget year |
2016
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 408 |
| |
OCID |
ocds-gyl66f-513001001-000020
|
|
Project Title |
Rehabilitation of Games Village
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF YOUTH & SPORTS DEVELOPMENT - HQTRS
|
|
|
|
| |
Budget Amount |
100,000,000.00
NGN
|
|
Budget year |
2016
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 409 |
| |
OCID |
ocds-gyl66f-513001001-000022
|
|
Project Title |
Replacement of Vandalised Cable
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF YOUTH & SPORTS DEVELOPMENT - HQTRS
|
|
|
|
| |
Budget Amount |
10,000,000.00
NGN
|
|
Budget year |
2016
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 410 |
| |
OCID |
ocds-gyl66f-513001001-000029
|
|
Project Title |
Regrassing of Main Bowl Pitch
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF YOUTH & SPORTS DEVELOPMENT - HQTRS
|
|
|
|
| |
Budget Amount |
25,000,000.00
NGN
|
|
Budget year |
2016
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 411 |
| |
OCID |
ocds-gyl66f-513001001-000031
|
|
Project Title |
Water Bills, Obafemi Awolowo Stadium
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF YOUTH & SPORTS DEVELOPMENT - HQTRS
|
|
|
|
| |
Budget Amount |
10,000,000.00
NGN
|
|
Budget year |
2016
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 412 |
| |
OCID |
ocds-gyl66f-513001001-000038
|
|
Project Title |
Water Bills, Ahmadu Bello Stadium
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF YOUTH & SPORTS DEVELOPMENT - HQTRS
|
|
|
|
| |
Budget Amount |
5,000,000.00
NGN
|
|
Budget year |
2016
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 413 |
| |
OCID |
ocds-gyl66f-513001001-000040
|
|
Project Title |
Terraflex Flooring of Indoors Sports Hall
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF YOUTH & SPORTS DEVELOPMENT - HQTRS
|
|
|
|
| |
Budget Amount |
50,000,000.00
NGN
|
|
Budget year |
2016
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 414 |
| |
OCID |
ocds-gyl66f-513001001-000045
|
|
Project Title |
Construction of Mini Sports Centre at Kano Municipal, Kano State
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF YOUTH & SPORTS DEVELOPMENT - HQTRS
|
|
|
|
| |
Budget Amount |
50,000,000.00
NGN
|
|
Budget year |
2016
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 415 |
| |
OCID |
ocds-gyl66f-513001001-000047
|
|
Project Title |
Construction of Mini Sports Centre at Rano, Kano South Senatorial District
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF YOUTH & SPORTS DEVELOPMENT - HQTRS
|
|
|
|
| |
Budget Amount |
70,000,000.00
NGN
|
|
Budget year |
2016
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 416 |
| |
OCID |
ocds-gyl66f-231001001-000018
|
|
Project Title |
Printing of National Code (Housing)
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
5,000,000.00
NGN
|
|
Budget year |
2020
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 417 |
| |
OCID |
ocds-gyl66f-521027003-02156
|
|
Project Title |
CONSTRUCTION OF HOSPITALS/HEALTH CENTRES
|
|
| |
Procurring Entity |
FEDERAL MEDICAL CENTRE - JABI ABUJA
|
|
|
|
| |
Budget Amount |
20,333,333.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 418 |
| |
OCID |
ocds-gyl66f-231001001-03171
|
|
Project Title |
REHABILITATION OF ONITSHA-ENUGU DUAL CARRIAGEWAY (4-CONTRACTS) IN ENUGU AND ANAMBRA STATES
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
6,000,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 419 |
| |
OCID |
ocds-gyl66f-521027003-03176
|
|
Project Title |
RENOVATION OF FMC JABI ABUJA
|
|
| |
Procurring Entity |
FEDERAL MEDICAL CENTRE - JABI ABUJA
|
|
|
|
| |
Budget Amount |
200,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 420 |
| |
OCID |
ocds-gyl66f-231001001-03178
|
|
Project Title |
REHABILITATION OF YOLA-HONG-MUBI ROAD IN ADAMAWA STATE
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
1,220,813,550.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 421 |
| |
OCID |
ocds-gyl66f-231001001-03210
|
|
Project Title |
REHABILITATION OF UMUAHIA (IKWUANO)-IKOT EKPENE ROAD (UMUAHIA-UMADIKE) IN ABIA STATE
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
380,330,375.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
13,296,283,968.66
|
|
Contractor |
HARTLAND NIGERIA LIMITED/RAYCON & COMPANY NIGERIA LIMITED
|
|
| |
Procurement Stage |
Contract Stage
|
|
Status |
|
|
| |
|
| 422 |
| |
OCID |
ocds-gyl66f-231001001-04212
|
|
Project Title |
RECONSTRUCTION OF IBADAN-IFE-ILESHA DUAL CARRIAGEWAY ON OYO/OSUN STATES
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
591,625,028.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
79,829,908,631.48
|
|
Contractor |
MESSRS KOPEK CONSTRUCTION LIMITED
|
|
| |
Procurement Stage |
Contract Stage
|
|
Status |
|
|
| |
|
| 423 |
| |
OCID |
ocds-gyl66f-521027003-04246
|
|
Project Title |
HIV/HEPATITIS/MALARLIA/LASSA FEVER AWARENESS CAMPAIGN AT GSS PHASE II KUBWA
|
|
| |
Procurring Entity |
FEDERAL MEDICAL CENTRE - JABI ABUJA
|
|
|
|
| |
Budget Amount |
30,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 424 |
| |
OCID |
ocds-gyl66f-517019002-000001
|
|
Project Title |
REHABILITATION OF COLLEGE EXISTING CLINIC
|
|
| |
Procurring Entity |
FEDERAL COLLEGE OF EDUCATION AKOKA
|
|
|
|
| |
Budget Amount |
28,831,682.25
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 425 |
| |
OCID |
ocds-gyl66f-220002001-000007
|
|
Project Title |
Purchase of 50 Computer Desktops and 30 Laptops
|
|
| |
Procurring Entity |
DEBT MANAGEMENT OFFICE
|
|
|
|
| |
Budget Amount |
6,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 426 |
| |
OCID |
ocds-gyl66f-220002001-000009
|
|
Project Title |
Procurement of Printers and Scanners
|
|
| |
Procurring Entity |
DEBT MANAGEMENT OFFICE
|
|
|
|
| |
Budget Amount |
1,600,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 427 |
| |
OCID |
ocds-gyl66f-513001001-000059
|
|
Project Title |
PURCHASE OF LIBRARY BOOKS AND EQUIPMENT
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF YOUTH & SPORTS DEVELOPMENT - HQTRS
|
|
|
|
| |
Budget Amount |
39,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 428 |
| |
OCID |
ocds-gyl66f-513001001-000061
|
|
Project Title |
NATIONAL YOUTH COUNCIL MEETING
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF YOUTH & SPORTS DEVELOPMENT - HQTRS
|
|
|
|
| |
Budget Amount |
50,150,900.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 429 |
| |
OCID |
ocds-gyl66f-513001001-000066
|
|
Project Title |
COMPUTER SOFTWARE ACQUISITION
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF YOUTH & SPORTS DEVELOPMENT - HQTRS
|
|
|
|
| |
Budget Amount |
67,973,200.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 430 |
| |
OCID |
ocds-gyl66f-513001001-000068
|
|
Project Title |
TIME TRIAL CYCLE
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF YOUTH & SPORTS DEVELOPMENT - HQTRS
|
|
|
|
| |
Budget Amount |
14,740,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 431 |
| |
OCID |
ocds-gyl66f-513001001-000075
|
|
Project Title |
PURCHASE OF OFFICE FURNITURE AND FITTINGS
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF YOUTH & SPORTS DEVELOPMENT - HQTRS
|
|
|
|
| |
Budget Amount |
161,101,880.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 432 |
| |
OCID |
ocds-gyl66f-513001001-000077
|
|
Project Title |
PURCHASE OF ROAD RACING CYCLE, CUSTOM MADE IN EVENT COLOURS CARBON FRAME, SHIMANO ULTEGRA EQUIPPED,
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF YOUTH & SPORTS DEVELOPMENT - HQTRS
|
|
|
|
| |
Budget Amount |
12,054,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 433 |
| |
OCID |
ocds-gyl66f-513001001-000084
|
|
Project Title |
YOUTH PARTICIPATION IN GOVERNANCE
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF YOUTH & SPORTS DEVELOPMENT - HQTRS
|
|
|
|
| |
Budget Amount |
100,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 434 |
| |
OCID |
ocds-gyl66f-513001001-000086
|
|
Project Title |
YOUTH IN AGRICULTURE
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF YOUTH & SPORTS DEVELOPMENT - HQTRS
|
|
|
|
| |
Budget Amount |
199,999,999.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 435 |
| |
OCID |
ocds-gyl66f-513001001-000091
|
|
Project Title |
SPECIFIC SPORT EQUIPMENT FOR COMMON WEALTH GAMES
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF YOUTH & SPORTS DEVELOPMENT - HQTRS
|
|
|
|
| |
Budget Amount |
99,998,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 436 |
| |
OCID |
ocds-gyl66f-513001001-000093
|
|
Project Title |
Payment of Electricity Bills of Pkg A & B, Abuja Stadium.
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF YOUTH & SPORTS DEVELOPMENT - HQTRS
|
|
|
|
| |
Budget Amount |
50,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 437 |
| |
OCID |
ocds-gyl66f-116001001-000007
|
|
Project Title |
PRODUCTION OF MINI DOCUMENTARY FOR THE MINISTRY OF DEFENCE HEADQUARTERS, ABUJA
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
10,500,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 438 |
| |
OCID |
ocds-gyl66f-116001001-000009
|
|
Project Title |
CONSTRUCTION OF STUDENT HOSTEL IN NIGERIAN ARMY INSTITUTE OF TECHNOLOGY AND ENVIRONMENTAL STUDIES (N
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
200,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
86,692,176.36
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
| 439 |
| |
OCID |
ocds-gyl66f-116001001-000014
|
|
Project Title |
REHABILITATION OF 3 UNITS OF 10 FAMILY CBQ AT ABAKPA BARRACKS, ENUGU, ENUGU STATE
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
250,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
87,242,594.99
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 440 |
| |
OCID |
ocds-gyl66f-116001001-000023
|
|
Project Title |
Construction of 3 Units of 10-Family CBQ at AHQ Garrison Barracks Abuja
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
1,100,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
138,818,528.89
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 441 |
| |
OCID |
ocds-gyl66f-116001001-000025
|
|
Project Title |
Construction of 7-Units of 2-Bedroom (Twin) SNCO at AHQ Garrison Barracks, Abuja
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
1,100,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
131,904,022.14
|
|
Contractor |
|
|
| |
Procurement Stage |
Contract Stage
|
|
Status |
|
|
| |
|
| 442 |
| |
OCID |
ocds-gyl66f-116001001-000027
|
|
Project Title |
Construction of 7-Units of 2-Bedroom(Twin) SNCO at AHQ Garrison Barracks, Abuja
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
1,100,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
130,195,592.92
|
|
Contractor |
M/S MARAINIYA
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 443 |
| |
OCID |
ocds-gyl66f-116001001-000032
|
|
Project Title |
Construction of 8-Units of 3-Bedroom MOQ bungalow at AHQ Garrison Barracks, Abuja 3
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
1,100,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
119,740,698.00
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 444 |
| |
OCID |
ocds-gyl66f-116001001-000034
|
|
Project Title |
Construction of 2-Units of Soldiers Quarters at AHQ Garrison, Abuja 2
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
300,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
154,787,258.01
|
|
Contractor |
M/S ROYAL OPERATION NIG LTD
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 445 |
| |
OCID |
ocds-gyl66f-116001001-000036
|
|
Project Title |
Construction of 8-Units of 3-Bedroom MOQ bungalow at Guards Brigade Barracks, Abuja 1
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
300,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
109,904,506.00
|
|
Contractor |
M/S PRORATA INVESTMENT LTD
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 446 |
| |
OCID |
ocds-gyl66f-116001001-000179
|
|
Project Title |
GEOGRAPHIC INFORMATION SYSTEM (GIS) FOR MILITARY LANDED PROPERTIES (ON-COING)
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
70,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 447 |
| |
OCID |
ocds-gyl66f-116001001-000182
|
|
Project Title |
AUDIT INSPECTION OF THE MAIN MINISTRY, SERVICES AND ITS INSTITUTION
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
20,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 448 |
| |
OCID |
ocds-gyl66f-116001001-000185
|
|
Project Title |
IMPLEMENTATION OF FREEDOM OF INFORMATION ACT (FOIA) (ON-GOING)
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
27,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 449 |
| |
OCID |
ocds-gyl66f-116001001-000191
|
|
Project Title |
ANNUAL MANDATORY CAPACITY DEVELOPMENT FOR ALL CADRE OF STAFF (ON-GOING)
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
120,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 450 |
| |
OCID |
ocds-gyl66f-116001001-000193
|
|
Project Title |
CLINICAL GOVERNANCE
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
10,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 451 |
| |
OCID |
ocds-gyl66f-116001001-000197
|
|
Project Title |
CLAIMS FOR LOSS/DAMAGES ON FORCEFUL CLOSURE OF 269 SHOPS AT GIWA BARRACKS, LAGOS
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
300,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 452 |
| |
OCID |
ocds-gyl66f-111001001-000001
|
|
Project Title |
Reconstruction and Furnishing the Security Building within the Villa including Extension od Bodyguar
|
|
| |
Procurring Entity |
STATE HOUSE - HQTRS
|
|
|
|
| |
Budget Amount |
42,628,061.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 453 |
| |
OCID |
ocds-gyl66f-116001001-000202
|
|
Project Title |
CONSTRUCTION OF 1 UNIT OF 2 BEDROOM BLOCK OF 4 FLATS AT 176 BARRACKS, GWAGWALADA, ABUJA
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
200,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
56,970,000.00
|
|
Contractor |
M/S TRAMASCO NIG. LTD
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
| 454 |
| |
OCID |
ocds-gyl66f-116001001-000207
|
|
Project Title |
Construction of 1 Unit of 1 Bedroom 4 Family SOQ at 177 Barracks, Keffi.
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
300,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
45,104,679.87
|
|
Contractor |
ICONS ARKITEKTUR-OCA LTD
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
| 455 |
| |
OCID |
ocds-gyl66f-513001001-000102
|
|
Project Title |
National Youth and Sports Council Meetings.
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF YOUTH & SPORTS DEVELOPMENT - HQTRS
|
|
|
|
| |
Budget Amount |
3,015,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 456 |
| |
OCID |
ocds-gyl66f-513001001-000104
|
|
Project Title |
Sitting Nigeria Youth Parliament and National Youth Council.
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF YOUTH & SPORTS DEVELOPMENT - HQTRS
|
|
|
|
| |
Budget Amount |
31,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 457 |
| |
OCID |
ocds-gyl66f-513001001-000109
|
|
Project Title |
Purchase of New Utility Vehicle, Project Vehicles and Staff Bus.
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF YOUTH & SPORTS DEVELOPMENT - HQTRS
|
|
|
|
| |
Budget Amount |
60,680,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
91,425,000.00
|
|
Contractor |
ASIMAH RESOURCES & INVESTMENT LTD
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
| 458 |
| |
OCID |
ocds-gyl66f-513001001-000111
|
|
Project Title |
Purchase of Diagnostic Equipment.
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF YOUTH & SPORTS DEVELOPMENT - HQTRS
|
|
|
|
| |
Budget Amount |
15,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 459 |
| |
OCID |
ocds-gyl66f-513001001-000118
|
|
Project Title |
Sporting Equipment to Federal Unity Schools.
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF YOUTH & SPORTS DEVELOPMENT - HQTRS
|
|
|
|
| |
Budget Amount |
5,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
3,778,620.00
|
|
Contractor |
ZIGMOND TECHNOLOGIES LTD
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
| 460 |
| |
OCID |
ocds-gyl66f-513001001-000120
|
|
Project Title |
General Cleaning, Landscaping of Pkg A, Abuja Stadium.
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF YOUTH & SPORTS DEVELOPMENT - HQTRS
|
|
|
|
| |
Budget Amount |
30,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 461 |
| |
OCID |
ocds-gyl66f-513001001-000127
|
|
Project Title |
2018 Commonwealth Games Equipment.
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF YOUTH & SPORTS DEVELOPMENT - HQTRS
|
|
|
|
| |
Budget Amount |
40,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 462 |
| |
OCID |
ocds-gyl66f-513001001-000129
|
|
Project Title |
Olympic & Paralympic Games Equipment.
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF YOUTH & SPORTS DEVELOPMENT - HQTRS
|
|
|
|
| |
Budget Amount |
10,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
8,324,400.00
|
|
Contractor |
MABTOS INT'L LTD
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
| 463 |
| |
OCID |
ocds-gyl66f-513001001-000134
|
|
Project Title |
Youth & Sports Information Mgt System
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF YOUTH & SPORTS DEVELOPMENT - HQTRS
|
|
|
|
| |
Budget Amount |
10,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 464 |
| |
OCID |
ocds-gyl66f-513001001-000136
|
|
Project Title |
Budget/Project Monitoring of Capital Projects such as Construction/Renovation of Sporting Facilities
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF YOUTH & SPORTS DEVELOPMENT - HQTRS
|
|
|
|
| |
Budget Amount |
30,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 465 |
| |
OCID |
ocds-gyl66f-513001001-000141
|
|
Project Title |
Capacity Building & Life Enhancement Programme.
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF YOUTH & SPORTS DEVELOPMENT - HQTRS
|
|
|
|
| |
Budget Amount |
50,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 466 |
| |
OCID |
ocds-gyl66f-517029001-000002
|
|
Project Title |
Quarterly Monitoring & Evaluation of Physical Development (Polys, TCs and Specialised-Federal Instit
|
|
| |
Procurring Entity |
NATIONAL BOARD FOR TECHNICAL EDUCATION
|
|
|
|
| |
Budget Amount |
50,320,369.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 467 |
| |
OCID |
ocds-gyl66f-513001001-000062
|
|
Project Title |
YOUTH EMPOWERMENT IN VOCATIONAL SKILLS
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF YOUTH & SPORTS DEVELOPMENT - HQTRS
|
|
|
|
| |
Budget Amount |
60,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 468 |
| |
OCID |
ocds-gyl66f-513001001-000063
|
|
Project Title |
NATIONAL YOUTH SENSITIZATION/ADVOCACY PROGRAMMES ON HIV/AIDS, DRUG ABUSE AND SEXUAL REPRODUCTIVE HEA
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF YOUTH & SPORTS DEVELOPMENT - HQTRS
|
|
|
|
| |
Budget Amount |
10,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 469 |
| |
OCID |
ocds-gyl66f-513001001-000064
|
|
Project Title |
STAFF EDUCATION AND ENLIGHTENMENT ON THE EVIL OF CORRUPTION
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF YOUTH & SPORTS DEVELOPMENT - HQTRS
|
|
|
|
| |
Budget Amount |
22,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 470 |
| |
OCID |
ocds-gyl66f-513001001-000065
|
|
Project Title |
SENSITIZATION TO STAFF ON SERVICE DELIVERY AND REFORM
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF YOUTH & SPORTS DEVELOPMENT - HQTRS
|
|
|
|
| |
Budget Amount |
8,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 471 |
| |
OCID |
ocds-gyl66f-513001001-000079
|
|
Project Title |
ESTABLISHMENT OF SIX(6) NO. OF CENTERS OF SPORTS EXCELLENCE IN EACH OF THE SIX(6) GEOPOLITICAL ZONES
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF YOUTH & SPORTS DEVELOPMENT - HQTRS
|
|
|
|
| |
Budget Amount |
200,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 472 |
| |
OCID |
ocds-gyl66f-513001001-000080
|
|
Project Title |
PARTICIPATION IN ICPC, EFCC AND OTHER CRIME-RELATED WORKSHOPS/SEMINARS BY ACTU MEMBERS
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF YOUTH & SPORTS DEVELOPMENT - HQTRS
|
|
|
|
| |
Budget Amount |
8,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 473 |
| |
OCID |
ocds-gyl66f-513001001-000081
|
|
Project Title |
NATIONAL YOUTH & SPORTS DEVELOPMENT ROAD MAP(FRAMEWORK)
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF YOUTH & SPORTS DEVELOPMENT - HQTRS
|
|
|
|
| |
Budget Amount |
60,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 474 |
| |
OCID |
ocds-gyl66f-513001001-000082
|
|
Project Title |
REVIEW OF NATIONAL YOUTH POLICY
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF YOUTH & SPORTS DEVELOPMENT - HQTRS
|
|
|
|
| |
Budget Amount |
50,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 475 |
| |
OCID |
ocds-gyl66f-513001001-000095
|
|
Project Title |
Repair/Maintenance of Generators at Pkg A.
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF YOUTH & SPORTS DEVELOPMENT - HQTRS
|
|
|
|
| |
Budget Amount |
30,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 476 |
| |
OCID |
ocds-gyl66f-513001001-000096
|
|
Project Title |
Supply of Diesel to Pkg A & B at National Stadium Abuja.
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF YOUTH & SPORTS DEVELOPMENT - HQTRS
|
|
|
|
| |
Budget Amount |
40,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 477 |
| |
OCID |
ocds-gyl66f-513001001-000097
|
|
Project Title |
Participation in ICPC, EFCC and Other Crime Related Programme by ACTU Members.
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF YOUTH & SPORTS DEVELOPMENT - HQTRS
|
|
|
|
| |
Budget Amount |
10,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 478 |
| |
OCID |
ocds-gyl66f-513001001-000098
|
|
Project Title |
Promotion of Transparency & Accountability by ACTU.
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF YOUTH & SPORTS DEVELOPMENT - HQTRS
|
|
|
|
| |
Budget Amount |
10,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 479 |
| |
OCID |
ocds-gyl66f-220002001-000011
|
|
Project Title |
Procurement of Air Conditioners
|
|
| |
Procurring Entity |
DEBT MANAGEMENT OFFICE
|
|
|
|
| |
Budget Amount |
3,500,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 480 |
| |
OCID |
ocds-gyl66f-116001001-000003
|
|
Project Title |
REHABILITATION OF 2 UNITS OF 12 FAMILY CBQ, AND 1 UNIT OF MOQ (3 BEDROOM \BUNGALOW) AT NIGERIAN ARMY
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
300,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
69,120,064.74
|
|
Contractor |
IIC CONSTRUCTION COMPANY
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 481 |
| |
OCID |
ocds-gyl66f-116001001-000004
|
|
Project Title |
REHABILITATION OF 2 UNITS OF 12 FAMILY CBQ, AND 1 UNIT OF MOQ (3 BEDROOM BUNGALOW) AT NIGERIAN ARMY
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
300,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
64,795,020.00
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 482 |
| |
OCID |
ocds-gyl66f-116001001-000005
|
|
Project Title |
REHABILITATION OF 7 UNITS OF 2 BED ROOM AT NIGERIAN ARMY BARRACKS, KANO, KANO STATE
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
300,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
70,870,094.98
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 483 |
| |
OCID |
ocds-gyl66f-116001001-000018
|
|
Project Title |
CONSTRUCTION OF NEW MILITARY BARRACK FOR GUARDS BRIGADE AND GARRISON IN ABUJA
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
1,100,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 484 |
| |
OCID |
ocds-gyl66f-116001001-000019
|
|
Project Title |
Construction of 8-Units of 3-Bedroom MOQ bungalow at Guards Brigade Barracks, Abuja
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
1,100,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
117,970,175.40
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 485 |
| |
OCID |
ocds-gyl66f-116001001-000020
|
|
Project Title |
Construction of 2-Units of Soldiers Quarters at Guards Brigade Barracks, Abuja
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
1,100,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
154,928,054.84
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 486 |
| |
OCID |
ocds-gyl66f-116001001-000021
|
|
Project Title |
Construction of 3 Units of 10-Family CBQ at Guards Brigade Barracks Abuja
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
1,100,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
137,128,873.61
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 487 |
| |
OCID |
ocds-gyl66f-116001001-000022
|
|
Project Title |
Construction of 8-Units of 3-Bedroom MOQ bungalow at AHQ Garrison Barracks, Abuja
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
1,100,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
109,176,742.00
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 488 |
| |
OCID |
ocds-gyl66f-116001001-000028
|
|
Project Title |
Construction of 7-Units of 2-Bedroom(Twin) SNCO at Guards Brigade Barracks, Abuja 1
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
300,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 489 |
| |
OCID |
ocds-gyl66f-116001001-000029
|
|
Project Title |
Construction of 8-Units of 3-Bedroom MOQ Bungalow at AHQ Garrison Barracks, Abuja 2
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
1,100,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 490 |
| |
OCID |
ocds-gyl66f-116001001-000030
|
|
Project Title |
Construction of 2-Units of Soldiers Quarters at Guards Brigade Barracks, Abuja 1
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
1,100,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
15,479,913.36
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 491 |
| |
OCID |
ocds-gyl66f-116001001-000031
|
|
Project Title |
Construction of 3 Units of 10-Family CBQ at Guards Brigade Barracks Abuja 1
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
1,100,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
138,818,528.89
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 492 |
| |
OCID |
ocds-gyl66f-116001001-000178
|
|
Project Title |
HIV/AIDS PREVENTION AND MANAGEMENT (CIVILIAN CELLS) (ON-GOING)
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
10,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 493 |
| |
OCID |
ocds-gyl66f-116001001-000183
|
|
Project Title |
REVIEW AND PRODUCTION OF GENERIC GUIDELINE AND COMPILATION OF REFORM IN MOD AND ITS AGENCIES (ON-GOI
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
20,500,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 494 |
| |
OCID |
ocds-gyl66f-116001001-000187
|
|
Project Title |
JOINT CONSULTATIVE COUNCIL ON DEFENCE SCHOOLS (ON-GOING)
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
38,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 495 |
| |
OCID |
ocds-gyl66f-116001001-000188
|
|
Project Title |
ARMED FORCES REMEMBRANCE DAY CELEBRATION AND VETERAN SERVICES (ON-GOING)
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
50,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 496 |
| |
OCID |
ocds-gyl66f-116001001-000189
|
|
Project Title |
SUPPORT TO NIGERIAN LEGION
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
30,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 497 |
| |
OCID |
ocds-gyl66f-116001001-000198
|
|
Project Title |
Rehabilitation of 3 Units of 10 Family CBQ at Army Barracks, Shadawanka, Bauchi.
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
300,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
81,557,877.45
|
|
Contractor |
PAZIM ENGINEERING LTD
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
| 498 |
| |
OCID |
ocds-gyl66f-116001001-000199
|
|
Project Title |
Rehabilitation of 4 Units of 2 Bedroom (Twin) SNCO and 3 Units of MOQ (3 Bedroom Bungalow) at NAF,
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
300,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
74,158,786.34
|
|
Contractor |
SEEGNAL NIG. LTD
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 499 |
| |
OCID |
ocds-gyl66f-513001001-000147
|
|
Project Title |
Counterpart Funding for Youth Development Programme in Collaboration with UNIDO
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF YOUTH & SPORTS DEVELOPMENT - HQTRS
|
|
|
|
| |
Budget Amount |
30,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 500 |
| |
OCID |
ocds-gyl66f-513001001-000149
|
|
Project Title |
Construction of Youth Centres at Ikire in Osun State.
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF YOUTH & SPORTS DEVELOPMENT - HQTRS
|
|
|
|
| |
Budget Amount |
30,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
28,809,938.00
|
|
Contractor |
SAINTS ENGINEERING SERVICE LTD
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|