| 1 |
| |
OCID |
ocds-gyl66f-521003001-00072
|
|
Project Title |
SUPPLY OF MEDICAL EQUIPMENT TO ERUERE-IULE HEALTH CENTRE IN OWAN WEST LGA EDO STATE
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
8,371,371.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 2 |
| |
OCID |
ocds-gyl66f-521003001-00073
|
|
Project Title |
PURCHASE OF MEDICAL EQUIPMENT AT OKURAI PRIMARY HEALTH CARE CENTRE, IBEJU/LEKKI FEDERAL CONSTITUENCY
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
20,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 3 |
| |
OCID |
ocds-gyl66f-521003001-00074
|
|
Project Title |
PROCUREMENT OF HOSPITAL BEDS FOR UMUAKWU HEALTH CENTRE
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
50,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 4 |
| |
OCID |
ocds-gyl66f-521003001-00075
|
|
Project Title |
CONSTRUCTION OF TYPE 3 PRIMARY HEALTH CENTRE IN UMUAKWU NSULU IN ISIALA NGWA NORTH LGA, ABIA STATE
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
50,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 5 |
| |
OCID |
ocds-gyl66f-521001001-00088
|
|
Project Title |
Construction of Model Occupational Health Centre in Abuja and Conduct of Routine Assessment visit.
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF HEALTH - HQTRS
|
|
|
|
| |
Budget Amount |
20,660,716.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 6 |
| |
OCID |
ocds-gyl66f-521003001-00089
|
|
Project Title |
Supply of Vitamin A Capsule (Red) - 200,000 iu
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
1,500,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 7 |
| |
OCID |
ocds-gyl66f-521003001-00090
|
|
Project Title |
Supply of Vitamin A Capsule (Blue) - 200,000 iu
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
1,500,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 8 |
| |
OCID |
ocds-gyl66f-521003001-00091
|
|
Project Title |
Procurement and distribution of Android Phones Communithy Engagement Persons (CEPs)
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
203,289,400.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 9 |
| |
OCID |
ocds-gyl66f-521003001-00105
|
|
Project Title |
SUPPLY OF DRUGS TO EHIME MBANO COMPRENSIVE HEALTH CENTER, IMO STATE
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
25,114,112.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 10 |
| |
OCID |
ocds-gyl66f-521003001-00106
|
|
Project Title |
RENOVATION OF PRIMARY HEALTH CARE CENTRE IN IME NSUGBE, ANAMBRA EAST LGA
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
6,278,528.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 11 |
| |
OCID |
ocds-gyl66f-521001001-01108
|
|
Project Title |
Procurement of Office Furniture and equipments
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF HEALTH - HQTRS
|
|
|
|
| |
Budget Amount |
40,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 12 |
| |
OCID |
ocds-gyl66f-521001001-01109
|
|
Project Title |
Purchase of Utility/maintenance Vehicles for FMOH and Liasion office in Lagos
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF HEALTH - HQTRS
|
|
|
|
| |
Budget Amount |
1,000,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 13 |
| |
OCID |
ocds-gyl66f-521001001-01110
|
|
Project Title |
supply of Telemedicine kioks to enhance quality of medical consumations
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF HEALTH - HQTRS
|
|
|
|
| |
Budget Amount |
300,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 14 |
| |
OCID |
ocds-gyl66f-521001001-01111
|
|
Project Title |
Provision and installation of buglary proof from ground floor to 3rd floor
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF HEALTH - HQTRS
|
|
|
|
| |
Budget Amount |
40,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 15 |
| |
OCID |
ocds-gyl66f-521003001-01124
|
|
Project Title |
SUPPLY OF MEDICA EQUIPMENTS TO PHC, ERUERE-IULEH,OWAN WEST LGA EDO STATE
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
8,371,371.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 16 |
| |
OCID |
ocds-gyl66f-521003001-01125
|
|
Project Title |
SUPPLY OF MEDICAL EQUIPMENT AND CONSUMABLE TO PHC CENTRES IN UMUEZEGWU IHITTE UBOMA LGA AND OBOWO L
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
14,649,899.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 17 |
| |
OCID |
ocds-gyl66f-521003001-01126
|
|
Project Title |
PROVISION OF HOSPITAL EQUIPMENT TO MATERNITY CENTER AT GENERAL HOSPITAL AYETORO EGBADO NORTH LGA, O
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
6,278,528.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 18 |
| |
OCID |
ocds-gyl66f-521003001-01127
|
|
Project Title |
SUPPLY OF MEDICAL EQUIPMENT TO PHC CENTRES IN ETHIOPE EAST OF ETHIOPE , DELTA STATE
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
12,557,056.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 19 |
| |
OCID |
ocds-gyl66f-521003001-01128
|
|
Project Title |
SUPPLY OF MEDICAL EQUIPMENTS TO DALWA PHC CENTER
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
12,557,056.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 20 |
| |
OCID |
ocds-gyl66f-521003001-01141
|
|
Project Title |
PROVISION AND EQUIPMENT OF THE PHC AT ANUOLUWAPO,HARMONY OREHOPE,TEMIDIRE HOUSING ESTATE
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
6,278,528.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 21 |
| |
OCID |
ocds-gyl66f-521003001-01142
|
|
Project Title |
PROVISION AND EQUIPMENT OF THE PHC AT EDO SENATORIAL DISTRICT
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
8,371,371.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 22 |
| |
OCID |
ocds-gyl66f-521003001-01143
|
|
Project Title |
SUPPLY OF HOSPITAL EQUIPMENT AT IKWO LGA
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
20,928,427.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 23 |
| |
OCID |
ocds-gyl66f-521003001-01144
|
|
Project Title |
CONSTRUCTION & EQUIPPING OF PRIMARY HEALTH CARE AT UMUCHIEZE
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
20,928,426.74
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 24 |
| |
OCID |
ocds-gyl66f-521003001-02145
|
|
Project Title |
EQUIPPING OF WORLD BANK HEALTH CENTRE WITH MODERN MEDICAL EQUIPMENT FOR GENERAL HOSPITAL OKENGWE IN
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
8,371,371.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 25 |
| |
OCID |
ocds-gyl66f-521003001-02146
|
|
Project Title |
SUPPLY OF MATERNITY AND PHC EQUIPMENTS AT KEBBI NORTH SENATORIAL DISTRICT
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
8,371,371.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 26 |
| |
OCID |
ocds-gyl66f-521003001-02147
|
|
Project Title |
PROVISION OF EQUIPMENT FOR RURAL HEALTH CENTRE AT SOKOTO SOUTH SENATORIAL DISTRICT
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
8,371,371.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 27 |
| |
OCID |
ocds-gyl66f-521003001-03181
|
|
Project Title |
EQUIPPING OF EZIAGU PHC AT ORUMBA SOUTH IN ANAMBRA
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
6,278,528.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 28 |
| |
OCID |
ocds-gyl66f-521003001-03182
|
|
Project Title |
SUPPLY OF HOSPITAL EQUIPMENTS, ZAMFARA NORTH SENATORIAL DISTRICT, ZAMFARA STATE.
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
8,371,371.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 29 |
| |
OCID |
ocds-gyl66f-521003001-03183
|
|
Project Title |
PROCUREMENT OF HOSPITAL EQUIPMENT AT BABURA GENERAL HOSPITAL JIGAWA STATE
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
8,371,371.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 30 |
| |
OCID |
ocds-gyl66f-521003001-03197
|
|
Project Title |
BASIC DRUGS/BASIC EQUIPMENTS FOR COMMUNITIES IN GADA/GORONYO FED CONSTITUENCY, SOKOTO STATE
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
40,900,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 31 |
| |
OCID |
ocds-gyl66f-521003001-03198
|
|
Project Title |
SUPPLY OF HOSPITAL EQUIPMENT IN CHIKUNRIGACHUKUN, KADUNA STATE
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
40,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 32 |
| |
OCID |
ocds-gyl66f-521003001-03199
|
|
Project Title |
SUPPLY OF HOSPITAL EQUIPMENT IN GIWA PHC IN KADUNA CENTRAL SENATORIAL DISTRICT KADUNA STATE
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
50,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 33 |
| |
OCID |
ocds-gyl66f-521003001-03200
|
|
Project Title |
SUPPLY OF MEDICAL EQIUPMENT TO 10 NOS. PHC: SHAFA-ABAKA, LOKO, KUVO, UDEGE, KANA, HADARI, AGWADA, GI
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
50,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 34 |
| |
OCID |
ocds-gyl66f-124004001-000059
|
|
Project Title |
PROCUREMENT OF 1200 UNITS OF LEG CUFFS
|
|
| |
Procurring Entity |
NIGERIA SECURITY AND CIVIL DEFENCE CORPS
|
|
|
|
| |
Budget Amount |
445,164,570.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 35 |
| |
OCID |
ocds-gyl66f-124004001-000060
|
|
Project Title |
PROCUREMENT OF 1200 UNITS OF TORCHLIGHT
|
|
| |
Procurring Entity |
NIGERIA SECURITY AND CIVIL DEFENCE CORPS
|
|
|
|
| |
Budget Amount |
445,164,570.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 36 |
| |
OCID |
ocds-gyl66f-124004001-000071
|
|
Project Title |
PROCUREMENT OF 1200 UNITS OF REFLECTIVE JACKET
|
|
| |
Procurring Entity |
NIGERIA SECURITY AND CIVIL DEFENCE CORPS
|
|
|
|
| |
Budget Amount |
445,164,570.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 37 |
| |
OCID |
ocds-gyl66f-124004001-000072
|
|
Project Title |
PROCUREMENT OF 1200 NOS. OF SHOCKING BATTON
|
|
| |
Procurring Entity |
NIGERIA SECURITY AND CIVIL DEFENCE CORPS
|
|
|
|
| |
Budget Amount |
445,164,570.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 38 |
| |
OCID |
ocds-gyl66f-124004001-000075
|
|
Project Title |
PROCUREMENT OF 1,500 UNITS OF STUN GUNS
|
|
| |
Procurring Entity |
NIGERIA SECURITY AND CIVIL DEFENCE CORPS
|
|
|
|
| |
Budget Amount |
445,164,570.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 39 |
| |
OCID |
ocds-gyl66f-124004001-000076
|
|
Project Title |
PROCUREMENT OF 27 UNITS OF HDP FILM TRANSFER
|
|
| |
Procurring Entity |
NIGERIA SECURITY AND CIVIL DEFENCE CORPS
|
|
|
|
| |
Budget Amount |
131,520,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 40 |
| |
OCID |
ocds-gyl66f-228046001-000037
|
|
Project Title |
SUPPLY AND INSTALLATION OF FULL PROXIMATE COMPOSITION EQUIPMENT
|
|
| |
Procurring Entity |
FEDERAL INSTITUTE OF INDUSTRIAL RESEARCH -OSHODI
|
|
|
|
| |
Budget Amount |
46,428,962.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 41 |
| |
OCID |
ocds-gyl66f-124004001-000077
|
|
Project Title |
PROCUREMENT OF 2 UNITS OF IDENTITY RETRIEVER / VERIFICATION APPLICATION WITH MULTIPLE CREDENTIAL TEC
|
|
| |
Procurring Entity |
NIGERIA SECURITY AND CIVIL DEFENCE CORPS
|
|
|
|
| |
Budget Amount |
131,520,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 42 |
| |
OCID |
ocds-gyl66f-124004001-000088
|
|
Project Title |
PROCUREMENTPROCUREMENT OF 300 BOXES ICED FISH OF 70 NOS. GLUCOSE D 400G
|
|
| |
Procurring Entity |
NIGERIA SECURITY AND CIVIL DEFENCE CORPS
|
|
|
|
| |
Budget Amount |
104,564,600.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 43 |
| |
OCID |
ocds-gyl66f-124004001-000089
|
|
Project Title |
PROCUREMENT OF 250 NOS. GRAVY TRAIN CHICKEN/BEEF
|
|
| |
Procurring Entity |
NIGERIA SECURITY AND CIVIL DEFENCE CORPS
|
|
|
|
| |
Budget Amount |
104,564,600.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 44 |
| |
OCID |
ocds-gyl66f-124004001-000090
|
|
Project Title |
PROCUREMENT OF 350 NOS. K9 CHOPPED BEEF
|
|
| |
Procurring Entity |
NIGERIA SECURITY AND CIVIL DEFENCE CORPS
|
|
|
|
| |
Budget Amount |
104,564,600.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 45 |
| |
OCID |
ocds-gyl66f-517023001-000003
|
|
Project Title |
Purchase of Computers, Teaching/Learning Aid Equipment
|
|
| |
Procurring Entity |
FEDERAL UNIVERSITY OF PETROLEUM RESOURCES, EFFURUN
|
|
|
|
| |
Budget Amount |
40,392,319.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 46 |
| |
OCID |
ocds-gyl66f-517023001-000004
|
|
Project Title |
Rehabilitation/Repairs of Office Buildings/Housing
|
|
| |
Procurring Entity |
FEDERAL UNIVERSITY OF PETROLEUM RESOURCES, EFFURUN
|
|
|
|
| |
Budget Amount |
15,155,323.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 47 |
| |
OCID |
ocds-gyl66f-517023001-000005
|
|
Project Title |
Construction/Provision of Office Buildings/Hospitals/Health Centres/Water Facilities
|
|
| |
Procurring Entity |
FEDERAL UNIVERSITY OF PETROLEUM RESOURCES, EFFURUN
|
|
|
|
| |
Budget Amount |
153,797,134.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 48 |
| |
OCID |
ocds-gyl66f-517023001-000006
|
|
Project Title |
Purchase of Health/Medical Equipment and items/drugs
|
|
| |
Procurring Entity |
FEDERAL UNIVERSITY OF PETROLEUM RESOURCES, EFFURUN
|
|
|
|
| |
Budget Amount |
7,100,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 49 |
| |
OCID |
ocds-gyl66f-521027025-000019
|
|
Project Title |
TRAINING AND CAPACITY BUILDING
|
|
| |
Procurring Entity |
FEDERAL MEDICAL CENTRE, ASABA
|
|
|
|
| |
Budget Amount |
100,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 50 |
| |
OCID |
ocds-gyl66f-521027025-000020
|
|
Project Title |
FREE MEDICAL OUTREACH AT SAPELE/OKPE/UVWIE FED. CON. DELTA STATE
|
|
| |
Procurring Entity |
FEDERAL MEDICAL CENTRE, ASABA
|
|
|
|
| |
Budget Amount |
20,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 51 |
| |
OCID |
ocds-gyl66f-521027025-000021
|
|
Project Title |
MEDICAL OUTREACH TO BOMADI L.G.A (BOMADI/PATANI FED. CON.) DELTA STATE
|
|
| |
Procurring Entity |
FEDERAL MEDICAL CENTRE, ASABA
|
|
|
|
| |
Budget Amount |
25,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 52 |
| |
OCID |
ocds-gyl66f-521027025-000022
|
|
Project Title |
FREE MEDICAL OUTREACH TO BOMADI L.G.A (BOMADI/PATANI FEDERAL CONSTITUENCY) DELTA STATE
|
|
| |
Procurring Entity |
FEDERAL MEDICAL CENTRE, ASABA
|
|
|
|
| |
Budget Amount |
25,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 53 |
| |
OCID |
ocds-gyl66f-521027025-000024
|
|
Project Title |
PURCHASE OF METAL CHAIRS FOR OFFICES AND WARDS IN FEDERAL MEDICAL CENTRE ASABA, DELTA STATE
|
|
| |
Procurring Entity |
FEDERAL MEDICAL CENTRE, ASABA
|
|
|
|
| |
Budget Amount |
50,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 54 |
| |
OCID |
ocds-gyl66f-517023001-000008
|
|
Project Title |
Purchase of Computers, Teaching/Learning Aid Equipment
|
|
| |
Procurring Entity |
FEDERAL UNIVERSITY OF PETROLEUM RESOURCES, EFFURUN
|
|
|
|
| |
Budget Amount |
22,000,000.00
NGN
|
|
Budget year |
2019
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 55 |
| |
OCID |
ocds-gyl66f-517023001-000009
|
|
Project Title |
Construction/Provision of Office Buildings/Hospitals/Health Centres/Water Facilities
|
|
| |
Procurring Entity |
FEDERAL UNIVERSITY OF PETROLEUM RESOURCES, EFFURUN
|
|
|
|
| |
Budget Amount |
7,832,141.72
NGN
|
|
Budget year |
2019
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 56 |
| |
OCID |
ocds-gyl66f-521027025-000025
|
|
Project Title |
MEDICAL OUTREACH FOR NNEWI NORTH, ANAMBRA STATE
|
|
| |
Procurring Entity |
FEDERAL MEDICAL CENTRE, ASABA
|
|
|
|
| |
Budget Amount |
25,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 57 |
| |
OCID |
ocds-gyl66f-521027025-000026
|
|
Project Title |
MEDICAL OUTREACH FOR NNEWI SOUTH FEDERAL CONSTITUENCY OF ANAMBRA STATE
|
|
| |
Procurring Entity |
FEDERAL MEDICAL CENTRE, ASABA
|
|
|
|
| |
Budget Amount |
25,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 58 |
| |
OCID |
ocds-gyl66f-521027025-000027
|
|
Project Title |
MEDICAL OUTREACH TO EKWUSIGO, ANAMBRA STATE
|
|
| |
Procurring Entity |
FEDERAL MEDICAL CENTRE, ASABA
|
|
|
|
| |
Budget Amount |
22,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 59 |
| |
OCID |
ocds-gyl66f-220015001-000005
|
|
Project Title |
SUPPLY OF BEVERAGES FOR JUNE 2017
|
|
| |
Procurring Entity |
PENSION TRANSITIONAL ARRANGEMENT DEPARTMENT (PTAD) HQTRS
|
|
|
|
| |
Budget Amount |
2,451,857.52
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 60 |
| |
OCID |
ocds-gyl66f-220015001-000006
|
|
Project Title |
PROCUREMENT OF CYBEROAM NETWORK FIREWALL LICENSE RENEWAL FOR ONE YEAR
|
|
| |
Procurring Entity |
PENSION TRANSITIONAL ARRANGEMENT DEPARTMENT (PTAD) HQTRS
|
|
|
|
| |
Budget Amount |
545,324.06
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 61 |
| |
OCID |
ocds-gyl66f-220015001-000007
|
|
Project Title |
SUPPLY OF COMPUTER CONSUMABLES JUNE 2017
|
|
| |
Procurring Entity |
PENSION TRANSITIONAL ARRANGEMENT DEPARTMENT (PTAD) HQTRS
|
|
|
|
| |
Budget Amount |
2,394,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 62 |
| |
OCID |
ocds-gyl66f-521003001-04216
|
|
Project Title |
SUPPLY OF DIALYSIS WATER TREATMENT PLANT MACHINE AND ACCESSORIES TO ALUSHI, NASSARAWA EGGON, NASSAR
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
6,278,528.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 63 |
| |
OCID |
ocds-gyl66f-521003001-04217
|
|
Project Title |
SUPPLY AND INSTALLATION OF 4NOS DIALYSIS MACHINES IN NASARAWA EGON , NASARAWA STATE
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
16,742,741.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 64 |
| |
OCID |
ocds-gyl66f-521003001-04218
|
|
Project Title |
SUPPLY OF DIALYSIS WATER TREATMENT PLANT MACHINES & ACCESSORIES TO EHIME MBANO, IHITTE, UBOMA, OBOW
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
41,856,853.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 65 |
| |
OCID |
ocds-gyl66f-521003001-04219
|
|
Project Title |
SUPPLY OF EQUIPMENT FOR DIALYSIS CENTRE SCREENING LABORATORY, AUCHI, EDO NORTH SENATORIAL DISTRICT,
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
15,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 66 |
| |
OCID |
ocds-gyl66f-521003001-04233
|
|
Project Title |
PURCHASE OF MEDICAL EQUIPMENT TO PHC CENTRES IN OKIGWE SOUTH FEDERAL CONSTITUENCY, IMO STATE
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
26,788,386.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 67 |
| |
OCID |
ocds-gyl66f-521003001-04234
|
|
Project Title |
SUPPLY OF MEDICAL/ HOSPITAL EQUIPMENT TO HEALTH CENTRES IN EHIME MBANO LGA IMO STATE
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
29,299,797.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 68 |
| |
OCID |
ocds-gyl66f-20-04268
|
|
Project Title |
IMPLEMENTATION OF THE NATIONAL BROADBAND PLAN (POLICY)
|
|
| |
Procurring Entity |
MINISTRY OF COMMUNICATION AND DIGITAL ECONOMY
|
|
|
|
| |
Budget Amount |
54,460,643.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 69 |
| |
OCID |
ocds-gyl66f-521003001-04269
|
|
Project Title |
RENOVATION AND FURNISHING OF PRIMARY HEALTH CENTRE IN OSAA UKWU VILLAGE IN OBINGWA LGA OF ABIA STATE
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
50,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 70 |
| |
OCID |
ocds-gyl66f-521049001-00067
|
|
Project Title |
Supply of ICT Items
|
|
| |
Procurring Entity |
NATIONAL HOSPITAL ABUJA
|
|
|
|
| |
Budget Amount |
60,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 71 |
| |
OCID |
ocds-gyl66f-521003001-00069
|
|
Project Title |
CONSTRUCTION OF TWO BLOCKS OF IN-PATIENT WARD AT KARAYE COTTAGE HOSPITAL
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
20,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 72 |
| |
OCID |
ocds-gyl66f-521003001-00071
|
|
Project Title |
SUPPLY OF MEDICAL EQUIPMENT TO OBODOOKWU HEALTH CENTRE IN IDEATO SOUTH LGA OF IMO STATE
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
8,371,370.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 73 |
| |
OCID |
ocds-gyl66f-521003001-00076
|
|
Project Title |
EQUIPPING/FURNISHING OF ONUAKU HEALTH CENTRE UTURU, ISUKWUATO LGA, ABIA STATE
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
20,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 74 |
| |
OCID |
ocds-gyl66f-521003001-00078
|
|
Project Title |
CONSTRUCTION OF HEALTH CENTRE AT UKWA EAST/WEST FEDERAL CONSTITUENCY, ABIA STATE
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
30,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 75 |
| |
OCID |
ocds-gyl66f-111011001-00085
|
|
Project Title |
Printing of Security & Non Security Documents
|
|
| |
Procurring Entity |
NIGERIA EXTRACTIVE INDUSTRIES TRANSPARENCY INITIATIVE (NEITI)
|
|
|
|
| |
Budget Amount |
2,232,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 76 |
| |
OCID |
ocds-gyl66f-521001001-00087
|
|
Project Title |
Computerisation of the Procurement Department
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF HEALTH - HQTRS
|
|
|
|
| |
Budget Amount |
20,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 77 |
| |
OCID |
ocds-gyl66f-521001001-00092
|
|
Project Title |
Construction of Isolation Ward at University of Abuja Teaching Hospital, Gwagwalada, Procurement and
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF HEALTH - HQTRS
|
|
|
|
| |
Budget Amount |
1,500,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 78 |
| |
OCID |
ocds-gyl66f-521001001-00094
|
|
Project Title |
First step of Multi-yearCapacity Strenthening for the Department following a Functional review and C
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF HEALTH - HQTRS
|
|
|
|
| |
Budget Amount |
25,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 79 |
| |
OCID |
ocds-gyl66f-521001001-00096
|
|
Project Title |
Training of Oxygen Utilization and Advocacy to implement Oxygen Policy.
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF HEALTH - HQTRS
|
|
|
|
| |
Budget Amount |
6,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 80 |
| |
OCID |
ocds-gyl66f-521001001-00101
|
|
Project Title |
Purchase & Installation of Incinerators to be Distributed to Health Institutions
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF HEALTH - HQTRS
|
|
|
|
| |
Budget Amount |
100,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 81 |
| |
OCID |
ocds-gyl66f-521003001-00103
|
|
Project Title |
Procurement and distribution of Ready to Ready to use Therapautic Food.
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
59,963,400.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 82 |
| |
OCID |
ocds-gyl66f-521001001-01105
|
|
Project Title |
Refurbushing of Ministry's Vehicles
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF HEALTH - HQTRS
|
|
|
|
| |
Budget Amount |
40,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 83 |
| |
OCID |
ocds-gyl66f-521003001-01107
|
|
Project Title |
RENOVATION OF PHCs IN NJABA LGA,IMO STATE
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
14,649,898.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 84 |
| |
OCID |
ocds-gyl66f-521003001-01112
|
|
Project Title |
CONSTRUCTION OF PRIMARY HEALTH CARE CENTRE IN GIREI, ADAMAWA STATE.
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
24,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 85 |
| |
OCID |
ocds-gyl66f-521003001-01114
|
|
Project Title |
SUPPLY OF MEDICAL/ HOSPITAL EQUIPMENT TO COTTAGE HOSPITAL EZIOHA MMAKU AGWU LGA, ENUGU STATE
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
12,557,056.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 86 |
| |
OCID |
ocds-gyl66f-521003001-01121
|
|
Project Title |
SUPPLY OF MEDICAL EQUIPMENTS TO AJEROMI FED CONST THE PHC CENTE LAGOS STATE
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
8,371,371.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 87 |
| |
OCID |
ocds-gyl66f-521003001-01123
|
|
Project Title |
EQUIPPING OF OTHER HEALTH CENTERS IN IDEATO NORTH LGA IMO STATE
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
12,557,056.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 88 |
| |
OCID |
ocds-gyl66f-521003001-01130
|
|
Project Title |
SUPPLY OF DRUGS TO PHC CENTRES AT UKANA IKOT IDEH IN ESSIEN UDIM LGA, AKWA-IBOM STATE
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
16,742,741.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 89 |
| |
OCID |
ocds-gyl66f-521003001-01132
|
|
Project Title |
SUPPLY OF MEDICAL EQUIPMENT/FACILITIES FOR VARIOUS HEALTH CENTRES IN KAUGAMA /MALAMMADORI JIGAWA STA
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
6,278,528.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 90 |
| |
OCID |
ocds-gyl66f-521003001-01137
|
|
Project Title |
PROCUREMENT OF HOSPITAL EQUIPMENTS /CONSUMABLES AND AMBULANCE FOR MBANO JOINT HOSPITAL, IMO STATE.
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
20,928,427.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 91 |
| |
OCID |
ocds-gyl66f-521003001-01139
|
|
Project Title |
SCIENTIFIC EQUIPMENT AT OKA-AKOKO
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
8,371,371.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 92 |
| |
OCID |
ocds-gyl66f-521003001-02148
|
|
Project Title |
PROVISION OF MEDICAL EQUIPMENT AT MAYO BELWA LGA
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
8,371,371.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 93 |
| |
OCID |
ocds-gyl66f-521003001-02150
|
|
Project Title |
CONSTRUCTION AND EQUIPPING OF PHC IN AMURI NKANU WEST LGA
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
6,278,528.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 94 |
| |
OCID |
ocds-gyl66f-521003001-03184
|
|
Project Title |
PROCUREMENT OF HOSPITAL EQUIPMENT AT GUMEL GENERAL HOSPITAL, JIGAWA STATE
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
8,371,371.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 95 |
| |
OCID |
ocds-gyl66f-521003001-03186
|
|
Project Title |
SUPPLY OF MEDICAL EQUIPMENT TO HOSPITALS IN DUTSINMA AND JIBIA LGAS OF KATSINA CENTRAL SENATORIAL DI
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
50,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 96 |
| |
OCID |
ocds-gyl66f-521003001-03193
|
|
Project Title |
PROVISION FOR THE RE-INVIGORATION OF ASANG PHC NSIT IBOM LOCAL GOVERNMENT AREA, AKWA IBOM STATE
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
10,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 97 |
| |
OCID |
ocds-gyl66f-521003001-03195
|
|
Project Title |
SUPPLIES OF MEDICAL EQUIPMENT/HEALTH OUTREACH IN OBANGEDE OKEHI LGA, KOGI STATE
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
20,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 98 |
| |
OCID |
ocds-gyl66f-521003001-03202
|
|
Project Title |
MEDICAL EQUIPMENTS AT ISHIELU & EZZA SOUTH OF EBONYI, UKWA WEST ABIA, NKANU E&W ENUGU, IKEDURU IMO
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
18,573,829.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 99 |
| |
OCID |
ocds-gyl66f-521003001-03204
|
|
Project Title |
SUPPLY OF MEDICAL EQUIPMENTS AT OBANGEDE, OKENGWE OKENE IN KOGI STATE
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
12,557,056.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 100 |
| |
OCID |
ocds-gyl66f-124004001-000057
|
|
Project Title |
PROCUREMENT OF 1500 UNITS OF HAND CUFFS
|
|
| |
Procurring Entity |
NIGERIA SECURITY AND CIVIL DEFENCE CORPS
|
|
|
|
| |
Budget Amount |
445,164,570.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 101 |
| |
OCID |
ocds-gyl66f-124004001-000062
|
|
Project Title |
PROCUREMENT OF 300 NOS. GENTAMYCIN INJ
|
|
| |
Procurring Entity |
NIGERIA SECURITY AND CIVIL DEFENCE CORPS
|
|
|
|
| |
Budget Amount |
104,564,600.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 102 |
| |
OCID |
ocds-gyl66f-124004001-000068
|
|
Project Title |
PROCUREMENT OF 144 NOS. AMIRAZ
|
|
| |
Procurring Entity |
NIGERIA SECURITY AND CIVIL DEFENCE CORPS
|
|
|
|
| |
Budget Amount |
104,564,600.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 103 |
| |
OCID |
ocds-gyl66f-124004001-000070
|
|
Project Title |
PROCUREMENT OF 100 NOS. IRON DEXTRAN (VET PREPARATION)
|
|
| |
Procurring Entity |
NIGERIA SECURITY AND CIVIL DEFENCE CORPS
|
|
|
|
| |
Budget Amount |
104,564,600.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 104 |
| |
OCID |
ocds-gyl66f-124004001-000073
|
|
Project Title |
PROCUREMENT OF 699 NOS. EXAMINATION GLOVES
|
|
| |
Procurring Entity |
NIGERIA SECURITY AND CIVIL DEFENCE CORPS
|
|
|
|
| |
Budget Amount |
104,564,600.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 105 |
| |
OCID |
ocds-gyl66f-521003001-04270
|
|
Project Title |
REVITALIZATION OF PHC IN ISIUKWANTO,BENDE,AROCHUKWU,BENDE AND OHAFIA ABIA STATE
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
31,392,640.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 106 |
| |
OCID |
ocds-gyl66f-124004001-000102
|
|
Project Title |
PROCUREMENT OF 100 NOS. WALL PENETRATORS (WALL HAS EAR)
|
|
| |
Procurring Entity |
NIGERIA SECURITY AND CIVIL DEFENCE CORPS
|
|
|
|
| |
Budget Amount |
254,209,194.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 107 |
| |
OCID |
ocds-gyl66f-124004001-000103
|
|
Project Title |
PROCUREMENT OF 5 NOS.BLASTING MACHINE
|
|
| |
Procurring Entity |
NIGERIA SECURITY AND CIVIL DEFENCE CORPS
|
|
|
|
| |
Budget Amount |
254,209,194.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 108 |
| |
OCID |
ocds-gyl66f-124004001-000104
|
|
Project Title |
PROCUREMENT OF 5 NOS.RADIATION MONITOR
|
|
| |
Procurring Entity |
NIGERIA SECURITY AND CIVIL DEFENCE CORPS
|
|
|
|
| |
Budget Amount |
254,209,194.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 109 |
| |
OCID |
ocds-gyl66f-124004001-000105
|
|
Project Title |
PROCUREMENT OF 10 NOS. DECONTAMINATION KIT (PART NO. 4525-561)
|
|
| |
Procurring Entity |
NIGERIA SECURITY AND CIVIL DEFENCE CORPS
|
|
|
|
| |
Budget Amount |
254,209,194.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 110 |
| |
OCID |
ocds-gyl66f-124004001-000115
|
|
Project Title |
PROCUREMENT OF 300 NOS. RAIN BOOTS
|
|
| |
Procurring Entity |
NIGERIA SECURITY AND CIVIL DEFENCE CORPS
|
|
|
|
| |
Budget Amount |
104,564,600.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 111 |
| |
OCID |
ocds-gyl66f-124004001-000121
|
|
Project Title |
PROCUREMENT OF 1,800 NOS. DISINFECTANT (MORIGAT)
|
|
| |
Procurring Entity |
NIGERIA SECURITY AND CIVIL DEFENCE CORPS
|
|
|
|
| |
Budget Amount |
104,564,600.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 112 |
| |
OCID |
ocds-gyl66f-124004001-000122
|
|
Project Title |
PROCUREMENT OF 1,200 NOS. TIE OUT CHAIN
|
|
| |
Procurring Entity |
NIGERIA SECURITY AND CIVIL DEFENCE CORPS
|
|
|
|
| |
Budget Amount |
104,564,600.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 113 |
| |
OCID |
ocds-gyl66f-124004001-000123
|
|
Project Title |
PROCUREMENT OF 1,100 NOS. CHAIN LEASHES WITH LEATHER
|
|
| |
Procurring Entity |
NIGERIA SECURITY AND CIVIL DEFENCE CORPS
|
|
|
|
| |
Budget Amount |
104,564,600.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 114 |
| |
OCID |
ocds-gyl66f-124004001-000124
|
|
Project Title |
PROCUREMENT OF 10,000 NOS.WATER DIONIZER
|
|
| |
Procurring Entity |
NIGERIA SECURITY AND CIVIL DEFENCE CORPS
|
|
|
|
| |
Budget Amount |
150,118,500.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 115 |
| |
OCID |
ocds-gyl66f-521003001-04283
|
|
Project Title |
REVITALIZATION AND EQUIPING OF 8 NO PHC IN MBAITOLI LGA, IMO STATE
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
16,742,741.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 116 |
| |
OCID |
ocds-gyl66f-521003001-04284
|
|
Project Title |
REVITALIZATION AND EQUIPING OF 8 NO PHC IN OHAJI EGBEMA LGA, IMO STATE
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
16,742,741.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 117 |
| |
OCID |
ocds-gyl66f-521003001-04285
|
|
Project Title |
REVITALIZATION AND EQUIPING OF 8 NO PHC IN ORLU LGA, IMO STATE
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
16,742,741.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 118 |
| |
OCID |
ocds-gyl66f-521003001-04286
|
|
Project Title |
REVITALIZATION AND EQUIPING OF 8 NO PHC IN ORSU LGA, IMO STATE
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
16,742,741.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 119 |
| |
OCID |
ocds-gyl66f-521003001-04300
|
|
Project Title |
REVITALIZATION AND EQUIPING OF 6NO PHC IN IHITTE UBOMA LGA, IMO STATE
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
14,649,899.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 120 |
| |
OCID |
ocds-gyl66f-521003001-04301
|
|
Project Title |
REVITALISATION /EQUIPING OF 4 NOS PHC CENTRES IN ONUIMO LGA, IMO STATE
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
12,557,056.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 121 |
| |
OCID |
ocds-gyl66f-521003001-04302
|
|
Project Title |
REVITILISATION & EQUIPING OF 5 NOS PHCS IN NWANGELE LGA. IMO STATE
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
12,557,056.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 122 |
| |
OCID |
ocds-gyl66f-521003001-04303
|
|
Project Title |
REVITALIZATION OF PHC CENTRES IN DOKA MAIJAMA'S, CHIKUM LGA, KADUNA STATE
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
8,371,371.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 123 |
| |
OCID |
ocds-gyl66f-521003001-04316
|
|
Project Title |
REVITALIZATION AND EQUIPPING OF TWO CLINICS AT LANGTANG SOUTH IN LANGTANG NORTH/SOUTH FEDERAL CONSTI
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
12,557,056.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 124 |
| |
OCID |
ocds-gyl66f-521003001-04317
|
|
Project Title |
RENOVATION OF PHC AT DUKAMAJE, GADA LGA, SOKOTO STATE
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
30,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 125 |
| |
OCID |
ocds-gyl66f-521003001-04318
|
|
Project Title |
REHABILITATION OF EXISTING PHC AT GANDUN SARKI,MADURI LGA
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
8,371,371.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 126 |
| |
OCID |
ocds-gyl66f-124004001-000001
|
|
Project Title |
COMPLETION OF ADDITIONAL CLASSROOMS AT SAUKA ABUJA AND OGUN STATE
|
|
| |
Procurring Entity |
NIGERIA SECURITY AND CIVIL DEFENCE CORPS
|
|
|
|
| |
Budget Amount |
93,868,074.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 127 |
| |
OCID |
ocds-gyl66f-20-000001
|
|
Project Title |
SUPPLY AND DISTRIBUTION OF ICT MATERIAL TO SCHOOL IN IBADAN SOUTHWEST LGA OYO STATE
|
|
| |
Procurring Entity |
MINISTRY OF COMMUNICATION AND DIGITAL ECONOMY
|
|
|
|
| |
Budget Amount |
41,616,589.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 128 |
| |
OCID |
ocds-gyl66f-229031009-000005
|
|
Project Title |
Printing of Non-Security Document (Planning and Research Document)
|
|
| |
Procurring Entity |
NIGERIAN MARITIME ADMINISTRATION AND SAFETY AGENCY
|
|
|
|
| |
Budget Amount |
5,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 129 |
| |
OCID |
ocds-gyl66f-229031006-000009
|
|
Project Title |
Provision Of Network Infrastruture in Enugu Regional office
|
|
| |
Procurring Entity |
NIGERIAN SAFETY INVESTIGATION BUREAU (NSIB)
|
|
|
|
| |
Budget Amount |
345,880,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
16,472,000.00
|
|
Contractor |
Nobtrove Nigeria Limited
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 130 |
| |
OCID |
ocds-gyl66f-229031009-000007
|
|
Project Title |
Printing of Cabotage administrative and policy documents
|
|
| |
Procurring Entity |
NIGERIAN MARITIME ADMINISTRATION AND SAFETY AGENCY
|
|
|
|
| |
Budget Amount |
10,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 131 |
| |
OCID |
ocds-gyl66f-228046001-000058
|
|
Project Title |
SUPPLY AND INSTALLATION OF ANALYTICAL BALANCE
|
|
| |
Procurring Entity |
FEDERAL INSTITUTE OF INDUSTRIAL RESEARCH -OSHODI
|
|
|
|
| |
Budget Amount |
30,240,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
30,240,000.00
|
|
Contractor |
I.N VENATIUS NIG. LTD
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 132 |
| |
OCID |
ocds-gyl66f-228046001-000059
|
|
Project Title |
SUPPLY AND INSTALLATION OF AMINO ACID ANALYZER AND ACCESSORIES
|
|
| |
Procurring Entity |
FEDERAL INSTITUTE OF INDUSTRIAL RESEARCH -OSHODI
|
|
|
|
| |
Budget Amount |
48,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
48,000,000.00
|
|
Contractor |
LYNZ ASSOCIATE
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 133 |
| |
OCID |
ocds-gyl66f-228046001-000060
|
|
Project Title |
SUPPLY AND INSTALLATION OF COMPLETE DISTILLATION, TITRATION AND DIGESTION EQUIPMENT
|
|
| |
Procurring Entity |
FEDERAL INSTITUTE OF INDUSTRIAL RESEARCH -OSHODI
|
|
|
|
| |
Budget Amount |
30,114,787.50
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
30,114,787.50
|
|
Contractor |
F-TECHLA VENTURES NIG. LTD.
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 134 |
| |
OCID |
ocds-gyl66f-228046001-000061
|
|
Project Title |
SUPPLY AND INSTALLATION OF STATEBOURNE INTEGRATED CRYOGENICS BULK REFRIGERATOR
|
|
| |
Procurring Entity |
FEDERAL INSTITUTE OF INDUSTRIAL RESEARCH -OSHODI
|
|
|
|
| |
Budget Amount |
35,259,446.25
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
35,259,446.25
|
|
Contractor |
F-TECHLA VENTURES NIG. LTD.
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 135 |
| |
OCID |
ocds-gyl66f-228046001-000074
|
|
Project Title |
REHABILITATION OF ORGANIC AND INORGANIC CHEMICAL STORE
|
|
| |
Procurring Entity |
FEDERAL INSTITUTE OF INDUSTRIAL RESEARCH -OSHODI
|
|
|
|
| |
Budget Amount |
4,657,479.75
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 136 |
| |
OCID |
ocds-gyl66f-228046001-000075
|
|
Project Title |
CONSTRUCTION OF ENTREPRENEURSHIP CENTRE WITH LIBRARY COMPLEX (PHASE II)
|
|
| |
Procurring Entity |
FEDERAL INSTITUTE OF INDUSTRIAL RESEARCH -OSHODI
|
|
|
|
| |
Budget Amount |
135,926,277.93
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 137 |
| |
OCID |
ocds-gyl66f-228046001-000076
|
|
Project Title |
CONSTRUCTION AND EQUIPPING OF ANIMAL HOUSE FOR R&D (PHASE II)
|
|
| |
Procurring Entity |
FEDERAL INSTITUTE OF INDUSTRIAL RESEARCH -OSHODI
|
|
|
|
| |
Budget Amount |
57,323,862.50
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 138 |
| |
OCID |
ocds-gyl66f-228046001-000077
|
|
Project Title |
RENOVATION, PARTITIONING AND FURNISHING OF OFFICE FOR TECHNICAL & NON TECHNICAL STAFF
|
|
| |
Procurring Entity |
FEDERAL INSTITUTE OF INDUSTRIAL RESEARCH -OSHODI
|
|
|
|
| |
Budget Amount |
27,743,850.75
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 139 |
| |
OCID |
ocds-gyl66f-517021017-000001
|
|
Project Title |
Construction of New School of Environmental Technology Building
|
|
| |
Procurring Entity |
FEDERAL UNIVERSITY OF TECHNOLOGY, AKURE
|
|
|
|
| |
Budget Amount |
450,000,000.00
NGN
|
|
Budget year |
2019
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
|
|
| |
|
| 140 |
| |
OCID |
ocds-gyl66f-228046001-000033
|
|
Project Title |
PROPOSED RENOVATION OF MUSHROOM PRODUCTION AND TRAINING ROOM
|
|
| |
Procurring Entity |
FEDERAL INSTITUTE OF INDUSTRIAL RESEARCH -OSHODI
|
|
|
|
| |
Budget Amount |
100,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
51,224,238.45
|
|
Contractor |
NIDAVE INDUSTRY VENTURES LIMITED
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
| 141 |
| |
OCID |
ocds-gyl66f-228046001-000035
|
|
Project Title |
PROPOSED REHABILITATION OF LABORATORIES FOR RESEARCH AND DEVELOPMENT
|
|
| |
Procurring Entity |
FEDERAL INSTITUTE OF INDUSTRIAL RESEARCH -OSHODI
|
|
|
|
| |
Budget Amount |
170,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 142 |
| |
OCID |
ocds-gyl66f-228046001-000036
|
|
Project Title |
INSTALLATION OF FRUIT JUICE PROCESSING PLANT
|
|
| |
Procurring Entity |
FEDERAL INSTITUTE OF INDUSTRIAL RESEARCH -OSHODI
|
|
|
|
| |
Budget Amount |
46,428,962.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 143 |
| |
OCID |
ocds-gyl66f-124004001-000078
|
|
Project Title |
PROCUREMENT OF 8 NOS. DECONTAMINATION STATION (SHOWER TENT) BY DQE INC.
|
|
| |
Procurring Entity |
NIGERIA SECURITY AND CIVIL DEFENCE CORPS
|
|
|
|
| |
Budget Amount |
254,209,194.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 144 |
| |
OCID |
ocds-gyl66f-124004001-000080
|
|
Project Title |
PROCUREMENT OF 3 UNITS OF PRINTING MACHINE
|
|
| |
Procurring Entity |
NIGERIA SECURITY AND CIVIL DEFENCE CORPS
|
|
|
|
| |
Budget Amount |
131,520,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 145 |
| |
OCID |
ocds-gyl66f-124004001-000087
|
|
Project Title |
PROCUREMENT OF 70 NOS. COWBELL MILK
|
|
| |
Procurring Entity |
NIGERIA SECURITY AND CIVIL DEFENCE CORPS
|
|
|
|
| |
Budget Amount |
104,564,600.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 146 |
| |
OCID |
ocds-gyl66f-517023001-000002
|
|
Project Title |
Purchase of Office Furniture and Fittings
|
|
| |
Procurring Entity |
FEDERAL UNIVERSITY OF PETROLEUM RESOURCES, EFFURUN
|
|
|
|
| |
Budget Amount |
17,216,449.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 147 |
| |
OCID |
ocds-gyl66f-521027025-000011
|
|
Project Title |
ACQUIRING OF PROSTHESIS FOR SPINE SURGERY
|
|
| |
Procurring Entity |
FEDERAL MEDICAL CENTRE, ASABA
|
|
|
|
| |
Budget Amount |
200,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 148 |
| |
OCID |
ocds-gyl66f-521027025-000013
|
|
Project Title |
LANDSCAPING DRAINAGE AND BEAUTIFICATION OF FMC ASABA
|
|
| |
Procurring Entity |
FEDERAL MEDICAL CENTRE, ASABA
|
|
|
|
| |
Budget Amount |
100,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 149 |
| |
OCID |
ocds-gyl66f-123031006-000001
|
|
Project Title |
PURCHASE OF OFFICE EQUIPMENT
|
|
| |
Procurring Entity |
NATIONAL TROUPE OF NIGERIA
|
|
|
|
| |
Budget Amount |
1,787,721.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 150 |
| |
OCID |
ocds-gyl66f-123031006-000003
|
|
Project Title |
PURCHASE OF OFFICE PROJECT VEHICLES
|
|
| |
Procurring Entity |
NATIONAL TROUPE OF NIGERIA
|
|
|
|
| |
Budget Amount |
11,620,187.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 151 |
| |
OCID |
ocds-gyl66f-521027025-000017
|
|
Project Title |
TRAINING AND CAPACITY BUILDING OF MEDICAL AND NON MEDICAL PERSONNEL
|
|
| |
Procurring Entity |
FEDERAL MEDICAL CENTRE, ASABA
|
|
|
|
| |
Budget Amount |
30,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 152 |
| |
OCID |
ocds-gyl66f-521027025-000031
|
|
Project Title |
FREE MEDICAL OUTREACH TO BOMADI/PATANI FEDERAL CONSTITUTENCY DELTA STATE.
|
|
| |
Procurring Entity |
FEDERAL MEDICAL CENTRE, ASABA
|
|
|
|
| |
Budget Amount |
35,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 153 |
| |
OCID |
ocds-gyl66f-220015001-000002
|
|
Project Title |
SUPPLY OF DIESEL FOR MARCH 2017
|
|
| |
Procurring Entity |
PENSION TRANSITIONAL ARRANGEMENT DEPARTMENT (PTAD) HQTRS
|
|
|
|
| |
Budget Amount |
2,300,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 154 |
| |
OCID |
ocds-gyl66f-220015001-000004
|
|
Project Title |
SUPPLY OF BEVERAGES FOR MARCH 2017
|
|
| |
Procurring Entity |
PENSION TRANSITIONAL ARRANGEMENT DEPARTMENT (PTAD) HQTRS
|
|
|
|
| |
Budget Amount |
2,037,105.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 155 |
| |
OCID |
ocds-gyl66f-521003001-04215
|
|
Project Title |
PROVISIONS OF ULTRA SOUND SCANNING MACHINES MASHI /DUTSI FED, CONST KATSINA STATE
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
4,185,685.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 156 |
| |
OCID |
ocds-gyl66f-521003001-04222
|
|
Project Title |
UPGRADING & EQUIPPING OF PHC IN KULANI CHANGI, BALANGA LGA GOMBE STATE
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
30,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 157 |
| |
OCID |
ocds-gyl66f-521003001-04224
|
|
Project Title |
EQUIPPING/FURNISHING OF YAKASAI ZUMUNTA CLINIC AND MATERNITY, YAKASAI QUARTERS, KANO MUNICIPAL, KANO
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
15,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 158 |
| |
OCID |
ocds-gyl66f-521003001-04229
|
|
Project Title |
PROVISION OF MEDICAL EQUIPMENT TO EBUTE UJIOGBA PRIMARY HEALTH CARE CENTRE, ESIN WEST, EDO STATE
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
15,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 159 |
| |
OCID |
ocds-gyl66f-521003001-04231
|
|
Project Title |
EQUIPING OF EXISTING HEALTH CARECENTRE AT OBODDOUKWU, UMUOBOM, AKOKWA AND ARONDIZOGU IN IDEATO NORTH
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
25,114,112.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 160 |
| |
OCID |
ocds-gyl66f-521003001-04272
|
|
Project Title |
REHABILITATION AND EQUIPING OF IHIE HEALTH CENTER, ISIALA NGWA NORTH LGA, ABIA STATE
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
10,464,213.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 161 |
| |
OCID |
ocds-gyl66f-521003001-04274
|
|
Project Title |
REVITALIZATION OF PHC CENTER AT ENUGWU-UKWU NJIKOKA LGA ANAMBRA STATE
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
12,557,056.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 162 |
| |
OCID |
ocds-gyl66f-521003001-04279
|
|
Project Title |
RENOVATIONOF PHC CENTER HOSPITAL IN ANOCHA/OSHIMILI FED. CONSTITUENCY DELTA STATE
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
8,371,371.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 163 |
| |
OCID |
ocds-gyl66f-521003001-04281
|
|
Project Title |
REVITALIZATION AND EQUIPPING OF PRIMARY HEALTH CARE CENTRES IN IDO OSI LGA, EKITI STATE
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
8,371,371.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 164 |
| |
OCID |
ocds-gyl66f-124004001-000092
|
|
Project Title |
PROCUREMENT OF 400 KEGS PALM OIL
|
|
| |
Procurring Entity |
NIGERIA SECURITY AND CIVIL DEFENCE CORPS
|
|
|
|
| |
Budget Amount |
104,564,600.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 165 |
| |
OCID |
ocds-gyl66f-124004001-000094
|
|
Project Title |
PROCUREMENT OF 800 NOS. BAGS OF RICE
|
|
| |
Procurring Entity |
NIGERIA SECURITY AND CIVIL DEFENCE CORPS
|
|
|
|
| |
Budget Amount |
104,564,600.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 166 |
| |
OCID |
ocds-gyl66f-124004001-000098
|
|
Project Title |
PROCUREMENT OF 190 UNITS OF PEN RECORDER RECORDER
|
|
| |
Procurring Entity |
NIGERIA SECURITY AND CIVIL DEFENCE CORPS
|
|
|
|
| |
Budget Amount |
445,164,570.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 167 |
| |
OCID |
ocds-gyl66f-124004001-000100
|
|
Project Title |
PROCUREMENT OF 20 NOS. BINOCULARS
|
|
| |
Procurring Entity |
NIGERIA SECURITY AND CIVIL DEFENCE CORPS
|
|
|
|
| |
Budget Amount |
254,209,194.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 168 |
| |
OCID |
ocds-gyl66f-124004001-000107
|
|
Project Title |
PROCUREMENT OF 100 UNITS OF VIDEO CAMERA
|
|
| |
Procurring Entity |
NIGERIA SECURITY AND CIVIL DEFENCE CORPS
|
|
|
|
| |
Budget Amount |
445,164,570.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 169 |
| |
OCID |
ocds-gyl66f-124004001-000109
|
|
Project Title |
PROCUREMENT OF 210 UNITS OF BOMB DETECTOR SCANNER
|
|
| |
Procurring Entity |
NIGERIA SECURITY AND CIVIL DEFENCE CORPS
|
|
|
|
| |
Budget Amount |
445,164,570.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 170 |
| |
OCID |
ocds-gyl66f-124004001-000112
|
|
Project Title |
PROCUREMENT OF 5 NOS. NETWORK SERVER
|
|
| |
Procurring Entity |
NIGERIA SECURITY AND CIVIL DEFENCE CORPS
|
|
|
|
| |
Budget Amount |
305,821,700.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 171 |
| |
OCID |
ocds-gyl66f-124004001-000114
|
|
Project Title |
PROCUREMENT OF 2000 NOS. PLATES/DRINKING BOWLS
|
|
| |
Procurring Entity |
NIGERIA SECURITY AND CIVIL DEFENCE CORPS
|
|
|
|
| |
Budget Amount |
104,564,600.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 172 |
| |
OCID |
ocds-gyl66f-124004001-000119
|
|
Project Title |
PROCUREMENT OF 258 NOS. HYPO
|
|
| |
Procurring Entity |
NIGERIA SECURITY AND CIVIL DEFENCE CORPS
|
|
|
|
| |
Budget Amount |
104,564,600.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 173 |
| |
OCID |
ocds-gyl66f-124004001-000126
|
|
Project Title |
PROCUREMENT OF 700 NOS. DOG SHAMPOO WITH ACARICIDE
|
|
| |
Procurring Entity |
NIGERIA SECURITY AND CIVIL DEFENCE CORPS
|
|
|
|
| |
Budget Amount |
104,564,600.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 174 |
| |
OCID |
ocds-gyl66f-124004001-000128
|
|
Project Title |
PROCUREMENT OF 4 NOS. STETHOSCOPE
|
|
| |
Procurring Entity |
NIGERIA SECURITY AND CIVIL DEFENCE CORPS
|
|
|
|
| |
Budget Amount |
150,118,500.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 175 |
| |
OCID |
ocds-gyl66f-124004001-000133
|
|
Project Title |
PROCUREMENT OF 200 UNITS CENTRIFUGE
|
|
| |
Procurring Entity |
NIGERIA SECURITY AND CIVIL DEFENCE CORPS
|
|
|
|
| |
Budget Amount |
254,209,194.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 176 |
| |
OCID |
ocds-gyl66f-124004001-000134
|
|
Project Title |
PROCUREMENT OF 2 NOS. STADIOMETER
|
|
| |
Procurring Entity |
NIGERIA SECURITY AND CIVIL DEFENCE CORPS
|
|
|
|
| |
Budget Amount |
150,118,500.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 177 |
| |
OCID |
ocds-gyl66f-521003001-00070
|
|
Project Title |
CONSTRUCTION OF PRIMARY HEALTH CARE CENTRE AT APU IN PATEGI LGA OF KWARA STATE
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
41,856,853.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 178 |
| |
OCID |
ocds-gyl66f-521003001-00077
|
|
Project Title |
EQUIPPING/FURNISHING OF OMUMAUZOR PRIMARY HEALTH CARE CENTRE, ASA NORTH, UKWA WEST L.G.A, ABIA STATE
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
20,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 179 |
| |
OCID |
ocds-gyl66f-521001001-00079
|
|
Project Title |
Procurement of Ready to use therapeutic food to be distributed to 6 geopolitical zones
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF HEALTH - HQTRS
|
|
|
|
| |
Budget Amount |
400,186,200.00
NGN
|
|
Budget year |
2019
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 180 |
| |
OCID |
ocds-gyl66f-521001001-00084
|
|
Project Title |
procurement of Law Books
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF HEALTH - HQTRS
|
|
|
|
| |
Budget Amount |
6,756,501.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 181 |
| |
OCID |
ocds-gyl66f-521001001-00086
|
|
Project Title |
Computerisation of Budget and Account Department
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF HEALTH - HQTRS
|
|
|
|
| |
Budget Amount |
40,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 182 |
| |
OCID |
ocds-gyl66f-521001001-00093
|
|
Project Title |
Procurement of Entomoltology materials and easy stick insecticide treated windows and door nets
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF HEALTH - HQTRS
|
|
|
|
| |
Budget Amount |
15,046,675.00
NGN
|
|
Budget year |
2007
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 183 |
| |
OCID |
ocds-gyl66f-521001001-00095
|
|
Project Title |
Echiteb: Procurement and distribution of Anti-Snake Venom
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF HEALTH - HQTRS
|
|
|
|
| |
Budget Amount |
51,690,347.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 184 |
| |
OCID |
ocds-gyl66f-521001001-00102
|
|
Project Title |
Procurement of Narcotic and Production of essential Medicines for use by all Public/Private Health i
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF HEALTH - HQTRS
|
|
|
|
| |
Budget Amount |
50,116,829.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 185 |
| |
OCID |
ocds-gyl66f-521003001-00104
|
|
Project Title |
Procurement and distribution of Iron Folates
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
59,963,400.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 186 |
| |
OCID |
ocds-gyl66f-521001001-01106
|
|
Project Title |
Replacement of old Circuit breakers and miniature breakers
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF HEALTH - HQTRS
|
|
|
|
| |
Budget Amount |
10,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 187 |
| |
OCID |
ocds-gyl66f-521003001-01113
|
|
Project Title |
EQUIPING/FURNISHING OF PRIMARY HEALTH CARE CENTRE IN LAMORDE LGA KPASHIMINA WARD, ADAMAWA STATE
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
20,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 188 |
| |
OCID |
ocds-gyl66f-521003001-01115
|
|
Project Title |
CONSTRUCTION AND EQUIPING OF PRIMARY HEALTH CENTRE AT MBAGU-VANDEIKYA LGA, BENUE STATE.
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
20,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 189 |
| |
OCID |
ocds-gyl66f-521003001-01120
|
|
Project Title |
PURCHASE OF MEDICAL EQUIPMENTS TO PHC CENTRES IN KUDAN LGA KADUNA STATE
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
50,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 190 |
| |
OCID |
ocds-gyl66f-521003001-01122
|
|
Project Title |
EQUIPPING OF OBODOUKWU HEALTH CENTER IDEATO SOUTH LGA IMO STATE
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
8,371,371.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 191 |
| |
OCID |
ocds-gyl66f-521003001-01129
|
|
Project Title |
SUPPLY OF HOSPITAL EQUIPMENT FOR MALUMFASHI/ KAFUR FEDERAL CONSTITUENCY, KATSINA STATE.
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
12,557,056.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 192 |
| |
OCID |
ocds-gyl66f-521003001-01131
|
|
Project Title |
SUPPLY OF MEDICAL EQUIPMENT TO PHC CENTRE IN IGABI FED. CONST, KADUNA STATE.
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
12,557,056.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 193 |
| |
OCID |
ocds-gyl66f-521003001-01138
|
|
Project Title |
PROCUREMENT OF HOSPITAL EQUIPMENT / CONSUMABLES AND AMBULANCE FOR OUR SAVIOURS HOSPITAL, AMANYI, IHI
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
20,928,427.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 194 |
| |
OCID |
ocds-gyl66f-521003001-01140
|
|
Project Title |
SUPPLY OF DRUGS IN OVIA NORTH EAST FEDERAL CONSTITUENCY, EDO STATE
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
8,371,370.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 195 |
| |
OCID |
ocds-gyl66f-521003001-01145
|
|
Project Title |
PROCUREMENT OF DRUGS TO IHITTE UBUMA COMPREHENSIVE HOSPITAL, IMO STATE
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
25,114,112.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 196 |
| |
OCID |
ocds-gyl66f-521003001-02149
|
|
Project Title |
PROVISION OF MEDICAL EQUIPMENT AT NUMAN LGA
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
8,371,371.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 197 |
| |
OCID |
ocds-gyl66f-521003001-02151
|
|
Project Title |
SUPPLY OF HOSPITAL EQUIPMENT AT ZAMFAA NORTH SENATORIAL DISTRICT
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
6,278,528.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 198 |
| |
OCID |
ocds-gyl66f-521003001-03185
|
|
Project Title |
EQUIPPING OF PHC IN PAPA ABEDE OGBOMOSO NORTH/SOUTH/ORIRE FEDERAL CONSTITUENCY, OYO STATE
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
8,371,371.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 199 |
| |
OCID |
ocds-gyl66f-521003001-03187
|
|
Project Title |
SUPPLY OF MEDICAL EQUIPMENT TO HOSPITALS IN KURFI, BATAGARAWA AND RIMI LGAS OF KATSINA CENTRAL SENAT
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
50,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 200 |
| |
OCID |
ocds-gyl66f-521003001-03194
|
|
Project Title |
PROVISION FOR THE RE-INVIGORATION OF PRIMARY HEALTH CARE CENTRE, NUNG OBONG, NSIT UBIUM LOCAL GOVERN
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
10,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 201 |
| |
OCID |
ocds-gyl66f-521003001-03196
|
|
Project Title |
FURNISHING OF AWULEMA HOSPITAL IN OTUKPO / OHIMINI FEDERAL CONSTITUENCY, BENUE STATE.
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
10,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 202 |
| |
OCID |
ocds-gyl66f-521003001-03201
|
|
Project Title |
SUPPLY OF MEDICAL EQUIPMENTS AT DALWA SHELLANG, SHELLANG IN ADAMAWA & DUKKU IN GOMBE STATE
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
10,464,213.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 203 |
| |
OCID |
ocds-gyl66f-521003001-03203
|
|
Project Title |
MEDICAL EQUIPMENTS DUTSE, KIYAWA, KAZAURE IN JIGAWA, TARAUNI, NASARAWA & GAYA IN KANO STATE
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
20,928,427.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 204 |
| |
OCID |
ocds-gyl66f-124004001-000058
|
|
Project Title |
PROCUREMENT OF 49 NOS. OXYTETRACYCLIN L.A (VET)
|
|
| |
Procurring Entity |
NIGERIA SECURITY AND CIVIL DEFENCE CORPS
|
|
|
|
| |
Budget Amount |
104,564,600.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 205 |
| |
OCID |
ocds-gyl66f-124004001-000061
|
|
Project Title |
PROCUREMENT OF 36 NOS. TYLOSIN TARTATE INJ
|
|
| |
Procurring Entity |
NIGERIA SECURITY AND CIVIL DEFENCE CORPS
|
|
|
|
| |
Budget Amount |
104,564,600.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 206 |
| |
OCID |
ocds-gyl66f-124004001-000063
|
|
Project Title |
PROCUREMENT OF 70 NOS. COD LIVER OIL
|
|
| |
Procurring Entity |
NIGERIA SECURITY AND CIVIL DEFENCE CORPS
|
|
|
|
| |
Budget Amount |
104,564,600.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 207 |
| |
OCID |
ocds-gyl66f-124004001-000067
|
|
Project Title |
PROCUREMENT OF 250 NOS. GENTAMOX 100MLS
|
|
| |
Procurring Entity |
NIGERIA SECURITY AND CIVIL DEFENCE CORPS
|
|
|
|
| |
Budget Amount |
104,564,600.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 208 |
| |
OCID |
ocds-gyl66f-124004001-000069
|
|
Project Title |
PROCUREMENT OF 25 NOS. SULFADIMIDINE (ORAL VET USE)
|
|
| |
Procurring Entity |
NIGERIA SECURITY AND CIVIL DEFENCE CORPS
|
|
|
|
| |
Budget Amount |
104,564,600.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 209 |
| |
OCID |
ocds-gyl66f-228046001-000032
|
|
Project Title |
PROPOSED REHABILITATION OF TEXTILE AND POLYMER LABORATORY
|
|
| |
Procurring Entity |
FEDERAL INSTITUTE OF INDUSTRIAL RESEARCH -OSHODI
|
|
|
|
| |
Budget Amount |
30,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 210 |
| |
OCID |
ocds-gyl66f-124004001-000079
|
|
Project Title |
PROCUREMENT OF 515 UNITS OF HDP RIBBON FOR HID FARGO (HDP 8500)
|
|
| |
Procurring Entity |
NIGERIA SECURITY AND CIVIL DEFENCE CORPS
|
|
|
|
| |
Budget Amount |
131,520,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 211 |
| |
OCID |
ocds-gyl66f-521049001-00065
|
|
Project Title |
Medical Gas Plant
|
|
| |
Procurring Entity |
NATIONAL HOSPITAL ABUJA
|
|
|
|
| |
Budget Amount |
10,606,467.00
NGN
|
|
Budget year |
2016
|
|
| |
Project Amount |
129,453,710.30
|
|
Contractor |
Air Separation limited
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
| 212 |
| |
OCID |
ocds-gyl66f-111011001-00066
|
|
Project Title |
Office Stationaries/Computer Consumables
|
|
| |
Procurring Entity |
NIGERIA EXTRACTIVE INDUSTRIES TRANSPARENCY INITIATIVE (NEITI)
|
|
|
|
| |
Budget Amount |
2,640,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 213 |
| |
OCID |
ocds-gyl66f-521003001-00080
|
|
Project Title |
REHABILITATION OF PHC CENTRE AT EZENA OMI, IKEDURU LGA, IMO STATE
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
8,371,371.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 214 |
| |
OCID |
ocds-gyl66f-111011001-00081
|
|
Project Title |
Consultancy for the selection of an auditor on oil Gas Industry Audit 2018
|
|
| |
Procurring Entity |
NIGERIA EXTRACTIVE INDUSTRIES TRANSPARENCY INITIATIVE (NEITI)
|
|
|
|
| |
Budget Amount |
91,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 215 |
| |
OCID |
ocds-gyl66f-111011001-00082
|
|
Project Title |
Research Studies
|
|
| |
Procurring Entity |
NIGERIA EXTRACTIVE INDUSTRIES TRANSPARENCY INITIATIVE (NEITI)
|
|
|
|
| |
Budget Amount |
26,750,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 216 |
| |
OCID |
ocds-gyl66f-111011001-00083
|
|
Project Title |
Purchase of Computer Communication Equipment, Printers
|
|
| |
Procurring Entity |
NIGERIA EXTRACTIVE INDUSTRIES TRANSPARENCY INITIATIVE (NEITI)
|
|
|
|
| |
Budget Amount |
36,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 217 |
| |
OCID |
ocds-gyl66f-521001001-00097
|
|
Project Title |
Procurement of HIV Rapid test kits Viral Load Machines and reagent
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF HEALTH - HQTRS
|
|
|
|
| |
Budget Amount |
40,790,400.00
NGN
|
|
Budget year |
2019
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 218 |
| |
OCID |
ocds-gyl66f-521001001-00098
|
|
Project Title |
Purchase of Defibrillators to be Distributed to Health Institutions
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF HEALTH - HQTRS
|
|
|
|
| |
Budget Amount |
270,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 219 |
| |
OCID |
ocds-gyl66f-521001001-00099
|
|
Project Title |
printing of National Policy on Occupational Health and Safety
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF HEALTH - HQTRS
|
|
|
|
| |
Budget Amount |
5,601,633.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 220 |
| |
OCID |
ocds-gyl66f-521001001-00100
|
|
Project Title |
Printing and distribution of TB Laboratory Policy Manual
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF HEALTH - HQTRS
|
|
|
|
| |
Budget Amount |
5,601,633.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 221 |
| |
OCID |
ocds-gyl66f-521003001-01116
|
|
Project Title |
SUPPLY OF MEDICAL/ HOSPITAL EQUIPMENT TO HEATH CENTRES IN IHHITE UBOMA LGA, IMO STATE
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
29,299,797.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 222 |
| |
OCID |
ocds-gyl66f-521003001-01117
|
|
Project Title |
SUPPLY OF BASIC DRUGS AT UMUOBIALA HEALTH CENTRE NKWONTA ISIUKWUATO LGA, ABIA STATE
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
8,371,370.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 223 |
| |
OCID |
ocds-gyl66f-521003001-01118
|
|
Project Title |
SUPPLY OF MEDICAL/ HOSPITAL EQUIPMENT TO HEATH CENTRES IN OBOWO LGA, IMO STATE
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
29,299,797.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 224 |
| |
OCID |
ocds-gyl66f-521003001-01119
|
|
Project Title |
PURCHASE OF MEDICAL EQUIPMENTS TO PHC CENTRES IN MAKARFI LGA KADUNA STATE
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
50,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 225 |
| |
OCID |
ocds-gyl66f-521003001-01133
|
|
Project Title |
SUPPLY OF MEDICAL EQUIPMENT TO PHC CENTRE IN ETHIOPE EAST OF ETHIOPE FEDERAL CONSTITUENCY, DELTA STA
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
12,557,056.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 226 |
| |
OCID |
ocds-gyl66f-521003001-01134
|
|
Project Title |
PROCUREMENT OF HOSPITAL DRUGS FOR UTURU GENERAL HOSPITAL
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
20,928,426.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 227 |
| |
OCID |
ocds-gyl66f-521003001-01135
|
|
Project Title |
SUPPLY OF DRUGS TO FOR ABADAM, KUKAWA, GUZAMALA OF MOBBAR LGA BORNO STATE
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
12,557,056.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 228 |
| |
OCID |
ocds-gyl66f-521003001-01136
|
|
Project Title |
PROCUREMENT OF HOSPITAL EQUIPMENTS /CONSUMABLES AND AMBULANCE FOR MERCY HOSPITAL, UMULOGHO, OBUWO LG
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
20,928,427.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 229 |
| |
OCID |
ocds-gyl66f-521003001-03188
|
|
Project Title |
SUPPLY OF MEDICAL EQUIPMENT TO HOSPITALS IN BATSARI AND KAITA LGAS OF KATSINA CENTRAL SENATORIAL DIS
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
50,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 230 |
| |
OCID |
ocds-gyl66f-521003001-03189
|
|
Project Title |
SUPPLY OF MEDICAL EQUIPMENT TO HOSPITALS IN KATSINA AND SAFANA LGAS OF KATSINA CENTRAL SENATORIAL DI
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
50,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 231 |
| |
OCID |
ocds-gyl66f-521003001-03190
|
|
Project Title |
SUPPLY OF MEDICAL EQUIPMENT TO HOSPITALS IN DANMUSA AND CHARANCHI LGAS OF KATSINA CENTRAL SENATORIAL
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
50,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 232 |
| |
OCID |
ocds-gyl66f-521003001-03191
|
|
Project Title |
SUPPLY OF MEDICAL EQUIPMENT TO 11(ELEVEN) HOSPITALS IN THE 11(ELEVEN) LGAS OF KATSINA CENTRAL SENA
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
50,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 233 |
| |
OCID |
ocds-gyl66f-521003001-03192
|
|
Project Title |
SUPPLY OF HOSPITAL EQUIPMENT IN NDOKWA/UKWANI FED. CONS DELTA STATE
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
40,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 234 |
| |
OCID |
ocds-gyl66f-521003001-03205
|
|
Project Title |
MEDICAL EQUIPMENTS AT OSHODI ISOLO IN LAGOS, IFO2 IN OGUN, AKOKO NW & ODIGBO IN ONDO, IGANGAN,OGBOMO
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
33,485,483.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 235 |
| |
OCID |
ocds-gyl66f-124004001-000056
|
|
Project Title |
PROCUREMENT OF 60 NOS. OXYTETRACYCLIN (VET)
|
|
| |
Procurring Entity |
NIGERIA SECURITY AND CIVIL DEFENCE CORPS
|
|
|
|
| |
Budget Amount |
104,564,600.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 236 |
| |
OCID |
ocds-gyl66f-124004001-000064
|
|
Project Title |
PROCUREMENT OF 650 NOS. PURIT ANTISEPTICS
|
|
| |
Procurring Entity |
NIGERIA SECURITY AND CIVIL DEFENCE CORPS
|
|
|
|
| |
Budget Amount |
104,564,600.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 237 |
| |
OCID |
ocds-gyl66f-124004001-000065
|
|
Project Title |
PROCUREMENT OF 1200 UNITS OF RAIN BOOT
|
|
| |
Procurring Entity |
NIGERIA SECURITY AND CIVIL DEFENCE CORPS
|
|
|
|
| |
Budget Amount |
445,164,570.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 238 |
| |
OCID |
ocds-gyl66f-124004001-000066
|
|
Project Title |
PROCUREMENT OF 60 NOS. SALPHEN INJ
|
|
| |
Procurring Entity |
NIGERIA SECURITY AND CIVIL DEFENCE CORPS
|
|
|
|
| |
Budget Amount |
104,564,600.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 239 |
| |
OCID |
ocds-gyl66f-124004001-000074
|
|
Project Title |
PROCUREMENT OF 3,600 NOS. SURGICAL GLOVES
|
|
| |
Procurring Entity |
NIGERIA SECURITY AND CIVIL DEFENCE CORPS
|
|
|
|
| |
Budget Amount |
104,564,600.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 240 |
| |
OCID |
ocds-gyl66f-228046001-000031
|
|
Project Title |
PROPOSED DEVELOPMENT OF ENZYME CENTRE FOR PRODUCTION OF LOCAL RAW MATERIALS
|
|
| |
Procurring Entity |
FEDERAL INSTITUTE OF INDUSTRIAL RESEARCH -OSHODI
|
|
|
|
| |
Budget Amount |
55,145,911.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
75,405,436.26
|
|
Contractor |
BEVIS CONSTRUCTION NIG. LTD
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 241 |
| |
OCID |
ocds-gyl66f-228046001-000034
|
|
Project Title |
PROPOSED CONSTRUCTION OF OFFICE BUILDING FOR ENHANCED RESEARCH AND DEVELOPMENT
|
|
| |
Procurring Entity |
FEDERAL INSTITUTE OF INDUSTRIAL RESEARCH -OSHODI
|
|
|
|
| |
Budget Amount |
170,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
44,078,975.38
|
|
Contractor |
Genesis Impression Global Investment Nig. Ltd
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 242 |
| |
OCID |
ocds-gyl66f-124004001-000082
|
|
Project Title |
PROCUREMENT OF 5 UNITS OF MOUNTED RFID READERS WITH COMPUTER AIDED TERMINALS
|
|
| |
Procurring Entity |
NIGERIA SECURITY AND CIVIL DEFENCE CORPS
|
|
|
|
| |
Budget Amount |
15,456,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 243 |
| |
OCID |
ocds-gyl66f-124004001-000083
|
|
Project Title |
PROCUREMENT OF 1500 UNITS OF METAL DETECTOR SCANNER
|
|
| |
Procurring Entity |
NIGERIA SECURITY AND CIVIL DEFENCE CORPS
|
|
|
|
| |
Budget Amount |
445,164,570.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 244 |
| |
OCID |
ocds-gyl66f-124004001-000084
|
|
Project Title |
PROCUREMENT OF 1000 UNITS OF JUNGLE BOOT
|
|
| |
Procurring Entity |
NIGERIA SECURITY AND CIVIL DEFENCE CORPS
|
|
|
|
| |
Budget Amount |
445,164,570.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 245 |
| |
OCID |
ocds-gyl66f-521003001-04288
|
|
Project Title |
REVITALISATION /EQUIPING OF 6 NOS PHC CENTRES IN ISIALA MBANO LGA, IMO STATE
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
14,649,899.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 246 |
| |
OCID |
ocds-gyl66f-521003001-04290
|
|
Project Title |
REVITILISATION AND EQUIPING OF 6 NOS PHCS IN OWERI NORTH LGA,IMO STATE
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
14,649,899.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 247 |
| |
OCID |
ocds-gyl66f-521003001-04297
|
|
Project Title |
REVITILISATION OF 6 NOS PHCS IN ISU LGA, IMO STATE
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
14,649,899.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 248 |
| |
OCID |
ocds-gyl66f-521003001-04299
|
|
Project Title |
REVITALIZATION AND EQUIPING OF 6NO PHC IN OBOWO LGA, IMO STATE
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
14,649,899.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 249 |
| |
OCID |
ocds-gyl66f-521003001-04304
|
|
Project Title |
RENOVATION OF WUDIL HOSPITAL KANO STATE
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
42,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 250 |
| |
OCID |
ocds-gyl66f-521003001-04306
|
|
Project Title |
REHABILITATION OF 6 HEALTH CENTRES AT GARKO, T/WADA, BEBEJI, WUDIL, BUNKURE AND ALBASU IN KANO SOUTH
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
105,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 251 |
| |
OCID |
ocds-gyl66f-521003001-04313
|
|
Project Title |
EXPANSION OF WARD / THEATRE IN OLA, COMMUNITY, AKWANGA, NASARAWA STATE.
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
10,464,213.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 252 |
| |
OCID |
ocds-gyl66f-521003001-04315
|
|
Project Title |
REHABILITATION AND EQUIPINGB OF 4 PHC IN IBADAN SOUTHEAST/NORTH EAST FEDERAL CONSTITUENCY, OYO STATE
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
12,557,056.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 253 |
| |
OCID |
ocds-gyl66f-229031009-000003
|
|
Project Title |
Production of I.D cards, Access Control cards
|
|
| |
Procurring Entity |
NIGERIAN MARITIME ADMINISTRATION AND SAFETY AGENCY
|
|
|
|
| |
Budget Amount |
35,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 254 |
| |
OCID |
ocds-gyl66f-229031009-000004
|
|
Project Title |
Accounting Manual
|
|
| |
Procurring Entity |
NIGERIAN MARITIME ADMINISTRATION AND SAFETY AGENCY
|
|
|
|
| |
Budget Amount |
45,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 255 |
| |
OCID |
ocds-gyl66f-229031009-000006
|
|
Project Title |
Printing of MSSSD Statutory documents
|
|
| |
Procurring Entity |
NIGERIAN MARITIME ADMINISTRATION AND SAFETY AGENCY
|
|
|
|
| |
Budget Amount |
130,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 256 |
| |
OCID |
ocds-gyl66f-156006002-000001
|
|
Project Title |
procurement of 4 units photocopying machines
|
|
| |
Procurring Entity |
GALAXY BACKBONE PLC
|
|
|
|
| |
Budget Amount |
10,000,000.00
NGN
|
|
Budget year |
2019
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 257 |
| |
OCID |
ocds-gyl66f-229031009-000009
|
|
Project Title |
Printing of security document and MEM statutory documents
|
|
| |
Procurring Entity |
NIGERIAN MARITIME ADMINISTRATION AND SAFETY AGENCY
|
|
|
|
| |
Budget Amount |
20,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 258 |
| |
OCID |
ocds-gyl66f-229031009-000011
|
|
Project Title |
Printing of security documents for shipping development
|
|
| |
Procurring Entity |
NIGERIAN MARITIME ADMINISTRATION AND SAFETY AGENCY
|
|
|
|
| |
Budget Amount |
15,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 259 |
| |
OCID |
ocds-gyl66f-228046001-000063
|
|
Project Title |
FABRICATIONS, SUPPLY AND INSTALLATION OF GARI FRYING AND PACKAGING MACHINE
|
|
| |
Procurring Entity |
FEDERAL INSTITUTE OF INDUSTRIAL RESEARCH -OSHODI
|
|
|
|
| |
Budget Amount |
42,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
40,070,000.01
|
|
Contractor |
FATAROY STEEL INDUSTRY LIMITED
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 260 |
| |
OCID |
ocds-gyl66f-228046001-000065
|
|
Project Title |
RENOVATION OF RESIDENCE QUARTER [PHASE 1]
|
|
| |
Procurring Entity |
FEDERAL INSTITUTE OF INDUSTRIAL RESEARCH -OSHODI
|
|
|
|
| |
Budget Amount |
36,411,640.65
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 261 |
| |
OCID |
ocds-gyl66f-228046001-000072
|
|
Project Title |
PARTITIONING OF 7 NO. OFFICES FOR PLANNING AND MONITORING DIVISION
|
|
| |
Procurring Entity |
FEDERAL INSTITUTE OF INDUSTRIAL RESEARCH -OSHODI
|
|
|
|
| |
Budget Amount |
460,221,300.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 262 |
| |
OCID |
ocds-gyl66f-228046001-000073
|
|
Project Title |
REHABILITATION OF LAB 12 (PREPARATORY ROOM) AT OLAJIDE KOLEOSO LABORATORY
|
|
| |
Procurring Entity |
FEDERAL INSTITUTE OF INDUSTRIAL RESEARCH -OSHODI
|
|
|
|
| |
Budget Amount |
4,083,306.15
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 263 |
| |
OCID |
ocds-gyl66f-228046001-000078
|
|
Project Title |
COMPLETION OF INTEGRATED CASSAVA CATALYTIC MODEL FACTORY AT IFEDORE ONDO STATE
|
|
| |
Procurring Entity |
FEDERAL INSTITUTE OF INDUSTRIAL RESEARCH -OSHODI
|
|
|
|
| |
Budget Amount |
80,318,867.07
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 264 |
| |
OCID |
ocds-gyl66f-124004001-000002
|
|
Project Title |
CONSTRUCTION OF 8 OUT OF 30 STATE COMMAND HEADQUARTERS
|
|
| |
Procurring Entity |
NIGERIA SECURITY AND CIVIL DEFENCE CORPS
|
|
|
|
| |
Budget Amount |
1,876,367,700.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 265 |
| |
OCID |
ocds-gyl66f-124004001-000004
|
|
Project Title |
CONSTRUCTION OF AUTOMATED MECHANICAL WORKSHOP
|
|
| |
Procurring Entity |
NIGERIA SECURITY AND CIVIL DEFENCE CORPS
|
|
|
|
| |
Budget Amount |
225,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 266 |
| |
OCID |
ocds-gyl66f-124004001-000011
|
|
Project Title |
AWARD OF CONTRACT FOR THE SUPPLY 60 NOS. OF COMPLETE SET OF MALBAK FIRE SUITS, WITH HELMET, GLOVES,
|
|
| |
Procurring Entity |
NIGERIA SECURITY AND CIVIL DEFENCE CORPS
|
|
|
|
| |
Budget Amount |
30,720,000.00
NGN
|
|
Budget year |
2019
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 267 |
| |
OCID |
ocds-gyl66f-124004001-000013
|
|
Project Title |
UPGRADING OF NSCDC CLINIC AT SAUKA TRAINING SCHOOLS AND ZONAL COMMANDS
|
|
| |
Procurring Entity |
NIGERIA SECURITY AND CIVIL DEFENCE CORPS
|
|
|
|
| |
Budget Amount |
150,118,500.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 268 |
| |
OCID |
ocds-gyl66f-124004001-000020
|
|
Project Title |
COMPLETION AND UPGRADING OF INDOOR SHOOTING RANGE WITH IN-BUILT ARMOURY AT SAUKA, ABUJA
|
|
| |
Procurring Entity |
NIGERIA SECURITY AND CIVIL DEFENCE CORPS
|
|
|
|
| |
Budget Amount |
15,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 269 |
| |
OCID |
ocds-gyl66f-228046001-000001
|
|
Project Title |
CONSTRUCTION OF RESEARCH QUARTERS
|
|
| |
Procurring Entity |
FEDERAL INSTITUTE OF INDUSTRIAL RESEARCH -OSHODI
|
|
|
|
| |
Budget Amount |
50,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
444,614,790.98
|
|
Contractor |
SLOBAJ ENGINEERING CONSTRUCTION CO. LTD
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
| 270 |
| |
OCID |
ocds-gyl66f-228046001-000006
|
|
Project Title |
SERVICING OF RMU AND TRANSFORMER
|
|
| |
Procurring Entity |
FEDERAL INSTITUTE OF INDUSTRIAL RESEARCH -OSHODI
|
|
|
|
| |
Budget Amount |
100,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
41,265,500.00
|
|
Contractor |
WIDE BEAM INTERNATIONAL LTD
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 271 |
| |
OCID |
ocds-gyl66f-228046001-000013
|
|
Project Title |
Digitization and Development of Electronic Management
|
|
| |
Procurring Entity |
FEDERAL INSTITUTE OF INDUSTRIAL RESEARCH -OSHODI
|
|
|
|
| |
Budget Amount |
70,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
43,708,512.75
|
|
Contractor |
ARCHIVE GLOBAL MANAGEMENT LIMITED
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 272 |
| |
OCID |
ocds-gyl66f-228046001-000015
|
|
Project Title |
ACQUISITION OF PACKAGING MACHINE FOR TRAINING OF SMEs IN PRODUCT DESIGN AND PACKAGING
|
|
| |
Procurring Entity |
FEDERAL INSTITUTE OF INDUSTRIAL RESEARCH -OSHODI
|
|
|
|
| |
Budget Amount |
36,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
33,696,610.58
|
|
Contractor |
Monolith Global Resources Ltd
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 273 |
| |
OCID |
ocds-gyl66f-124004001-000141
|
|
Project Title |
PROCUREMENT OF 6 NOS.THERMOMETER
|
|
| |
Procurring Entity |
NIGERIA SECURITY AND CIVIL DEFENCE CORPS
|
|
|
|
| |
Budget Amount |
150,118,500.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 274 |
| |
OCID |
ocds-gyl66f-124004001-000143
|
|
Project Title |
PROCUREMENT OF 70 NOS. GLUCOSE D 400G
|
|
| |
Procurring Entity |
NIGERIA SECURITY AND CIVIL DEFENCE CORPS
|
|
|
|
| |
Budget Amount |
104,564,600.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 275 |
| |
OCID |
ocds-gyl66f-124004001-000150
|
|
Project Title |
PROCUREMENT OF 600 NOS.MUZZLE
|
|
| |
Procurring Entity |
NIGERIA SECURITY AND CIVIL DEFENCE CORPS
|
|
|
|
| |
Budget Amount |
104,564,600.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 276 |
| |
OCID |
ocds-gyl66f-124004001-000152
|
|
Project Title |
PROCUREMENT OF 520 NOS. VITA PET
|
|
| |
Procurring Entity |
NIGERIA SECURITY AND CIVIL DEFENCE CORPS
|
|
|
|
| |
Budget Amount |
104,564,600.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 277 |
| |
OCID |
ocds-gyl66f-124004001-000156
|
|
Project Title |
PROCUREMENT OF 1 NO. PIAP INSPECTOR ROBOT
|
|
| |
Procurring Entity |
NIGERIA SECURITY AND CIVIL DEFENCE CORPS
|
|
|
|
| |
Budget Amount |
254,209,194.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 278 |
| |
OCID |
ocds-gyl66f-124004001-000158
|
|
Project Title |
PROCUREMENT OF 6 NOS. DELIVERY BED/ COUCH
|
|
| |
Procurring Entity |
NIGERIA SECURITY AND CIVIL DEFENCE CORPS
|
|
|
|
| |
Budget Amount |
150,118,500.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 279 |
| |
OCID |
ocds-gyl66f-124004001-000163
|
|
Project Title |
PROCUREMENT OF 3 NOS. HAEMACCEL
|
|
| |
Procurring Entity |
NIGERIA SECURITY AND CIVIL DEFENCE CORPS
|
|
|
|
| |
Budget Amount |
104,564,600.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 280 |
| |
OCID |
ocds-gyl66f-124004001-000165
|
|
Project Title |
PROCUREMENT OF 80 NOS. COLLAR BELT
|
|
| |
Procurring Entity |
NIGERIA SECURITY AND CIVIL DEFENCE CORPS
|
|
|
|
| |
Budget Amount |
104,564,600.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 281 |
| |
OCID |
ocds-gyl66f-521027025-000015
|
|
Project Title |
PROCUREMENT OF MENTAL CHAIRS FOR OFFICES AND WARDS
|
|
| |
Procurring Entity |
FEDERAL MEDICAL CENTRE, ASABA
|
|
|
|
| |
Budget Amount |
50,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
211,713,673.50
|
|
Contractor |
DOS ELECTRIC COMPANY LIMITED
|
|
| |
Procurement Stage |
Tender Stage
|
|
Status |
|
|
| |
|
| 282 |
| |
OCID |
ocds-gyl66f-521027025-000016
|
|
Project Title |
CONSTRUCTION OF OFFICERS QUARTERS
|
|
| |
Procurring Entity |
FEDERAL MEDICAL CENTRE, ASABA
|
|
|
|
| |
Budget Amount |
200,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 283 |
| |
OCID |
ocds-gyl66f-521027025-000029
|
|
Project Title |
MEDICAL MISSION IN ISOKO SOUTH L.G.A, DELTA STATE
|
|
| |
Procurring Entity |
FEDERAL MEDICAL CENTRE, ASABA
|
|
|
|
| |
Budget Amount |
90,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 284 |
| |
OCID |
ocds-gyl66f-521027025-000030
|
|
Project Title |
MEDICAL OUTREACH IN OGBARU, ANAMBRA STATE
|
|
| |
Procurring Entity |
FEDERAL MEDICAL CENTRE, ASABA
|
|
|
|
| |
Budget Amount |
100,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 285 |
| |
OCID |
ocds-gyl66f-517023001-000010
|
|
Project Title |
Purchase of Office Furniture and Fittings
|
|
| |
Procurring Entity |
FEDERAL UNIVERSITY OF PETROLEUM RESOURCES, EFFURUN
|
|
|
|
| |
Budget Amount |
16,000,000.00
NGN
|
|
Budget year |
2019
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 286 |
| |
OCID |
ocds-gyl66f-517023001-000011
|
|
Project Title |
Purchase of Motor Vehicles
|
|
| |
Procurring Entity |
FEDERAL UNIVERSITY OF PETROLEUM RESOURCES, EFFURUN
|
|
|
|
| |
Budget Amount |
18,000,000.00
NGN
|
|
Budget year |
2019
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 287 |
| |
OCID |
ocds-gyl66f-220015001-000001
|
|
Project Title |
Procurement of Office Stationery
|
|
| |
Procurring Entity |
PENSION TRANSITIONAL ARRANGEMENT DEPARTMENT (PTAD) HQTRS
|
|
|
|
| |
Budget Amount |
1,033,493,567.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 288 |
| |
OCID |
ocds-gyl66f-521003001-03206
|
|
Project Title |
MEDICAL EQUIPMENTS AT DEGEMA BONNY FC & OGBA/EGBEME/NDONI/ABOADA W FC IN RIVERS AND APIAPUM OBUBRA I
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
14,649,899.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 289 |
| |
OCID |
ocds-gyl66f-521003001-03207
|
|
Project Title |
SUPPLY OF MORTUARY EQUIPMENT IN OKENE 250 NOS BED COTTAGE HOSPITAL IN OKENE, KOGI STATE
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
20,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 290 |
| |
OCID |
ocds-gyl66f-521003001-03208
|
|
Project Title |
SUPPLY /INSTALLATION OF DIALYSIS MACHINES AND WATER REVERSE OSMOSIS MACHINE AT EPE GENERAL HOSPITAL,
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
12,557,056.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 291 |
| |
OCID |
ocds-gyl66f-521003001-04225
|
|
Project Title |
EQUIPPING/FURNISHING OF UMUAMUSA COMPREHENSIVE HEALTH CENTRE INCLUDING ONE AMBULANCE IMO STATE
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
50,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 292 |
| |
OCID |
ocds-gyl66f-521003001-04226
|
|
Project Title |
EQUIPPING OF HEALTH CENTRES IN ULEMO COMMUNITIES, EDO STATE
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
30,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 293 |
| |
OCID |
ocds-gyl66f-521003001-04227
|
|
Project Title |
EQUIPPING AND FURNISHING OF PRIMARY HEALTH CENTRE AT FEDERAL UNIVERSITY, NDIAFU/ALIHE, EBONYI STATE
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
50,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 294 |
| |
OCID |
ocds-gyl66f-521003001-04228
|
|
Project Title |
EQUIPPING AND FURNISHING OF PRIMARY HEALTH CENTRE AT UTAGBA OGBE ISUMPE ROAD, KWALE, DELTA STATE
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
10,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 295 |
| |
OCID |
ocds-gyl66f-521003001-04275
|
|
Project Title |
RENOVATION OF PRIMARY HEALTH CENTRE AT ORAUKWU, IDEMILI NORTH LGA, ANAMBRA CENTRAL SENATORIAL DISTRI
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
15,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 296 |
| |
OCID |
ocds-gyl66f-521003001-04276
|
|
Project Title |
RENOVATION OF MEDICAL HEALTH CENTRE AT IPARI, OTUKPA, OGBADIBO L.G.A. BENUE STATE
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
15,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 297 |
| |
OCID |
ocds-gyl66f-521003001-04277
|
|
Project Title |
RENOVATION OF HEALTH CARE CENTRES AT ODUKPANI/CALABAR MUNICIPALITY IN CROSS RIVER SOUTH SENATORIAL D
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
31,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 298 |
| |
OCID |
ocds-gyl66f-521003001-04278
|
|
Project Title |
RENOVATION OF PRIMARY HEALTH CARE CENTRE AT ADANKO KPASHIMUNA WARD IN LAMURDE LGA, ADAMAWA STATE
|
|
| |
Procurring Entity |
NATIONAL PRIMARY HEALTH CARE DEVELOPMENT AGENCY
|
|
|
|
| |
Budget Amount |
20,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 299 |
| |
OCID |
ocds-gyl66f-124004001-000095
|
|
Project Title |
PROCUREMENT OF 9 NOS. DETONATOR KITS
|
|
| |
Procurring Entity |
NIGERIA SECURITY AND CIVIL DEFENCE CORPS
|
|
|
|
| |
Budget Amount |
254,209,194.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 300 |
| |
OCID |
ocds-gyl66f-124004001-000096
|
|
Project Title |
PROCUREMENT OF 200 UNITS OF FRAGMENTED JACKET
|
|
| |
Procurring Entity |
NIGERIA SECURITY AND CIVIL DEFENCE CORPS
|
|
|
|
| |
Budget Amount |
445,164,570.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 301 |
| |
OCID |
ocds-gyl66f-124004001-000097
|
|
Project Title |
PROCUREMENT OF 200 UNITS OF WRIST WATCH AUDIO RECORDER
|
|
| |
Procurring Entity |
NIGERIA SECURITY AND CIVIL DEFENCE CORPS
|
|
|
|
| |
Budget Amount |
445,164,570.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 302 |
| |
OCID |
ocds-gyl66f-116001001-000081
|
|
Project Title |
PROCUREMENT OF COMPUTERS AND ASSESSORIES TO THE MINISTRY OF DEFENCE HEADQUARTERS, SHIP HOUSE, ABUJA
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
190,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
4,814,250.00
|
|
Contractor |
M/S UGOMEC AND ASSOCIATES
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 303 |
| |
OCID |
ocds-gyl66f-116001001-000087
|
|
Project Title |
PURCHASE OF MEDICAL EQUIPMENT FOR MINISTRY OF DEFENCE STAFF CLINIC, ABUJA, FCT
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
284,172,017.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
15,286,650.00
|
|
Contractor |
M/S FABWA ASSOCIATES LTD
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 304 |
| |
OCID |
ocds-gyl66f-116001001-000089
|
|
Project Title |
SUPPLY OF MULTI PARAMETER PATIENT MONITOR AND SYRINGE INFUSION PUMP TO THE MINSTRY OF DEFENCE HEADQU
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
284,172,017.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
4,752,000.00
|
|
Contractor |
M/S SURE HEALTH INVESTMENT LTD
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 305 |
| |
OCID |
ocds-gyl66f-116001001-000094
|
|
Project Title |
PURCHASE OF AN ADVANCED OTOSCOPY STIMULATOR TO THE MINISTRY OF DEFENCE HEADQUARTERS
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
284,172,017.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
3,570,000.00
|
|
Contractor |
WUNCO NIG LTD
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 306 |
| |
OCID |
ocds-gyl66f-116001001-000096
|
|
Project Title |
PROCUREMENT OF PREMIUM QUALITY QUALITY STARTRAC TOTAL BODY TRAINER (ELLIPTICAL) GYM EQUIPMENT AND FO
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
284,172,017.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
4,101,100.00
|
|
Contractor |
FABWA ASSOCIATES LIMITED
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 307 |
| |
OCID |
ocds-gyl66f-116001001-000103
|
|
Project Title |
PURCHASE OF THREE (3) SUKAM INVERTERS (3.0 KVA) AND ACCESSORIES TO THE MINISTRY OF DEFENCE HEADQUART
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
1,500,954,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
3,501,225.00
|
|
Contractor |
M/S TAHMID INTEGRATED RESOURCES
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 308 |
| |
OCID |
ocds-gyl66f-116001001-000105
|
|
Project Title |
PROCUREMENT OF MOD SPORTS MATERIALS TO MINISTRY OF DEFENCE HEADQUARTERS, SHIP HOUSE, GARKI, ABUJA
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
287,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 309 |
| |
OCID |
ocds-gyl66f-231001001-000025
|
|
Project Title |
URBAN RENEWAL AND SLUM UPGRADING INVOLVING PROVISION OF SOLAR POWERED BOREHOLE IN OFFA, KWARA STATE
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
9,681,313.00
NGN
|
|
Budget year |
2019
|
|
| |
Project Amount |
8,965,864.00
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 310 |
| |
OCID |
ocds-gyl66f-231001001-000030
|
|
Project Title |
Construction of Ugwueme-Nenwele-Mkwe-Ezere-Awgunta-Obeagu-Mgbidi Nmaku Road in Egunu State C/No. 634
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
1,566,800,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
6,437,166,957.38
|
|
Contractor |
Rockbridge Construction Nigeria Limited
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
| 311 |
| |
OCID |
ocds-gyl66f-231001001-000032
|
|
Project Title |
Rehabilitation of Nguru-Gashua-Bayamari Road, Section II (Nguru-Gashua) Phase II (KM30+000-KM62+000)
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
2,700,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
10,509,584,430.13
|
|
Contractor |
Mothercat Limited
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
| 312 |
| |
OCID |
ocds-gyl66f-231001001-000034
|
|
Project Title |
Reconstruction of Bida-Lambata Road in Niger State
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
600,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
33,305,001,956.57
|
|
Contractor |
CGC Nigeria Limited
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
| 313 |
| |
OCID |
ocds-gyl66f-231001001-000040
|
|
Project Title |
Rehabilitation of Auchi-Iyakpi-Weppa Road, Edo State
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
70,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
7,000,000,000.00
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
| 314 |
| |
OCID |
ocds-gyl66f-231001001-000040
|
|
Project Title |
Rehabilitation of Auchi-Iyakpi-Weppa Road, Edo State
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
70,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
7,000,000,000.00
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
|
|
| |
|
| 315 |
| |
OCID |
ocds-gyl66f-231001001-000040
|
|
Project Title |
Rehabilitation of Auchi-Iyakpi-Weppa Road, Edo State
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
70,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
7,000,000,000.00
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
|
|
| |
|
| 316 |
| |
OCID |
ocds-gyl66f-231001001-000040
|
|
Project Title |
Rehabilitation of Auchi-Iyakpi-Weppa Road, Edo State
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
70,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
7,000,000,000.00
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
|
|
| |
|
| 317 |
| |
OCID |
ocds-gyl66f-231001001-000040
|
|
Project Title |
Rehabilitation of Auchi-Iyakpi-Weppa Road, Edo State
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
70,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
7,000,000,000.00
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
|
|
| |
|
| 318 |
| |
OCID |
ocds-gyl66f-231001001-000040
|
|
Project Title |
Rehabilitation of Auchi-Iyakpi-Weppa Road, Edo State
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
70,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
7,000,000,000.00
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
|
|
| |
|
| 319 |
| |
OCID |
ocds-gyl66f-231001001-000040
|
|
Project Title |
Rehabilitation of Auchi-Iyakpi-Weppa Road, Edo State
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
70,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
7,000,000,000.00
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
|
|
| |
|
| 320 |
| |
OCID |
ocds-gyl66f-231001001-000040
|
|
Project Title |
Rehabilitation of Auchi-Iyakpi-Weppa Road, Edo State
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
70,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
7,000,000,000.00
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
|
|
| |
|
| 321 |
| |
OCID |
ocds-gyl66f-231001001-000040
|
|
Project Title |
Rehabilitation of Auchi-Iyakpi-Weppa Road, Edo State
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
70,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
7,000,000,000.00
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
|
|
| |
|
| 322 |
| |
OCID |
ocds-gyl66f-231001001-000040
|
|
Project Title |
Rehabilitation of Auchi-Iyakpi-Weppa Road, Edo State
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
70,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
7,000,000,000.00
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
|
|
| |
|
| 323 |
| |
OCID |
ocds-gyl66f-231001001-000040
|
|
Project Title |
Rehabilitation of Auchi-Iyakpi-Weppa Road, Edo State
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
70,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
7,000,000,000.00
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
|
|
| |
|
| 324 |
| |
OCID |
ocds-gyl66f-231001001-000040
|
|
Project Title |
Rehabilitation of Auchi-Iyakpi-Weppa Road, Edo State
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
70,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
7,000,000,000.00
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
|
|
| |
|
| 325 |
| |
OCID |
ocds-gyl66f-231001001-000040
|
|
Project Title |
Rehabilitation of Auchi-Iyakpi-Weppa Road, Edo State
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
70,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
7,000,000,000.00
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
|
|
| |
|
| 326 |
| |
OCID |
ocds-gyl66f-521027040-000003
|
|
Project Title |
PROCUREMENT OF UTILITY VEHICLES
|
|
| |
Procurring Entity |
NATIONAL EAR CARE CENTRE KADUNA
|
|
|
|
| |
Budget Amount |
34,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
29,909,250.00
|
|
Contractor |
GLOBE MOTORS
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
|
|
| |
|
| 327 |
| |
OCID |
ocds-gyl66f-222030001-000005
|
|
Project Title |
Procurement of 7 units, Hyundai Sonata Elite SE GLS 2.0L
|
|
| |
Procurring Entity |
NIGERIAN INVESTMENT PROMOTION COMMISSION
|
|
|
|
| |
Budget Amount |
162,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Tender Stage
|
|
Status |
|
|
| |
|
| 328 |
| |
OCID |
ocds-gyl66f-222030001-000007
|
|
Project Title |
Purchase of Office Furniture and Fittings
|
|
| |
Procurring Entity |
NIGERIAN INVESTMENT PROMOTION COMMISSION
|
|
|
|
| |
Budget Amount |
30,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 329 |
| |
OCID |
ocds-gyl66f-222030001-000009
|
|
Project Title |
Purchase of Computer Printers
|
|
| |
Procurring Entity |
NIGERIAN INVESTMENT PROMOTION COMMISSION
|
|
|
|
| |
Budget Amount |
25,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 330 |
| |
OCID |
ocds-gyl66f-222030001-000014
|
|
Project Title |
Research and Development
|
|
| |
Procurring Entity |
NIGERIAN INVESTMENT PROMOTION COMMISSION
|
|
|
|
| |
Budget Amount |
20,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 331 |
| |
OCID |
ocds-gyl66f-222030001-000016
|
|
Project Title |
Sinking fund for infrastructural Development
|
|
| |
Procurring Entity |
NIGERIAN INVESTMENT PROMOTION COMMISSION
|
|
|
|
| |
Budget Amount |
97,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 332 |
| |
OCID |
ocds-gyl66f-116001001-000111
|
|
Project Title |
Construction of 1 Unit of 12 Family CBQ at Army Barracks, Gusau.
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
2,300,954,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
88,585,332.64
|
|
Contractor |
M/S UYK NIG LTD
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
| 333 |
| |
OCID |
ocds-gyl66f-116001001-000113
|
|
Project Title |
Construction of 1 Unit of 2 Bedroom Block of 6 Flats at NAF Base, Daura, Katsina State
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
2,300,954,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
98,112,927.56
|
|
Contractor |
M/S TLMB CONSTRUCTION LTD
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
| 334 |
| |
OCID |
ocds-gyl66f-116001001-000074
|
|
Project Title |
SUPPLY OF FURNITURE AND EQUIPMENT AT THE CIVILIAN PERSONNEL UNIT BUILDING 3RD DIV. JOS, PLATEAU STAT
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
190,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
1,850,650.00
|
|
Contractor |
DPI NIG LTD
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 335 |
| |
OCID |
ocds-gyl66f-116001001-000079
|
|
Project Title |
SUPPLY OF COMPUTERS, PRINTERS AND ACCESSORIES FOR THE MINSTRY OF DEFENCE HEADQUARTERS, SHIP HOUSE,
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
190,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 336 |
| |
OCID |
ocds-gyl66f-116001001-000080
|
|
Project Title |
SUPPLY OF LAW PAVILLION HARDWARE, SOFTWARE AND INTERNET ROUTER FOR LEGAL DEPARTMENT, MINISTRY OF DEF
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
190,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
4,800,000.00
|
|
Contractor |
M/S LOKO RESOURCES NIG. LTD
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 337 |
| |
OCID |
ocds-gyl66f-116001001-000082
|
|
Project Title |
SUPPLY OF COMPUTER HARDWARE TO THE MINISTRY OF DEFENCE HEADQUARTERS, SHIP HOUSE, ABUJA
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
190,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 338 |
| |
OCID |
ocds-gyl66f-116001001-000086
|
|
Project Title |
SUPPLY AND INSTALLATION OF TWO (2) PACKAGE UNIT AIR CONDITIONERS (3 TONS) IN THE LIFTS ENGINE ROOM A
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
190,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 339 |
| |
OCID |
ocds-gyl66f-116001001-000088
|
|
Project Title |
SUPPLY OF ADULT AND PAEDIADRIC BASIC LIFE SUPPORT MANNEQUINS FOR THE MINISTRY OF DEFENCE HEADQUARTER
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
284,172,017.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
4,997,000.00
|
|
Contractor |
M/S SURE HEALTH INVESTMENT LTD
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 340 |
| |
OCID |
ocds-gyl66f-116001001-000095
|
|
Project Title |
PROCUREMENT OF INTUBATION STIMULATORS, EPISTAXIS CONTROL SIMULATORS AND ANATOMICAL MODELS (ORIT AND
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
284,172,017.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
4,900,000.00
|
|
Contractor |
TRUSTFIELD GLOBAL NETWORK
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 341 |
| |
OCID |
ocds-gyl66f-116001001-000097
|
|
Project Title |
MAINTENANCE, RECALIBERATION AND PURCHASE OF EYE EQUIPMENT FOR THE MINISTRY OF DEFENCE HEADQUARTERS,
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
284,172,017.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
4,998,000.00
|
|
Contractor |
BABADOS GLOBAL RESOURCES LTD
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 342 |
| |
OCID |
ocds-gyl66f-116001001-000106
|
|
Project Title |
PRODUCTION OF ONE HUNDRED (100) UNITS OF PLAQUE FOR THE MINISTRY OF DEFENCE HEADQUARTERS, ABUJA
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
45,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
2,500,000.00
|
|
Contractor |
M/S LUXURATE CONTRACTING SERVICES LTD
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 343 |
| |
OCID |
ocds-gyl66f-116001001-000110
|
|
Project Title |
Construction of 1 Unit of 12 Family CBQ at Giginya Barracks, Sokoto.
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
2,330,954,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
88,585,332.64
|
|
Contractor |
M/S JAMMEC WEST AFRICA
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
| 344 |
| |
OCID |
ocds-gyl66f-231001001-000024
|
|
Project Title |
URBAN RENEWAL AND SLUM UPGRADING INVOLVING PROVISION OF SOLAR POWERED BOREHOLE IN KATSINA, KATSINA S
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
9,681,313.00
NGN
|
|
Budget year |
2019
|
|
| |
Project Amount |
8,965,864.00
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 345 |
| |
OCID |
ocds-gyl66f-231001001-000026
|
|
Project Title |
HOSTING OF NATIONAL SLUM SUMMIT IN ABUJA, FCT
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
13,360,211.00
NGN
|
|
Budget year |
2019
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 346 |
| |
OCID |
ocds-gyl66f-231001001-000029
|
|
Project Title |
SERVICOM UTILITY VEHICLE
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
50,200,000.00
NGN
|
|
Budget year |
2019
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 347 |
| |
OCID |
ocds-gyl66f-231001001-000031
|
|
Project Title |
Rehabilitation of Efire-Araromi-Aiyede-Aiyela Road in Ogun State C/No 6293
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
800,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
14,405,134,473.68
|
|
Contractor |
Raynolds Construction Company Limited
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
| 348 |
| |
OCID |
ocds-gyl66f-231001001-000033
|
|
Project Title |
Rehabilitation of Babban Lamba-Sharram Road in Plateau State
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
184,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
19,392,550,107.32
|
|
Contractor |
Ric Rock Construction Nigeria Limited
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
| 349 |
| |
OCID |
ocds-gyl66f-231001001-000039
|
|
Project Title |
Construction of Isienmwenro Road/Sokponba Road, Benin City, Edo State
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
170,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
170,000,000.00
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
| 350 |
| |
OCID |
ocds-gyl66f-231001001-000041
|
|
Project Title |
Construction of 1.2km Rural Road and Drainage Lugbe by Police Junction through FHA in AMAC
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
80,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
|
|
| |
|
| 351 |
| |
OCID |
ocds-gyl66f-231001001-000045
|
|
Project Title |
Rehabilitation of Ikorodu-Shagamu Road in Lagos and Ogun States, Contract No. 6271
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
1,200,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
20,845,336,248.20
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
|
|
| |
|
| 352 |
| |
OCID |
ocds-gyl66f-231001001-000045
|
|
Project Title |
Rehabilitation of Ikorodu-Shagamu Road in Lagos and Ogun States, Contract No. 6271
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
1,200,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
20,845,336,248.20
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
|
|
| |
|
| 353 |
| |
OCID |
ocds-gyl66f-231001001-000045
|
|
Project Title |
Rehabilitation of Ikorodu-Shagamu Road in Lagos and Ogun States, Contract No. 6271
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
1,200,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
20,845,336,248.20
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
| 354 |
| |
OCID |
ocds-gyl66f-231001001-000045
|
|
Project Title |
Rehabilitation of Ikorodu-Shagamu Road in Lagos and Ogun States, Contract No. 6271
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
1,200,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
20,845,336,248.20
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
|
|
| |
|
| 355 |
| |
OCID |
ocds-gyl66f-231001001-000045
|
|
Project Title |
Rehabilitation of Ikorodu-Shagamu Road in Lagos and Ogun States, Contract No. 6271
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
1,200,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
20,845,336,248.20
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
|
|
| |
|
| 356 |
| |
OCID |
ocds-gyl66f-521027040-000002
|
|
Project Title |
PROCUREMENT OF MEDICAL/HEALTH EQUIPMENTS
|
|
| |
Procurring Entity |
NATIONAL EAR CARE CENTRE KADUNA
|
|
|
|
| |
Budget Amount |
131,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 357 |
| |
OCID |
ocds-gyl66f-222030001-000006
|
|
Project Title |
Purchase of Motor Vehicles
|
|
| |
Procurring Entity |
NIGERIAN INVESTMENT PROMOTION COMMISSION
|
|
|
|
| |
Budget Amount |
46,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 358 |
| |
OCID |
ocds-gyl66f-222030001-000008
|
|
Project Title |
Purchase of Computers
|
|
| |
Procurring Entity |
NIGERIAN INVESTMENT PROMOTION COMMISSION
|
|
|
|
| |
Budget Amount |
20,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 359 |
| |
OCID |
ocds-gyl66f-222030001-000015
|
|
Project Title |
Monitoring and Evaluation
|
|
| |
Procurring Entity |
NIGERIAN INVESTMENT PROMOTION COMMISSION
|
|
|
|
| |
Budget Amount |
113,500,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 360 |
| |
OCID |
ocds-gyl66f-116001001-000112
|
|
Project Title |
Construction of 1 Unit of 30 Family CBQ at Command and Staff College, Jaji, Kaduna.
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
2,300,954,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
205,089,241.92
|
|
Contractor |
M/S TLMB CONSTRUCTION LTD
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 361 |
| |
OCID |
ocds-gyl66f-116001001-000118
|
|
Project Title |
SUPPLY OF VBL SPARE PARTS FOR THE NIGERIAN ARMY
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
170,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 362 |
| |
OCID |
ocds-gyl66f-116001001-000126
|
|
Project Title |
ARMED FORCES COUNCIL SECRETARIAT
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
10,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 363 |
| |
OCID |
ocds-gyl66f-116001001-000128
|
|
Project Title |
Construction of 1 Unit of 14 Family CBQ at Army Barracks, Asa, Abia State.
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
2,300,954,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
124,982,084.26
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 364 |
| |
OCID |
ocds-gyl66f-116001001-000132
|
|
Project Title |
PURCHASE/ACQUISITION OF LAND (NIGERIAN AIR FORCE KADUNA
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
300,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 365 |
| |
OCID |
ocds-gyl66f-116001001-000083
|
|
Project Title |
PROCUREMENT OF OFFICE EQUIPMENT AND WORKING MATERIALS FOR THE PROCUREMENT DEPARTMENT
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
190,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
3,708,888.75
|
|
Contractor |
M/S LOKO RESOURCES NIG. LTD
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
| 366 |
| |
OCID |
ocds-gyl66f-116001001-000084
|
|
Project Title |
SUPPLY OF FIRE PROTECTION, PREVENTION AND SECURITY DEVICE TO THE MINISTRY OF DEFENCE HEADQUARTERS, S
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
190,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
640,000.00
|
|
Contractor |
M/S PRINCEHOOD CONSOLIDATED LTD
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 367 |
| |
OCID |
ocds-gyl66f-116001001-000085
|
|
Project Title |
PROCUREMENT OF INFORMATION/ COMMUNICATION/ PRESS EQUIPMENT TO THE MINSTRY OF DEFENCE HEADQUARTERS, S
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
190,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
3,813,232.50
|
|
Contractor |
M/S TUNDIS NIGERIA LIMITED
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 368 |
| |
OCID |
ocds-gyl66f-116001001-000098
|
|
Project Title |
PROCUREMENT OF NASAL DEBRIDER SET WITH SHAVING BLADE FOR THE MINISTRY OF DEFENCE HEADQUARTERS, SHIP
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
284,172,017.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
4,975,000.00
|
|
Contractor |
PACHIZUE NIG LTD
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 369 |
| |
OCID |
ocds-gyl66f-116001001-000099
|
|
Project Title |
REPAIR AND MAINTENANCE OF PHYSIOTHERAPY EQUIPMENT AND PROCUREMENT OF SCALING MACHINE FOR THE MINISTR
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
284,172,017.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
4,960,000.00
|
|
Contractor |
GABAYA NIG LTD
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 370 |
| |
OCID |
ocds-gyl66f-116001001-000100
|
|
Project Title |
PROCUREMENT OF 3-IN-1 ENDOSCOPY SET (CAMERA, CCU AND MONITOR + RECORDER) FOR THE MINISTRY OF DEFENCE
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
284,172,017.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
0.00
|
|
Contractor |
AFRIBASED PROJECTS LIMITED
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
|
|
| |
|
| 371 |
| |
OCID |
ocds-gyl66f-116001001-000101
|
|
Project Title |
THE SURVEY, EVALUATION AND ASSESSMENT, METERING DEPLOYMENT, CABLING, INSTALLATION OF ACCESSORIES/ SE
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
250,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
236,995,800.00
|
|
Contractor |
MOMAS ELECTRICITY METERS MANUFACTURING COMPANY
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 372 |
| |
OCID |
ocds-gyl66f-116001001-000102
|
|
Project Title |
SUPPLY OF ALTERNATIVE POWER SOURCE FOR MOD - STAFF CLINIC
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
1,500,954,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
14,931,000.00
|
|
Contractor |
M/S TRUSTFIELD GLOBAL NETWORK
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 373 |
| |
OCID |
ocds-gyl66f-231001001-000042
|
|
Project Title |
Construction of 1.3km Rural Road and Drainage in Jikwoyi Phase 1 in AMAC
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
80,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
8,000,000,000.00
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
|
|
| |
|
| 374 |
| |
OCID |
ocds-gyl66f-231001001-000042
|
|
Project Title |
Construction of 1.3km Rural Road and Drainage in Jikwoyi Phase 1 in AMAC
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
80,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
8,000,000,000.00
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
| 375 |
| |
OCID |
ocds-gyl66f-231001001-000042
|
|
Project Title |
Construction of 1.3km Rural Road and Drainage in Jikwoyi Phase 1 in AMAC
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
80,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
8,000,000,000.00
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
|
|
| |
|
| 376 |
| |
OCID |
ocds-gyl66f-231001001-000042
|
|
Project Title |
Construction of 1.3km Rural Road and Drainage in Jikwoyi Phase 1 in AMAC
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
80,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
8,000,000,000.00
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
|
|
| |
|
| 377 |
| |
OCID |
ocds-gyl66f-231001001-000042
|
|
Project Title |
Construction of 1.3km Rural Road and Drainage in Jikwoyi Phase 1 in AMAC
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
80,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
8,000,000,000.00
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
|
|
| |
|
| 378 |
| |
OCID |
ocds-gyl66f-231001001-000043
|
|
Project Title |
Repairs of failed Section of Apapa-Ijora Flyover and Approach Road by Leventis in Lagos (Apap-Ijora
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
614,023,533.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
449,079,139.95
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
|
|
| |
|
| 379 |
| |
OCID |
ocds-gyl66f-231001001-000043
|
|
Project Title |
Repairs of failed Section of Apapa-Ijora Flyover and Approach Road by Leventis in Lagos (Apap-Ijora
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
614,023,533.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
449,079,139.95
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
| 380 |
| |
OCID |
ocds-gyl66f-231001001-000043
|
|
Project Title |
Repairs of failed Section of Apapa-Ijora Flyover and Approach Road by Leventis in Lagos (Apap-Ijora
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
614,023,533.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
449,079,139.95
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
|
|
| |
|
| 381 |
| |
OCID |
ocds-gyl66f-231001001-000043
|
|
Project Title |
Repairs of failed Section of Apapa-Ijora Flyover and Approach Road by Leventis in Lagos (Apap-Ijora
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
614,023,533.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
449,079,139.95
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
|
|
| |
|
| 382 |
| |
OCID |
ocds-gyl66f-231001001-000044
|
|
Project Title |
Reconstruction of Magami-Kwajale-Ningi Road in Bauchi State (Contract No. 6411)
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
434,400,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
|
|
| |
|
| 383 |
| |
OCID |
ocds-gyl66f-222030001-000010
|
|
Project Title |
Purchase of Photocopying Machines
|
|
| |
Procurring Entity |
NIGERIAN INVESTMENT PROMOTION COMMISSION
|
|
|
|
| |
Budget Amount |
5,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 384 |
| |
OCID |
ocds-gyl66f-222030001-000011
|
|
Project Title |
Purchase of Shredding Machines
|
|
| |
Procurring Entity |
NIGERIAN INVESTMENT PROMOTION COMMISSION
|
|
|
|
| |
Budget Amount |
1,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 385 |
| |
OCID |
ocds-gyl66f-222030001-000012
|
|
Project Title |
Computer software acquisition
|
|
| |
Procurring Entity |
NIGERIAN INVESTMENT PROMOTION COMMISSION
|
|
|
|
| |
Budget Amount |
58,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 386 |
| |
OCID |
ocds-gyl66f-222030001-000013
|
|
Project Title |
Rehabilitation and Repairs of Office Buildings
|
|
| |
Procurring Entity |
NIGERIAN INVESTMENT PROMOTION COMMISSION
|
|
|
|
| |
Budget Amount |
40,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 387 |
| |
OCID |
ocds-gyl66f-116001001-000114
|
|
Project Title |
Construction of 1 Unit of 3 Bedroom Block of 6 flats at Army Barracks, Shadawanka, Bauchi.
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
2,300,954,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
123,077,376.63
|
|
Contractor |
M/S CLEMS & OK SYNERGY LTD
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
| 388 |
| |
OCID |
ocds-gyl66f-116001001-000115
|
|
Project Title |
Construction of 1 Unit of 2 Bedroom Block of 6 flats at NAF Base, Yola, Adamawa State.
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
2,300,954,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
109,865,367.22
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 389 |
| |
OCID |
ocds-gyl66f-116001001-000116
|
|
Project Title |
Construction of 1 Unit of 12 Family CBQ at Army Barracks, Gombe, Gombe State.
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
2,300,954,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
80,319,311.14
|
|
Contractor |
Fadil and Farida Inv & Property Ltd
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 390 |
| |
OCID |
ocds-gyl66f-116001001-000117
|
|
Project Title |
Construction of 1 Unit of 14 Family CBQ at Army Barracks, Biu, Borno State.
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
2,300,954,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
115,096,709.42
|
|
Contractor |
Al-Amir Int'l Nig.Ltd
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 391 |
| |
OCID |
ocds-gyl66f-116001001-000129
|
|
Project Title |
Construction of 1 Unit of 3 Bedroom Block of 6 flats at Nwagu Barracks, Abakaliki, Ebonyi State.
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
2,300,954,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
114,921,400.28
|
|
Contractor |
LIARA NIG LIMITED
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
| 392 |
| |
OCID |
ocds-gyl66f-116001001-000130
|
|
Project Title |
Construction of 1 Unit of 12 Family CBQ at Army Barracks, Onitsha, Anambra State.
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
2,300,954,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
99,770,594.20
|
|
Contractor |
BELSA'AD GLOBAL SERVICES LTD
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
| 393 |
| |
OCID |
ocds-gyl66f-116001001-000131
|
|
Project Title |
Construction of 1 Unit of 12 Family CBQ at NAF Base, Enugu.
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
2,300,954,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
99,817,849.09
|
|
Contractor |
M/S I.C.O ENGINEERING CONSULT LIMITED
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 394 |
| |
OCID |
ocds-gyl66f-116001001-000075
|
|
Project Title |
SUPPLY OF FURNITURE AND EQUIPMENT AT THE CIVILIAN PERSONNEL UNIT BUILDING MILITARY HOSPITAL BENIN, E
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
190,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
2,103,547.50
|
|
Contractor |
M/S CLET AND CLETTA NIG LTD
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 395 |
| |
OCID |
ocds-gyl66f-116001001-000076
|
|
Project Title |
SUPPLY OF OFFICE EQUIPMENT TO THE MINISTRY OF DEFENCE HEADQUARTERS
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
190,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Tender Stage
|
|
Status |
|
|
| |
|
| 396 |
| |
OCID |
ocds-gyl66f-116001001-000077
|
|
Project Title |
SUPPLY OF STATIONERIES, COMPUTER SYSTEMS (WITH ACCESSORIES) AND PRINTERS FOR SERVICOM UNITS IN THE C
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
190,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 397 |
| |
OCID |
ocds-gyl66f-116001001-000078
|
|
Project Title |
PROCUREMENT OF OFFICE EQUIPMENT AND ACCESSORIES FOR THE MINSTRY OF DEFENCE HEADQUARTERS, SHIP HOUSE,
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
190,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
4,576,120.50
|
|
Contractor |
M/S BILA CON LTD
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 398 |
| |
OCID |
ocds-gyl66f-116001001-000090
|
|
Project Title |
SUPPLY OF MIDDLE EAR ANALYSER TO THE MINSTRY OF DEFENCE HEADQUARTERS, SHIP HOUSE, ABUJA
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
284,172,017.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
4,992,000.00
|
|
Contractor |
BARUCH-ARIS WORKS LTD
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 399 |
| |
OCID |
ocds-gyl66f-116001001-000091
|
|
Project Title |
SUPPLY OF PACHYMETER TO THE MINSTRY OF DEFENCE HEADQUARTERS, SHIP HOUSE, ABUJA
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
284,172,017.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
4,996,000.00
|
|
Contractor |
FLOCHA COMPANY LTD
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 400 |
| |
OCID |
ocds-gyl66f-116001001-000093
|
|
Project Title |
PROCUREMENT OF DIATHERMY MACHINE (MONOPOLAR AND BIPOLAR) FOR THE MINISTRY OF DEFENCE HEADQUARTERS, S
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
284,172,017.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
4,900,000.00
|
|
Contractor |
BABADOS GLOBAL RESOURCES LTD
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 401 |
| |
OCID |
ocds-gyl66f-116001001-000107
|
|
Project Title |
CONSTRUCTION OF DISABLED ENTRANCE RAMP AT THE MINSTRY OF DEFENCE HEADQUARTERS, SHIP HOUSE, ABUJA
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
949,000,029.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
55,373,877.17
|
|
Contractor |
M/S BENGABSON ENTERPRISESLTD
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 402 |
| |
OCID |
ocds-gyl66f-116001001-000108
|
|
Project Title |
PUBLIC PROCUREMENT TRAINING OF25 NOS. OFFICERS INVOLVED IN THE PROCUREMENT VALUE CHAIN
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
38,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
2,500,000.00
|
|
Contractor |
M/S A4 ASSOCIATES LTD
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 403 |
| |
OCID |
ocds-gyl66f-116001001-000109
|
|
Project Title |
Construction of 1 Unit of 3 Bedroom Block of 6 flats at Army Barracks Natsinta, Katsina.
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
2,300,954,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
108,620,747.57
|
|
Contractor |
M/S DAN ADIDA
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
| 404 |
| |
OCID |
ocds-gyl66f-231001001-000027
|
|
Project Title |
PURCHASE OF PHOTOCOPIERS, PRINTERS, SCANNERS & COMPUTERS FOR EFFECTIVE EXECUTION OF ASSIGNMENT
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
6,680,105.00
NGN
|
|
Budget year |
2019
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 405 |
| |
OCID |
ocds-gyl66f-231001001-000028
|
|
Project Title |
PURCHASE OF PROJECT VEHICLES OF 1NO. TOYOTA HILUX AND 1NO TOYOTA HAICE BUS FOR PROPER SUPERVISION AN
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
40,080,635.00
NGN
|
|
Budget year |
2019
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 406 |
| |
OCID |
ocds-gyl66f-231001001-000035
|
|
Project Title |
Reconstruction of Sumaila-Falali-Birnin Bako-Bauchi State Border Road in Kano State, Contract No. 62
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
900,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
4,578,813,522.36
|
|
Contractor |
Spectrum Engineering Limited
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
| 407 |
| |
OCID |
ocds-gyl66f-231001001-000036
|
|
Project Title |
Construction of Road in Odogbe, Esan Central LGA in Edo State
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
100,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
100,000,000.00
|
|
Contractor |
Nugi Limited
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
| 408 |
| |
OCID |
ocds-gyl66f-231001001-000037
|
|
Project Title |
Rehabilitation of Nasty Road Ewu in Edo State
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
230,700,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
230,700,000.00
|
|
Contractor |
Adland Projects Nigeria Limited
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
| 409 |
| |
OCID |
ocds-gyl66f-231001001-000038
|
|
Project Title |
Rehabilitation of Irrua-Ibore, Afuda, Udomi –Ohe Road and Drains in Edo State
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
294,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
294,000,000.00
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
| 410 |
| |
OCID |
ocds-gyl66f-222030001-000001
|
|
Project Title |
Supply of year end Ex-Gratia Items for staff of NIPC
|
|
| |
Procurring Entity |
NIGERIAN INVESTMENT PROMOTION COMMISSION
|
|
|
|
| |
Budget Amount |
6,271,700.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Tender Stage
|
|
Status |
|
|
| |
|
| 411 |
| |
OCID |
ocds-gyl66f-222030001-000002
|
|
Project Title |
Procurement and installation of Unified Communication Systems
|
|
| |
Procurring Entity |
NIGERIAN INVESTMENT PROMOTION COMMISSION
|
|
|
|
| |
Budget Amount |
23,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Tender Stage
|
|
Status |
|
|
| |
|
| 412 |
| |
OCID |
ocds-gyl66f-222030001-000003
|
|
Project Title |
Procurement and installation of Solar Security, Light and Accessories
|
|
| |
Procurring Entity |
NIGERIAN INVESTMENT PROMOTION COMMISSION
|
|
|
|
| |
Budget Amount |
15,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Tender Stage
|
|
Status |
|
|
| |
|
| 413 |
| |
OCID |
ocds-gyl66f-222030001-000004
|
|
Project Title |
Procurement of 6 units, Nissan Pick-up NP300 2.4L Double Cab 4WD MT
|
|
| |
Procurring Entity |
NIGERIAN INVESTMENT PROMOTION COMMISSION
|
|
|
|
| |
Budget Amount |
162,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Tender Stage
|
|
Status |
|
|
| |
|
| 414 |
| |
OCID |
ocds-gyl66f-231001001-000046
|
|
Project Title |
Construction of Sabon Birnin-Tsululu-Kuya-Maradi Junction Road in Sokoto State, Contract No. 6462
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
950,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
435,474,652.87
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
| 415 |
| |
OCID |
ocds-gyl66f-231001001-000046
|
|
Project Title |
Construction of Sabon Birnin-Tsululu-Kuya-Maradi Junction Road in Sokoto State, Contract No. 6462
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
950,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
435,474,652.87
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
|
|
| |
|
| 416 |
| |
OCID |
ocds-gyl66f-231001001-000046
|
|
Project Title |
Construction of Sabon Birnin-Tsululu-Kuya-Maradi Junction Road in Sokoto State, Contract No. 6462
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
950,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
435,474,652.87
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
|
|
| |
|
| 417 |
| |
OCID |
ocds-gyl66f-116001001-000120
|
|
Project Title |
Construction of 1 Unit of 1,200 Capacity Auditorium, NAFRC, Oshodi.
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
2,300,954,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
105,588,903.89
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 418 |
| |
OCID |
ocds-gyl66f-116001001-000121
|
|
Project Title |
PURCHASE OF VERTA ARMOURD PERSONNEL CARRIER (UKRAINIAN ARMOUR)
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
460,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 419 |
| |
OCID |
ocds-gyl66f-116001001-000122
|
|
Project Title |
Construction of 1 Unit of 12 Family CBQ at NN Apapa, Lagos.
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
2,300,954,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
99,530,396.07
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
| 420 |
| |
OCID |
ocds-gyl66f-116001001-000123
|
|
Project Title |
Construction of 1 Unit of 14 Family CBQ at Owena Barracks, Akure, Ondo State.
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
2,300,954,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
125,077,703.57
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 421 |
| |
OCID |
ocds-gyl66f-116001001-000124
|
|
Project Title |
Construction of 1 Unit of 3 Bedroom Block of 6 flats at NNS Pathfinder, Port Harcourt.
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
2,300,954,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
138,331,336.41
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
| 422 |
| |
OCID |
ocds-gyl66f-116001001-000136
|
|
Project Title |
EQUIPPING OF LAW LIBRARY
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
25,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 423 |
| |
OCID |
ocds-gyl66f-116001001-000137
|
|
Project Title |
PURCHASE OF PROJECT VEHICLES
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
270,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 424 |
| |
OCID |
ocds-gyl66f-220002001-000015
|
|
Project Title |
Miscellaneous Expenses General
|
|
| |
Procurring Entity |
DEBT MANAGEMENT OFFICE
|
|
|
|
| |
Budget Amount |
14,153,091.60
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
14,636,638.00
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
|
|
| |
|
| 425 |
| |
OCID |
ocds-gyl66f-220002001-000015
|
|
Project Title |
Miscellaneous Expenses General
|
|
| |
Procurring Entity |
DEBT MANAGEMENT OFFICE
|
|
|
|
| |
Budget Amount |
14,153,091.60
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
14,636,638.00
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 426 |
| |
OCID |
ocds-gyl66f-220002001-000015
|
|
Project Title |
Miscellaneous Expenses General
|
|
| |
Procurring Entity |
DEBT MANAGEMENT OFFICE
|
|
|
|
| |
Budget Amount |
14,153,091.60
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
14,153,091.00
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
|
|
| |
|
| 427 |
| |
OCID |
ocds-gyl66f-116001001-000138
|
|
Project Title |
Construction of 2 Units of 2 Bedroom (Twin) SNCO at Army Barracks, Bauchi.
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
300,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
33,111,749.86
|
|
Contractor |
M/S SAHAD INVESTMENT LTD
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 428 |
| |
OCID |
ocds-gyl66f-116001001-000145
|
|
Project Title |
Rehabilitation of 1 Unit of 36 Family CBQ at Lungi Barracks
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
300,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
70,214,629.21
|
|
Contractor |
Ken-Psamie Global Ventures
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 429 |
| |
OCID |
ocds-gyl66f-231001001-000060
|
|
Project Title |
Construction of Bridge over River Kaapu, Gbeswa, Ufaan and Expansion of Babanna – Kabe Road in Bor
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
50,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
1,484,500,000.00
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
| 430 |
| |
OCID |
ocds-gyl66f-231001001-000061
|
|
Project Title |
Replacement of Sub-Standard Bridge at Km 51+700 and Km 62+600 (Mayanchi) Along Gusau-Sokoto Road in
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
321,000,739.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
|
|
| |
|
| 431 |
| |
OCID |
ocds-gyl66f-231001001-000062
|
|
Project Title |
Reconstruction of Ohan & Moro Bridges on Ilorin-Igbeti Road in Osun State
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
122,176,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
|
|
| |
|
| 432 |
| |
OCID |
ocds-gyl66f-231001001-000063
|
|
Project Title |
Construction of Ojutu Bridge on Erinle River, Ilobu
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
1,035,994,100.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
|
|
| |
|
| 433 |
| |
OCID |
ocds-gyl66f-231001001-000077
|
|
Project Title |
Rehabilitation of Street Lights on Abuja – Keffi Expressway, Keffi End, Nasarawa State
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
75,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
615,525,755.00
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
|
|
| |
|
| 434 |
| |
OCID |
ocds-gyl66f-231001001-000078
|
|
Project Title |
Rehabilitation of Street Lights on Damaturu – Gombe Road in Yobe State
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
60,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
66,938,462.87
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
| 435 |
| |
OCID |
ocds-gyl66f-231001001-000079
|
|
Project Title |
Rehabilitation of Street Lights on Bauchi – Gombe Road, Gombe End
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
80,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
66,938,462.87
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 436 |
| |
OCID |
ocds-gyl66f-231001001-000080
|
|
Project Title |
Installation of Street Lights on Auchi – Okene Expressway (Auchi End)
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
130,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
102,928,641.37
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 437 |
| |
OCID |
ocds-gyl66f-116001001-000152
|
|
Project Title |
PURCHASE OF SPECIALIZED SECURITY EQUIPMENT
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
200,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 438 |
| |
OCID |
ocds-gyl66f-116001001-000153
|
|
Project Title |
ESTABLISHMENT OF LANGUANGE BUREAU/ INTERPRETATION UNIT
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
5,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 439 |
| |
OCID |
ocds-gyl66f-116001001-000154
|
|
Project Title |
Rehabilitation of 1 Unit of 3 Bedroom Block of 6 Flats (MOQ) at Block 42 An Barracks, Yaba, Lagos.
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
300,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
89,136,265.52
|
|
Contractor |
M/S IBAAB INTERNTIONAL NIGERIA LTD
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 440 |
| |
OCID |
ocds-gyl66f-116001001-000155
|
|
Project Title |
Construction of 1 Unit of 10 Family CBQ at Navy Barracks, Port Harcourt, Rivers State.
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
300,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
71,785,440.54
|
|
Contractor |
M/S DIAMOND SQUARE LTD
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 441 |
| |
OCID |
ocds-gyl66f-220002001-000024
|
|
Project Title |
Travels and Transport General
|
|
| |
Procurring Entity |
DEBT MANAGEMENT OFFICE
|
|
|
|
| |
Budget Amount |
7,756,400.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 442 |
| |
OCID |
ocds-gyl66f-116001001-000160
|
|
Project Title |
CONSTRUCTION OF 1 UNIT ZONAL EDUCATIONAL INSPECTORATE OFFICES IN ENUGU
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
250,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
174,191,771.09
|
|
Contractor |
M/S I.A.C. ALLIED TECHNICAL AND CONSTRUCTION COMPANY
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
| 443 |
| |
OCID |
ocds-gyl66f-116001001-000164
|
|
Project Title |
PURCHASE OF MOTOR VEHICLES
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
270,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Tender Stage
|
|
Status |
|
|
| |
|
| 444 |
| |
OCID |
ocds-gyl66f-116001001-000165
|
|
Project Title |
COMPLETION OF MOD CPU NAF BASE KADUNA
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
60,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
55,378,877.17
|
|
Contractor |
M/S BENGABSON ENT. NIG. LTD
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 445 |
| |
OCID |
ocds-gyl66f-220002001-000025
|
|
Project Title |
Materials & Supplies General
|
|
| |
Procurring Entity |
DEBT MANAGEMENT OFFICE
|
|
|
|
| |
Budget Amount |
4,871,965.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
4,871,965.00
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 446 |
| |
OCID |
ocds-gyl66f-116001001-000166
|
|
Project Title |
RENOVATION OF ARMOURED BRIDGADE, SOBI BARRACKS, ILORIN
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
60,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
55,464,402.80
|
|
Contractor |
M/S FISERV INTERNATIONAL LTD
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 447 |
| |
OCID |
ocds-gyl66f-116001001-000167
|
|
Project Title |
RENOVATION OF MOD CPU, EASTERN NAVAL COMMAND, CALABAR
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
50,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
46,471,847.10
|
|
Contractor |
M/S ANISET INTEGRATED SERVICES
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 448 |
| |
OCID |
ocds-gyl66f-116001001-000171
|
|
Project Title |
WEST AFRICAN LIAISON OFFICE OF INTERNATIONAL MILITARY SPORTS COUNCIL (ON-GOING)
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
105,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 449 |
| |
OCID |
ocds-gyl66f-116001001-000172
|
|
Project Title |
PROCUREMENT OF LIFTS (ELEVATORS)
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
39,677,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
30,563,925.00
|
|
Contractor |
JOEHEL GLOBAL SERVICES LTD
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 450 |
| |
OCID |
ocds-gyl66f-228068001-000005
|
|
Project Title |
Procurement of Laboratory Equipment
|
|
| |
Procurring Entity |
NATIONAL CENTRE FOR ENERGY EFFICIENCY AND CONSERVATIVE,UNIVERSITY OF LAGOS.
|
|
|
|
| |
Budget Amount |
15,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 451 |
| |
OCID |
ocds-gyl66f-238005001-000001
|
|
Project Title |
PURCHASE OF COMPUTERS
|
|
| |
Procurring Entity |
BUDGET OFFICE OF THE FEDERATION
|
|
|
|
| |
Budget Amount |
27,230,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 452 |
| |
OCID |
ocds-gyl66f-238005001-000002
|
|
Project Title |
PURCHASE OF MOTOR VEHICLE
|
|
| |
Procurring Entity |
BUDGET OFFICE OF THE FEDERATION
|
|
|
|
| |
Budget Amount |
104,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 453 |
| |
OCID |
ocds-gyl66f-238005001-000003
|
|
Project Title |
COMPUTER SOFTWARE ACQUISITION
|
|
| |
Procurring Entity |
BUDGET OFFICE OF THE FEDERATION
|
|
|
|
| |
Budget Amount |
30,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 454 |
| |
OCID |
ocds-gyl66f-238005001-000004
|
|
Project Title |
UPGRADING OF THE INTERNET SERVER
|
|
| |
Procurring Entity |
BUDGET OFFICE OF THE FEDERATION
|
|
|
|
| |
Budget Amount |
25,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 455 |
| |
OCID |
ocds-gyl66f-238005001-000005
|
|
Project Title |
PROCUREMENT (BULK PURCHASE) OF DIESEL
|
|
| |
Procurring Entity |
BUDGET OFFICE OF THE FEDERATION
|
|
|
|
| |
Budget Amount |
67,500,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 456 |
| |
OCID |
ocds-gyl66f-124007001-000001
|
|
Project Title |
Design & Construction of L Shape Female Hostel (NFA, Sheda), Abuja.
|
|
| |
Procurring Entity |
FEDERAL FIRE SERVICE
|
|
|
|
| |
Budget Amount |
1,203,519,499.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 457 |
| |
OCID |
ocds-gyl66f-124007001-000002
|
|
Project Title |
Design & Construction of B.A Gallery (NFA, Sheda) Abuja
|
|
| |
Procurring Entity |
FEDERAL FIRE SERVICE
|
|
|
|
| |
Budget Amount |
1,203,519,499.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 458 |
| |
OCID |
ocds-gyl66f-124007001-000003
|
|
Project Title |
supply of 8 Nos. Rapid Intervention Vehicles
|
|
| |
Procurring Entity |
FEDERAL FIRE SERVICE
|
|
|
|
| |
Budget Amount |
2,800,172,273.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 459 |
| |
OCID |
ocds-gyl66f-124007001-000013
|
|
Project Title |
Renovation of Federal Fire Service Headquarters Building, Abuja
|
|
| |
Procurring Entity |
FEDERAL FIRE SERVICE
|
|
|
|
| |
Budget Amount |
1,203,519,499.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 460 |
| |
OCID |
ocds-gyl66f-124007001-000014
|
|
Project Title |
Renovation of FFS Station, Surulere-Lagos
|
|
| |
Procurring Entity |
FEDERAL FIRE SERVICE
|
|
|
|
| |
Budget Amount |
1,203,519,499.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 461 |
| |
OCID |
ocds-gyl66f-124007001-000015
|
|
Project Title |
Renovation of FFS station, Ebute-Meta, Lagos
|
|
| |
Procurring Entity |
FEDERAL FIRE SERVICE
|
|
|
|
| |
Budget Amount |
1,203,519,499.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 462 |
| |
OCID |
ocds-gyl66f-124007001-000016
|
|
Project Title |
Renovation of FFS H/Q Barracks, Abuja
|
|
| |
Procurring Entity |
FEDERAL FIRE SERVICE
|
|
|
|
| |
Budget Amount |
1,203,519,499.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 463 |
| |
OCID |
ocds-gyl66f-124007001-000028
|
|
Project Title |
3 NOS. OPERATIONAL VEHICLES
|
|
| |
Procurring Entity |
FEDERAL FIRE SERVICE
|
|
|
|
| |
Budget Amount |
2,800,172,273.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 464 |
| |
OCID |
ocds-gyl66f-521027003-02152
|
|
Project Title |
Procurement of Solar Power
|
|
| |
Procurring Entity |
FEDERAL MEDICAL CENTRE - JABI ABUJA
|
|
|
|
| |
Budget Amount |
73,266,667.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 465 |
| |
OCID |
ocds-gyl66f-521027003-02153
|
|
Project Title |
PURCHASE OF MOTOR VEHICLES
|
|
| |
Procurring Entity |
FEDERAL MEDICAL CENTRE - JABI ABUJA
|
|
|
|
| |
Budget Amount |
55,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 466 |
| |
OCID |
ocds-gyl66f-521027003-02154
|
|
Project Title |
EQUIPPING OF CRECHE CENTER
|
|
| |
Procurring Entity |
FEDERAL MEDICAL CENTRE - JABI ABUJA
|
|
|
|
| |
Budget Amount |
55,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 467 |
| |
OCID |
ocds-gyl66f-521027003-02155
|
|
Project Title |
EXPANSION AND FURNISHING OF INTENSIVE CARE UNIT
|
|
| |
Procurring Entity |
FEDERAL MEDICAL CENTRE - JABI ABUJA
|
|
|
|
| |
Budget Amount |
75,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 468 |
| |
OCID |
ocds-gyl66f-521027003-03172
|
|
Project Title |
PURCHASE OF HEALTH /MEDICAL EQUIPMENT
|
|
| |
Procurring Entity |
FEDERAL MEDICAL CENTRE - JABI ABUJA
|
|
|
|
| |
Budget Amount |
24,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 469 |
| |
OCID |
ocds-gyl66f-521027003-03173
|
|
Project Title |
CONSTRUCTION OF CRECHE
|
|
| |
Procurring Entity |
FEDERAL MEDICAL CENTRE - JABI ABUJA
|
|
|
|
| |
Budget Amount |
50,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 470 |
| |
OCID |
ocds-gyl66f-231001001-03174
|
|
Project Title |
EMERGENCY REPAIRS OF COLLAPSED TATABU BRIDGE ALONG MOKWA-TEGINA ROAD IN NIGER STATE
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
1,597,416,620.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 471 |
| |
OCID |
ocds-gyl66f-521027003-03175
|
|
Project Title |
CONSTRUCTION /PROVISION OF HOSPITAL/HEALTH CENTERS
|
|
| |
Procurring Entity |
FEDERAL MEDICAL CENTRE - JABI ABUJA
|
|
|
|
| |
Budget Amount |
40,999,999.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 472 |
| |
OCID |
ocds-gyl66f-231001001-04209
|
|
Project Title |
CONSTRUCTION OF YOLA-FUFORE-GURIN ROAD IN ADAMAWA STATE
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
187,817,469.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
13,643,670,884.81
|
|
Contractor |
WIZ CHINA WORLDWIDE ENGINEERING LIMITED
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
| 473 |
| |
OCID |
ocds-gyl66f-231001001-04210
|
|
Project Title |
CONSTRUCTION OF KEBBI-LAMBA-BELEL ROAD IN ADAMAWA STATE
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
563,452,408.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Tender Stage
|
|
Status |
|
|
| |
|
| 474 |
| |
OCID |
ocds-gyl66f-231001001-04211
|
|
Project Title |
CONSTRUCTION OF KUNYA-BABURA-NIGER BORDER:BABURA-NIGER REPUBLIC BORDER IN KANO STATE
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF WORKS & HOUSING - HQTRS
|
|
|
|
| |
Budget Amount |
48,406,564.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 475 |
| |
OCID |
ocds-gyl66f-517029001-000002
|
|
Project Title |
Quarterly Monitoring & Evaluation of Physical Development (Polys, TCs and Specialised-Federal Instit
|
|
| |
Procurring Entity |
NATIONAL BOARD FOR TECHNICAL EDUCATION
|
|
|
|
| |
Budget Amount |
50,320,369.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 476 |
| |
OCID |
ocds-gyl66f-220002001-000011
|
|
Project Title |
Procurement of Air Conditioners
|
|
| |
Procurring Entity |
DEBT MANAGEMENT OFFICE
|
|
|
|
| |
Budget Amount |
3,500,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 477 |
| |
OCID |
ocds-gyl66f-116001001-000003
|
|
Project Title |
REHABILITATION OF 2 UNITS OF 12 FAMILY CBQ, AND 1 UNIT OF MOQ (3 BEDROOM \BUNGALOW) AT NIGERIAN ARMY
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
300,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
69,120,064.74
|
|
Contractor |
IIC CONSTRUCTION COMPANY
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 478 |
| |
OCID |
ocds-gyl66f-116001001-000004
|
|
Project Title |
REHABILITATION OF 2 UNITS OF 12 FAMILY CBQ, AND 1 UNIT OF MOQ (3 BEDROOM BUNGALOW) AT NIGERIAN ARMY
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
300,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
64,795,020.00
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 479 |
| |
OCID |
ocds-gyl66f-116001001-000005
|
|
Project Title |
REHABILITATION OF 7 UNITS OF 2 BED ROOM AT NIGERIAN ARMY BARRACKS, KANO, KANO STATE
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
300,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
70,870,094.98
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 480 |
| |
OCID |
ocds-gyl66f-116001001-000018
|
|
Project Title |
CONSTRUCTION OF NEW MILITARY BARRACK FOR GUARDS BRIGADE AND GARRISON IN ABUJA
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
1,100,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 481 |
| |
OCID |
ocds-gyl66f-116001001-000019
|
|
Project Title |
Construction of 8-Units of 3-Bedroom MOQ bungalow at Guards Brigade Barracks, Abuja
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
1,100,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
117,970,175.40
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 482 |
| |
OCID |
ocds-gyl66f-116001001-000020
|
|
Project Title |
Construction of 2-Units of Soldiers Quarters at Guards Brigade Barracks, Abuja
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
1,100,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
154,928,054.84
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 483 |
| |
OCID |
ocds-gyl66f-116001001-000021
|
|
Project Title |
Construction of 3 Units of 10-Family CBQ at Guards Brigade Barracks Abuja
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
1,100,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
137,128,873.61
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 484 |
| |
OCID |
ocds-gyl66f-116001001-000022
|
|
Project Title |
Construction of 8-Units of 3-Bedroom MOQ bungalow at AHQ Garrison Barracks, Abuja
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
1,100,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
109,176,742.00
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 485 |
| |
OCID |
ocds-gyl66f-116001001-000028
|
|
Project Title |
Construction of 7-Units of 2-Bedroom(Twin) SNCO at Guards Brigade Barracks, Abuja 1
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
300,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 486 |
| |
OCID |
ocds-gyl66f-116001001-000029
|
|
Project Title |
Construction of 8-Units of 3-Bedroom MOQ Bungalow at AHQ Garrison Barracks, Abuja 2
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
1,100,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 487 |
| |
OCID |
ocds-gyl66f-116001001-000030
|
|
Project Title |
Construction of 2-Units of Soldiers Quarters at Guards Brigade Barracks, Abuja 1
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
1,100,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
15,479,913.36
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 488 |
| |
OCID |
ocds-gyl66f-116001001-000031
|
|
Project Title |
Construction of 3 Units of 10-Family CBQ at Guards Brigade Barracks Abuja 1
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
1,100,000,000.00
NGN
|
|
Budget year |
2017
|
|
| |
Project Amount |
138,818,528.89
|
|
Contractor |
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 489 |
| |
OCID |
ocds-gyl66f-116001001-000178
|
|
Project Title |
HIV/AIDS PREVENTION AND MANAGEMENT (CIVILIAN CELLS) (ON-GOING)
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
10,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 490 |
| |
OCID |
ocds-gyl66f-116001001-000183
|
|
Project Title |
REVIEW AND PRODUCTION OF GENERIC GUIDELINE AND COMPILATION OF REFORM IN MOD AND ITS AGENCIES (ON-GOI
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
20,500,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 491 |
| |
OCID |
ocds-gyl66f-116001001-000187
|
|
Project Title |
JOINT CONSULTATIVE COUNCIL ON DEFENCE SCHOOLS (ON-GOING)
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
38,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 492 |
| |
OCID |
ocds-gyl66f-116001001-000188
|
|
Project Title |
ARMED FORCES REMEMBRANCE DAY CELEBRATION AND VETERAN SERVICES (ON-GOING)
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
50,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 493 |
| |
OCID |
ocds-gyl66f-116001001-000189
|
|
Project Title |
SUPPORT TO NIGERIAN LEGION
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
30,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 494 |
| |
OCID |
ocds-gyl66f-116001001-000198
|
|
Project Title |
Rehabilitation of 3 Units of 10 Family CBQ at Army Barracks, Shadawanka, Bauchi.
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
300,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
81,557,877.45
|
|
Contractor |
PAZIM ENGINEERING LTD
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
| 495 |
| |
OCID |
ocds-gyl66f-116001001-000199
|
|
Project Title |
Rehabilitation of 4 Units of 2 Bedroom (Twin) SNCO and 3 Units of MOQ (3 Bedroom Bungalow) at NAF,
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
300,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
74,158,786.34
|
|
Contractor |
SEEGNAL NIG. LTD
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 496 |
| |
OCID |
ocds-gyl66f-116001001-000200
|
|
Project Title |
Rehabilitation of 6 Units of 2 Bedroom (Twin) SNCO at NAF Kano, Kano State.
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
300,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
65,370,281.19
|
|
Contractor |
DEHANET TOWER LTD
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 497 |
| |
OCID |
ocds-gyl66f-116001001-000201
|
|
Project Title |
PROVISION OF MOMAS ELECTRICITY METERS TO MILITARY FORMATIONS (ON-GOING)
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
300,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
|
|
Contractor |
|
|
| |
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
| 498 |
| |
OCID |
ocds-gyl66f-116001001-000204
|
|
Project Title |
Construction of 1Units 2Bedroom Block of 4Flats at 177 Barracks,Keffi Nassarawa State.
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
200,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
57,038,661.40
|
|
Contractor |
JAJI M.M. NIG. LTD
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
| 499 |
| |
OCID |
ocds-gyl66f-116001001-000205
|
|
Project Title |
Construction of 1 Unit of 1 Bedroom 4 Family SOQ at 102 Barracks, Suleja.
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
300,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
45,104,679.87
|
|
Contractor |
LEEWAY SYSTEM CONCERNS LTD
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
| 500 |
| |
OCID |
ocds-gyl66f-116001001-000206
|
|
Project Title |
CONSTRUCTION OF 1 UNIT OF 14 FAMILY CBQ AT NAVY BARRACKS, EFURUN, WARRI
|
|
| |
Procurring Entity |
FEDERAL MINISTRY OF DEFENCE - MAIN MOD
|
|
|
|
| |
Budget Amount |
300,000,000.00
NGN
|
|
Budget year |
2018
|
|
| |
Project Amount |
125,832,539.13
|
|
Contractor |
M/S JABAL ADVANCE PROJECTS LIMITED
|
|
| |
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|