1 |
|
OCID |
ocds-gyl66f-232007001-000009
|
|
Project Title |
renovation of vocational and technical college, amoli, enugu state
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
47,480,642.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
47,480,642.52
|
|
Contractor |
MCJ Global
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
2 |
|
OCID |
ocds-gyl66f-232007001-000012
|
|
Project Title |
lot 4 renovation of vocational and technical college, enugu
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
53,356,276.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
|
|
| |
|
3 |
|
OCID |
ocds-gyl66f-232007001-000024
|
|
Project Title |
provision of tablets for STEM subjects for students in secondary schools across in Nigeria
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
300,000,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
4 |
|
OCID |
ocds-gyl66f-232007001-000025
|
|
Project Title |
NASS workshop
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
180,000,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
48,765,358.09
|
|
Contractor |
Usman
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
5 |
|
OCID |
ocds-gyl66f-232007001-000047
|
|
Project Title |
POLAKU PIPEMILL IMPLEMENTATION-ROAD STABILIZATION AND ACCESS ROAD
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
287,370,720.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
47,895,120.00
|
|
Contractor |
Usman
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
6 |
|
OCID |
ocds-gyl66f-232007001-000048
|
|
Project Title |
POLAKU PIPEMILL IMPLEMENTATION-CONSTRUCTION OF DRAIN/CULVERTS
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
7,881,639.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
7 |
|
OCID |
ocds-gyl66f-232007001-000057
|
|
Project Title |
CAPACITY BUILDING AND ARTISAN TRAINING-PROJECT MANAGEMENT
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
72,931,490.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
4,877,460.00
|
|
Contractor |
Jake Riley Ltd
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
8 |
|
OCID |
ocds-gyl66f-232007001-000071
|
|
Project Title |
PURCHASE OF NEW VEHICLES
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
150,000,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
47,222,222.00
|
|
Contractor |
Globe Motors
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
9 |
|
OCID |
ocds-gyl66f-232007001-000071
|
|
Project Title |
PURCHASE OF NEW VEHICLES
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
150,000,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
47,222,222.00
|
|
Contractor |
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
|
|
| |
|
10 |
|
OCID |
ocds-gyl66f-232007001-000081
|
|
Project Title |
DEVELOPMENTAL TRAINING FOR MED STAFF
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
90,000,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
11 |
|
OCID |
ocds-gyl66f-232007001-000092
|
|
Project Title |
PROCUREMENT OF COMMUNICATION TOOL/AIRTIME FOR STAFF
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
2,500,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
12 |
|
OCID |
ocds-gyl66f-232007001-000095
|
|
Project Title |
PRODUCTION OF NCDMB 10TH YEAR ANNIVERSARY BROCHURE
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
55,000,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
13 |
|
OCID |
ocds-gyl66f-232007001-000103
|
|
Project Title |
NTA SCIENCE QUIZ
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
10,000,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
5,207,000.00
|
|
Contractor |
Usman
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
14 |
|
OCID |
ocds-gyl66f-232007001-000104
|
|
Project Title |
CAPACITY BUILDING WORKSHOP FOR CSO/ADVOCACY GROUP, WOMEN IN OIL AND GAS AND MEDIA
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
130,000,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
15 |
|
OCID |
ocds-gyl66f-232007001-000120
|
|
Project Title |
UPGRADE OF SUN SYSTEMS TO VERSION 6.3
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
25,166,666.67
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
6,300,000.00
|
|
Contractor |
Infrest Nig Ltd
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
16 |
|
OCID |
ocds-gyl66f-232007001-000121
|
|
Project Title |
CONFERENCES AND SEMINARS FOR FAD STAFF
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
35,837,533.33
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
17 |
|
OCID |
ocds-gyl66f-232007001-000136
|
|
Project Title |
IMPLEMENTATION OF MICROSOFT AZURE ACTIVE DIRECTORY P2
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
16,000,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
18 |
|
OCID |
ocds-gyl66f-232007001-000137
|
|
Project Title |
UPGRADE AND RENEWAL OF AVAST ANTI-VIRUS
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
3,500,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
19 |
|
OCID |
ocds-gyl66f-232007001-000154
|
|
Project Title |
ORACLE DATABASE SUPPORT
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
29,666,485.80
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
29,666,485.80
|
|
Contractor |
Vascon solution
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
20 |
|
OCID |
ocds-gyl66f-232007001-000155
|
|
Project Title |
TABLEAU SUPPORT PAYMENT
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
8,000,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
14,784,000.00
|
|
Contractor |
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
21 |
|
OCID |
ocds-gyl66f-232007001-000162
|
|
Project Title |
ENGAGEMENT OF CONSULTANT FOR THE HOSTING OF SPECIALISED TRAINING, R & D, LABORATORY, MUSEUM, INCUBAT
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
56,000,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
22 |
|
OCID |
ocds-gyl66f-232007001-000163
|
|
Project Title |
LINKING THE INDUSTRY WITH STEM FACULTIES IN UNIVERSITIES
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
25,000,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
23 |
|
OCID |
ocds-gyl66f-252047001-000051
|
|
Project Title |
Construction of Examination Hall in Gombe South Senatorial District, Gombe State.
|
|
|
Procurring Entity |
UPPER BENUE RBDA
|
|
|
|
|
Budget Amount |
15,000,000.00
NGN
|
|
Budget year |
2017
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
24 |
|
OCID |
ocds-gyl66f-252047001-000052
|
|
Project Title |
Construction of 1 No. Block of three Classrooms in Gombe South Senatorial District, Gombe State (A)
|
|
|
Procurring Entity |
UPPER BENUE RBDA
|
|
|
|
|
Budget Amount |
11,809,534.52
NGN
|
|
Budget year |
2017
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
25 |
|
OCID |
ocds-gyl66f-232007001-000191
|
|
Project Title |
ENGAGMENT OF CONSULTANT FOR HOSTING OF SPECIALISED TRAINING, R & D, LABORATORY, MUSEUM, INCUBATION H
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
120,000,000.00
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
26 |
|
OCID |
ocds-gyl66f-232007001-000207
|
|
Project Title |
NTA SCIENCE QUIZ
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
10,000,000.00
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
27 |
|
OCID |
ocds-gyl66f-232007001-000208
|
|
Project Title |
CAPACITY BUILDING WORKSHOP FOR CSO/ADVOCACY GROUP, WOMEN IN OIL AND GAS AND MEDIA
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
130,000,000.00
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
28 |
|
OCID |
ocds-gyl66f-232007001-000231
|
|
Project Title |
STAFF WELFARE PROGRAMME
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
290,000,000.00
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
95,066,561.00
|
|
Contractor |
AlphaSeven Solutions
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
29 |
|
OCID |
ocds-gyl66f-232007001-000232
|
|
Project Title |
CUSTOMER SERVICE WEEK EVENT
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
290,000,000.00
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
30 |
|
OCID |
ocds-gyl66f-227001001-000034
|
|
Project Title |
Procurement and Installation of Document Management and Archiving System for Procurement Department
|
|
|
Procurring Entity |
FEDERAL MINISTRY OF LABOUR AND EMPLOYMENT - HQTRS
|
|
|
|
|
Budget Amount |
2,005,878,067.00
NGN
|
|
Budget year |
2018
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
31 |
|
OCID |
ocds-gyl66f-517021032-000002
|
|
Project Title |
CONSTRUCTION OF ART THEATER/EXISTING EXTERNAL WORKS
|
|
|
Procurring Entity |
ALEX EKWUEME FEDERAL UNIVERSITY, NDUFU-ALIKE IKWO
|
|
|
|
|
Budget Amount |
1,500,000,000.00
NGN
|
|
Budget year |
2018
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
32 |
|
OCID |
ocds-gyl66f-517021030-000001
|
|
Project Title |
CONSTRUCTION OF CHANCELLOR’S BUILDING
|
|
|
Procurring Entity |
FEDERAL UNIVERSITY OTUOKE
|
|
|
|
|
Budget Amount |
2,000,000,000.00
NGN
|
|
Budget year |
2018
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
33 |
|
OCID |
ocds-gyl66f-517021030-000002
|
|
Project Title |
CONSTRUCTION OF FACULTY BUILDING TYPE A
|
|
|
Procurring Entity |
FEDERAL UNIVERSITY OTUOKE
|
|
|
|
|
Budget Amount |
2,000,000,000.00
NGN
|
|
Budget year |
2018
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
34 |
|
OCID |
ocds-gyl66f-451002001-000183
|
|
Project Title |
Sandfillind / reclamation of kalafiogbene Community Bomadi LGA delta (lot 1-10)
|
|
|
Procurring Entity |
NIGER DELTA DEVELOPMENT COMMISSION
|
|
|
|
|
Budget Amount |
2,500,000,000.00
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
35 |
|
OCID |
ocds-gyl66f-451002001-000186
|
|
Project Title |
Various canalization projects above N500m
|
|
|
Procurring Entity |
NIGER DELTA DEVELOPMENT COMMISSION
|
|
|
|
|
Budget Amount |
1,000,000,000.00
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
36 |
|
OCID |
ocds-gyl66f-232007001-000245
|
|
Project Title |
LICENCE RENEWAL (RENEWAL OF WEB HOSTING AND SSL STAT ANALYTICS)
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
7,916,666.67
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
5,340,600.00
|
|
Contractor |
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
37 |
|
OCID |
ocds-gyl66f-232007001-000002
|
|
Project Title |
sensitization programme
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
4,725,184,966.48
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
50,000,000.00
|
|
Contractor |
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
38 |
|
OCID |
ocds-gyl66f-232007001-000004
|
|
Project Title |
ITF vocational training
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
3,335,632,067.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
39 |
|
OCID |
ocds-gyl66f-232007001-000031
|
|
Project Title |
phase 2 of SMART electrical training for 50 electrical engineers
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
49,481,691.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
40 |
|
OCID |
ocds-gyl66f-232007001-000035
|
|
Project Title |
HQ building project for establishment of sickbay, achives, physical library, etc
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
60,312,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
41 |
|
OCID |
ocds-gyl66f-232007001-000037
|
|
Project Title |
HQ building project for relocation readiness activities
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
410,000,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
49,329,000.00
|
|
Contractor |
Usman
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
42 |
|
OCID |
ocds-gyl66f-220002001-000039
|
|
Project Title |
Other Services General
|
|
|
Procurring Entity |
DEBT MANAGEMENT OFFICE
|
|
|
|
|
Budget Amount |
16,680,000.00
NGN
|
|
Budget year |
2018
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
43 |
|
OCID |
ocds-gyl66f-232007001-000062
|
|
Project Title |
CAPACITY BUILDING FOR UPGRADE WOODWORK AND CARPENTRY WORKSHOP IN ABAK
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
200,000,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
247,696,453.04
|
|
Contractor |
Megastar Tech & Const. Com Ltd
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
44 |
|
OCID |
ocds-gyl66f-232007001-000068
|
|
Project Title |
PROCUREMENT OF FIRE FIGHTING TRUCK
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
500,000,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
419,111,847.00
|
|
Contractor |
Konek Investment & Service Ltd
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
45 |
|
OCID |
ocds-gyl66f-232007001-000069
|
|
Project Title |
STATIONERY AND CONFECTIONERY
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
100,000,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
0.00
|
|
Contractor |
ESBI Enterprises Nig Ltd
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
46 |
|
OCID |
ocds-gyl66f-232007001-000069
|
|
Project Title |
STATIONERY AND CONFECTIONERY
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
100,000,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
4,852,625.04
|
|
Contractor |
ESBI Enterprises Nig Ltd
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
|
|
| |
|
47 |
|
OCID |
ocds-gyl66f-232007001-000074
|
|
Project Title |
RENOVATION OF ONOPA AND OPOLO BUILDINGS
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
7,291,660.70
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
4,267,920.00
|
|
Contractor |
Kinetic Electromechanic Nig Ltd
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
48 |
|
OCID |
ocds-gyl66f-232007001-000075
|
|
Project Title |
RENEWAL OF THIRD PARTY MONITORING SERVICES CONTRACTS AND ENGAGEMENTS OF ADDITIONAL THIRD PARTY MONIT
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
500,000,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
349,993,000.00
|
|
Contractor |
NG Content Future Concept, Camp & Pride, Omega OPG, Foisi Global, MultiOil, Pricewaterhousecoopers and KPMG
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
49 |
|
OCID |
ocds-gyl66f-232007001-000090
|
|
Project Title |
STAKEHOLDER ENGAGEMENT AND END OF YEAR ACTIVITIES
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
70,000,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
50 |
|
OCID |
ocds-gyl66f-232007001-000091
|
|
Project Title |
TRAINING FOR STAFF FOR THE YEAR
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
810,000,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
51 |
|
OCID |
ocds-gyl66f-232007001-000096
|
|
Project Title |
RADIO JINGLE AND PUBLICITY
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
45,000,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
52 |
|
OCID |
ocds-gyl66f-232007001-000115
|
|
Project Title |
PUBLICATION OF SPECIAL REPORTS
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
25,000,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
53 |
|
OCID |
ocds-gyl66f-232007001-000118
|
|
Project Title |
CAPACITY BUILDING FOR STAFF OF FAD
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
200,000,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
54 |
|
OCID |
ocds-gyl66f-232007001-000123
|
|
Project Title |
PURCHASE OF 2 HP PAVILION LAPTOPS AND 8 HP DESKTOPS FOR FAD STAFF
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
4,100,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
55 |
|
OCID |
ocds-gyl66f-232007001-000132
|
|
Project Title |
ENTERPRISE CLASS DATA PROTECTION IMPLEMENTATION
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
10,000,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
56 |
|
OCID |
ocds-gyl66f-232007001-000134
|
|
Project Title |
UPGRADE OF MICROSOFT OFFICE FROM E1 TO E3
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
40,000,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
32,705,592.19
|
|
Contractor |
Descasio Ltd
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
57 |
|
OCID |
ocds-gyl66f-232007001-000139
|
|
Project Title |
10MBPS WAN LINK FROM MAINONE DATACENTER TO ABUJA DR
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
8,000,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Tender Stage
|
|
Status |
|
|
| |
|
58 |
|
OCID |
ocds-gyl66f-232007001-000141
|
|
Project Title |
COLLOCATION RENEWAL
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
15,000,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
59 |
|
OCID |
ocds-gyl66f-232007001-000169
|
|
Project Title |
SET UP AND OPERATE PROJECT MANAGEMENT OFFICE FOR PROJECT 100
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
500,000,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
60 |
|
OCID |
ocds-gyl66f-232007001-000171
|
|
Project Title |
PUBLISH AND COMMUNICATE COMMERCIAL VENTURES INTERVENTIONGUIDE HANDBOOK TO STAKEHOLDERS
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
10,000,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
61 |
|
OCID |
ocds-gyl66f-521027040-000003
|
|
Project Title |
PROCUREMENT OF UTILITY VEHICLES
|
|
|
Procurring Entity |
NATIONAL EAR CARE CENTRE KADUNA
|
|
|
|
|
Budget Amount |
34,000,000.00
NGN
|
|
Budget year |
2018
|
|
|
Project Amount |
29,909,250.00
|
|
Contractor |
GLOBE MOTORS
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
|
|
| |
|
62 |
|
OCID |
ocds-gyl66f-252047001-000046
|
|
Project Title |
(E)Drilling and Installation of 10 Nos. Hand Pump Boreholes in Selected Locations in Yamaltu Deba Fe
|
|
|
Procurring Entity |
UPPER BENUE RBDA
|
|
|
|
|
Budget Amount |
10,000,000.00
NGN
|
|
Budget year |
2017
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
63 |
|
OCID |
ocds-gyl66f-252047001-000048
|
|
Project Title |
(B)Drilling of 150 Nos. Tube wells and Procurement of 150 Nos. 2" Water Pumps in Gombe North Senator
|
|
|
Procurring Entity |
UPPER BENUE RBDA
|
|
|
|
|
Budget Amount |
19,000,000.00
NGN
|
|
Budget year |
2017
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
64 |
|
OCID |
ocds-gyl66f-252047001-000053
|
|
Project Title |
Construction of 1 No. Block of Three Classrooms in Gombe South Senatorial District, Gombe State (B)
|
|
|
Procurring Entity |
UPPER BENUE RBDA
|
|
|
|
|
Budget Amount |
11,809,534.52
NGN
|
|
Budget year |
2017
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
65 |
|
OCID |
ocds-gyl66f-232007001-000201
|
|
Project Title |
DEVELOPMENT/PUBLICATION OF BESPOKE ADVERT FOR NCDMB FLAGSHIP PROJECT
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
45,000,000.00
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
66 |
|
OCID |
ocds-gyl66f-232007001-000203
|
|
Project Title |
NCDMB RADIO PROGRAMME
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
40,000,000.00
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
67 |
|
OCID |
ocds-gyl66f-232007001-000210
|
|
Project Title |
ANNUAL NC UNDERGRADUATE ESSAY COMPETITION COVERING PRE AND POST PUBLICITY, PRIZES, ACCESSORIES ETC
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
41,000,000.00
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
40,077,990.00
|
|
Contractor |
MAHOGANY CENTURY CONCEPTS LIMITED
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
68 |
|
OCID |
ocds-gyl66f-232007001-000212
|
|
Project Title |
PRODUCTION OF LOCAL CONTENT DIRECTORY
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
25,000,000.00
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
69 |
|
OCID |
ocds-gyl66f-232007001-000227
|
|
Project Title |
HUMAN RESOURCE FORUM
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
290,000,000.00
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
70 |
|
OCID |
ocds-gyl66f-232007001-000229
|
|
Project Title |
HUMAN RESOURCE PROJECT
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
1,005,000,000.00
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
71 |
|
OCID |
ocds-gyl66f-232007001-000236
|
|
Project Title |
AUTOMATION OF WORK PROCESSES
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
262,000,000.00
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
12,442,500.00
|
|
Contractor |
VIABLE TECHNOLOGIES LIMITED
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
|
|
| |
|
72 |
|
OCID |
ocds-gyl66f-232007001-000006
|
|
Project Title |
Nigeria oil and gas technology hackathon
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
47,100,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
73 |
|
OCID |
ocds-gyl66f-232007001-000013
|
|
Project Title |
extra fencing and renovation of vocational and technical college
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
43,503,324.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
43,503,324.36
|
|
Contractor |
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
74 |
|
OCID |
ocds-gyl66f-232007001-000014
|
|
Project Title |
renovation of vocational and technical colleg, abak, akwa ibom lot 1
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
247,696,453.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
247,696,453.04
|
|
Contractor |
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
75 |
|
OCID |
ocds-gyl66f-232007001-000017
|
|
Project Title |
training workshop for teachers of science,basic technology and technical/vocational craft in seconda
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
35,000,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
76 |
|
OCID |
ocds-gyl66f-232007001-000019
|
|
Project Title |
Human Capital Development
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
45,000,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
43,311,580.00
|
|
Contractor |
Greenfields Consultancy and Allied Services Limited
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
77 |
|
OCID |
ocds-gyl66f-232007001-000029
|
|
Project Title |
phase 2 for sea time training of 20 nigerian cadets on foreign going vessels
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
230,000,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
78 |
|
OCID |
ocds-gyl66f-232007001-000030
|
|
Project Title |
geoscience training
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
344,000,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
79 |
|
OCID |
ocds-gyl66f-232007001-000039
|
|
Project Title |
Nigerian oil and gas parks for fence construction
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
630,000,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
13,029,789.63
|
|
Contractor |
Allied Consultants Limited
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
80 |
|
OCID |
ocds-gyl66f-232007001-000040
|
|
Project Title |
NIGERIAN OIL AND GAS PARKS-SAND/LATERITE FILLING (AKS,BYS,IMS,EDS)
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
965,499,895.80
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
59,583,638.10
|
|
Contractor |
MegaStar Construction and Technical Services
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
81 |
|
OCID |
ocds-gyl66f-232007001-000050
|
|
Project Title |
POLAKU PIPEMILL IMPLEMENTATION-CONSTRUCTION OF PERIMETER FENCE
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
208,333,333,333.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
197,181,773.41
|
|
Contractor |
Usman
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
82 |
|
OCID |
ocds-gyl66f-232007001-000051
|
|
Project Title |
POLAKU PIPEMILL IMPLEMENTATION-PROJECT MANAGEMENT FOR CONSTRUCTION OF WATER FRONT RETENTION WALL
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
17,500,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
83 |
|
OCID |
ocds-gyl66f-232007001-000053
|
|
Project Title |
CAPACITY BUILDING AND ARTISAN TRAINING IN THE NORTH EAST
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
100,000,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
47,867,757.00
|
|
Contractor |
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
84 |
|
OCID |
ocds-gyl66f-232007001-000055
|
|
Project Title |
CAPACITY BUILDING AND ARTISANAL TRAINING-DEWORMING PROGRAMME FOR CHILDREN AND PROVISION OF HYGIENE P
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
60,000,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
85 |
|
OCID |
ocds-gyl66f-232007001-000066
|
|
Project Title |
RENT AND RENOVATION OF HQB
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
198,000,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
33,390,000.00
|
|
Contractor |
Bank of industry
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
86 |
|
OCID |
ocds-gyl66f-232007001-000067
|
|
Project Title |
RENT PAYMENT FOR VARIOUS OFFICES AND NYSC LODGE
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
45,333,333.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
7,343,700.00
|
|
Contractor |
Locke International Consultacy Ltd
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
87 |
|
OCID |
ocds-gyl66f-232007001-000088
|
|
Project Title |
SPORTS KITS FOR STAFF
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
50,000,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
88 |
|
OCID |
ocds-gyl66f-232007001-000097
|
|
Project Title |
FULL BRANDING OF NCDMB NEW HQ AND LIASON OFFICES
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
45,000,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
89 |
|
OCID |
ocds-gyl66f-232007001-000099
|
|
Project Title |
MEDIA PUBLICITY AND LIVE BROADCAST OF THE BOARDS ACTIVITIES
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
50,000,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
25,000,000.00
|
|
Contractor |
Usman
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
90 |
|
OCID |
ocds-gyl66f-232007001-000100
|
|
Project Title |
NCDMB TV LIVE EVENTS AND PROGRAMMES
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
30,000,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
10,786,550.00
|
|
Contractor |
Silverflame Media Limited
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
91 |
|
OCID |
ocds-gyl66f-232007001-000111
|
|
Project Title |
NCDMB BESPOKE SOURVENIRS AND CORPORATE GIFTS
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
25,000,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
92 |
|
OCID |
ocds-gyl66f-232007001-000113
|
|
Project Title |
TV REPORT AND BROADCAST IN LOCAL MEDIA
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
35,000,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
45,500,000.00
|
|
Contractor |
Usman
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
93 |
|
OCID |
ocds-gyl66f-232007001-000126
|
|
Project Title |
PROCUREMENT OF 3 THERMOCOOL REFRIGERATORS, 2 THERMOCOOL MICROWAVE, AND 5 WATER DISPENSERS
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
740,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
94 |
|
OCID |
ocds-gyl66f-232007001-000128
|
|
Project Title |
INTERNET BACK UP UPGRADE FOR HQB TO 70MBS
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
72,000,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
42,850,500.00
|
|
Contractor |
Mainone cable company ltd
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
95 |
|
OCID |
ocds-gyl66f-232007001-000130
|
|
Project Title |
REVIEW OF NEW DATA CENTRE BY CONSULTANT
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
3,000,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
96 |
|
OCID |
ocds-gyl66f-232007001-000143
|
|
Project Title |
2019 SUPPORT FOR NOGIC JQS
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
37,800,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
37,800,000.00
|
|
Contractor |
Vascon solution
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
97 |
|
OCID |
ocds-gyl66f-232007001-000145
|
|
Project Title |
SUPPORT FOR EXPATRIATE BIOMETRIC SYSTEM
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
2,500,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
98 |
|
OCID |
ocds-gyl66f-232007001-000167
|
|
Project Title |
CONSULTANCY SUPPORT SERVICES
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
15,000,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
35,738,250.00
|
|
Contractor |
Conegelics Consulting International Limited
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
99 |
|
OCID |
ocds-gyl66f-252047001-000042
|
|
Project Title |
Drilling and Installation of 10 Nos. Hand Pump Boreholes in Selected Locations in Yamaltu Deba Feder
|
|
|
Procurring Entity |
UPPER BENUE RBDA
|
|
|
|
|
Budget Amount |
10,000,000.00
NGN
|
|
Budget year |
2017
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
100 |
|
OCID |
ocds-gyl66f-252047001-000044
|
|
Project Title |
(C)Drilling and Installation of 10 Nos. Hand Pump Boreholes in Selected Locations in Yamaltu Deba Fe
|
|
|
Procurring Entity |
UPPER BENUE RBDA
|
|
|
|
|
Budget Amount |
10,000,000.00
NGN
|
|
Budget year |
2017
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
101 |
|
OCID |
ocds-gyl66f-252047001-000055
|
|
Project Title |
Drilling and Installation of 4 Nos. Hand Pump Boreholes in Selected Locations in Jalingo LGA, Jaling
|
|
|
Procurring Entity |
UPPER BENUE RBDA
|
|
|
|
|
Budget Amount |
6,343,229.34
NGN
|
|
Budget year |
2017
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
102 |
|
OCID |
ocds-gyl66f-232007001-000187
|
|
Project Title |
CONDUCT STATISTICAL BASELINE SURVEYS FOR DIFFERENT STUDIES
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
60,000,000.00
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Tender Stage
|
|
Status |
|
|
| |
|
103 |
|
OCID |
ocds-gyl66f-232007001-000188
|
|
Project Title |
PRINTING OF MINISTRY OF PETROLEUM RESOURCES COMMITTEE FOR COMPENDIUM OF STATISTICS
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
15,000,000.00
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
104 |
|
OCID |
ocds-gyl66f-232007001-000197
|
|
Project Title |
PRINTING OF NOGICD ACT
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
17,000,000.00
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
105 |
|
OCID |
ocds-gyl66f-232007001-000199
|
|
Project Title |
RADIO JINGLES AND PUBLICITY OF THE BOARD
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
45,000,000.00
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
106 |
|
OCID |
ocds-gyl66f-232007001-000214
|
|
Project Title |
PRODUCTION OF INTERNATIONAL TV DOCUMENTARIES
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
70,000,000.00
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
107 |
|
OCID |
ocds-gyl66f-232007001-000216
|
|
Project Title |
LOCAL CONTENT WEEKLY TV PROGRAMME
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
100,000,000.00
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
25,000,000.00
|
|
Contractor |
DON PEDRO MANAGEMNET LIMITED
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
108 |
|
OCID |
ocds-gyl66f-232007001-000223
|
|
Project Title |
STAFF AND STAKEHOLDER EVENT
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
60,000,000.00
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
46,546,650.00
|
|
Contractor |
BENLAWRENCE INVESTMENT LIMITED
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
109 |
|
OCID |
ocds-gyl66f-232007001-000225
|
|
Project Title |
HUMAN RESOURCE INFORMATION SYSTEM
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
40,000,000.00
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
43,298,850.00
|
|
Contractor |
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
110 |
|
OCID |
ocds-gyl66f-232007001-000240
|
|
Project Title |
ICT PROJECTS (PROVISION OF NEW HQ ACCESS POINTS, VIDEOCONFERENCING AND AUDIO VISUAL EQUIPMENTS)
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
73,000,000.00
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
99,047,812.45
|
|
Contractor |
IRAD GROUP
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
111 |
|
OCID |
ocds-gyl66f-232007001-000241
|
|
Project Title |
ICT PROJECTS (ICT SUPPORT AND MIANTENANCE FOR ZONAL OFFICES)
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
36,250,000.00
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
23,607,000.00
|
|
Contractor |
Viable Technologies Ltd
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
112 |
|
OCID |
ocds-gyl66f-227001001-000038
|
|
Project Title |
Expansion of MIS to Headquarters,State and Zonal Offices
|
|
|
Procurring Entity |
FEDERAL MINISTRY OF LABOUR AND EMPLOYMENT - HQTRS
|
|
|
|
|
Budget Amount |
2,005,878,067.00
NGN
|
|
Budget year |
2018
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
113 |
|
OCID |
ocds-gyl66f-451002001-000173
|
|
Project Title |
Construction of East West Agbere/Odoni Elemebiri Road, SILGA, Bayelsa
|
|
|
Procurring Entity |
NIGER DELTA DEVELOPMENT COMMISSION
|
|
|
|
|
Budget Amount |
3,500,000,000.00
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
114 |
|
OCID |
ocds-gyl66f-451002001-000175
|
|
Project Title |
Construction of Anyama Ijaw 500km Concrete Pavement Road, Silga ( Lot 1-2), Bayelsa
|
|
|
Procurring Entity |
NIGER DELTA DEVELOPMENT COMMISSION
|
|
|
|
|
Budget Amount |
600,000,000.00
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
115 |
|
OCID |
ocds-gyl66f-252047001-000064
|
|
Project Title |
Construction of erosion control drainage with surface dressing and grading of streets in Mararraban
|
|
|
Procurring Entity |
UPPER BENUE RBDA
|
|
|
|
|
Budget Amount |
118,085,261.33
NGN
|
|
Budget year |
2017
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
116 |
|
OCID |
ocds-gyl66f-232007001-000251
|
|
Project Title |
ANNUAL WAN LINK PROVISION FOR DR BACKUP OF THE NOGIC JQS
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
12,000,506.00
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
45,687,500.00
|
|
Contractor |
Vascon Solutions Ltd
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
|
|
| |
|
117 |
|
OCID |
ocds-gyl66f-232007001-000264
|
|
Project Title |
PROCUREMENT OF PORTABLE COMPUTING DEVICES
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
29,333,333.33
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
42,516,250.00
|
|
Contractor |
FORTEC INVESTMENT LIMITED
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
118 |
|
OCID |
ocds-gyl66f-232007001-000266
|
|
Project Title |
PRINTERS FOR CENTRALIZED PRINTING IN NEW HQB
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
38,166,666.67
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
35,825,993.78
|
|
Contractor |
Kampus Suite Ltd
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
119 |
|
OCID |
ocds-gyl66f-232007001-000279
|
|
Project Title |
HILUX CARRIAGE COVER
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
1,500,000.00
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
120 |
|
OCID |
ocds-gyl66f-232007001-000281
|
|
Project Title |
PROJECT VEHICLES
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
130,000,000.00
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
121 |
|
OCID |
ocds-gyl66f-232007001-000283
|
|
Project Title |
PRODUCTION AND PRINTING OF PLAQUES FOR OIL AND GAS PRODUCERS TRADE SESSION, IPPG, NLNG AND OTHER RES
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
12,000,000.00
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
122 |
|
OCID |
ocds-gyl66f-232007001-000296
|
|
Project Title |
PROCUREMENT OF VOICE AND DATA SERVICES FOR STAFF
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
32,000,000.00
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
4,928,875.00
|
|
Contractor |
LIVESTREAM COMM LIMITED
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
123 |
|
OCID |
ocds-gyl66f-232007001-000298
|
|
Project Title |
PROCURMENT OF VEHICLES INSPECTION MIRRORS AND SCANNERS FOR ZONAL OFFICES
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
10,000,000.00
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
124 |
|
OCID |
ocds-gyl66f-232007001-000313
|
|
Project Title |
RENEWAL OF THIRD PARTY MONITORING SERVICES CONTRACTS AND ENGAGEMENT OF ADDITIONAL THIRD PARTY MONITO
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
500,000,000.00
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
125 |
|
OCID |
ocds-gyl66f-451002001-000192
|
|
Project Title |
Allocations for Agric Programms/Projects below N250m as in Approved 2018 and 2019 Budget (various)
|
|
|
Procurring Entity |
NIGER DELTA DEVELOPMENT COMMISSION
|
|
|
|
|
Budget Amount |
250,000,000.00
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
126 |
|
OCID |
ocds-gyl66f-451002001-000193
|
|
Project Title |
CONSTRUCTION OF AFOR OGBE-EZEAGBOGU-NKWO MBAISE JUNCTION IN ABOR MBAISE LGA
|
|
|
Procurring Entity |
NIGER DELTA DEVELOPMENT COMMISSION
|
|
|
|
|
Budget Amount |
200,000,000.00
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
127 |
|
OCID |
ocds-gyl66f-451002001-000204
|
|
Project Title |
Erosion control at Heritage Estate, Esuk Odot, Cross River State
|
|
|
Procurring Entity |
NIGER DELTA DEVELOPMENT COMMISSION
|
|
|
|
|
Budget Amount |
250,000,000.00
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
128 |
|
OCID |
ocds-gyl66f-451002001-000205
|
|
Project Title |
Various road construction projects above N250m but below N500m
|
|
|
Procurring Entity |
NIGER DELTA DEVELOPMENT COMMISSION
|
|
|
|
|
Budget Amount |
500,000,000.00
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
129 |
|
OCID |
ocds-gyl66f-451002001-000215
|
|
Project Title |
Rehabilitation of schools in delta North.
|
|
|
Procurring Entity |
NIGER DELTA DEVELOPMENT COMMISSION
|
|
|
|
|
Budget Amount |
750,000,000.00
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
130 |
|
OCID |
ocds-gyl66f-220002001-000025
|
|
Project Title |
Materials & Supplies General
|
|
|
Procurring Entity |
DEBT MANAGEMENT OFFICE
|
|
|
|
|
Budget Amount |
4,871,965.00
NGN
|
|
Budget year |
2017
|
|
|
Project Amount |
4,871,965.00
|
|
Contractor |
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
131 |
|
OCID |
ocds-gyl66f-451002001-000526
|
|
Project Title |
Construction of Evwreni Internal Roads (Lots 1 - 3)
|
|
|
Procurring Entity |
NIGER DELTA DEVELOPMENT COMMISSION
|
|
|
|
|
Budget Amount |
750,000,000.00
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
132 |
|
OCID |
ocds-gyl66f-451002001-000540
|
|
Project Title |
Construction of Esama internal roads, (Lots 1-2), Bomadi, Delta
|
|
|
Procurring Entity |
NIGER DELTA DEVELOPMENT COMMISSION
|
|
|
|
|
Budget Amount |
250,000,000.00
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
133 |
|
OCID |
ocds-gyl66f-451002001-000542
|
|
Project Title |
Construction of Egabeti Ntan road, Cross River State
|
|
|
Procurring Entity |
NIGER DELTA DEVELOPMENT COMMISSION
|
|
|
|
|
Budget Amount |
250,000,000.00
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
134 |
|
OCID |
ocds-gyl66f-232007001-000322
|
|
Project Title |
FINANCE FAIR FOR STAKEHOLDERS IN THE OIL AND GAS INDUSTRY
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
100,000,000.00
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
135 |
|
OCID |
ocds-gyl66f-232007001-000324
|
|
Project Title |
CONSULTANCY CONTRACT FOR ADVISORY/CREDIT ANALYSIS OF APPROVED LOAN APPLICATION UNDER THE NCIFUND
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
17,200,000.00
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
26,875,000.00
|
|
Contractor |
S. B. CAPITAL PERTNERS & ADVISORY LIMITED
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
136 |
|
OCID |
ocds-gyl66f-232007001-000335
|
|
Project Title |
PROCUREMENT OF 3 THERMOCOOL REFRIGERATORS, 2 THERMOCOOL MICROWAVE, 8 BLUEGATE UPS AND 5 WATER DISPEN
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
1,125,000.00
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
137 |
|
OCID |
ocds-gyl66f-232007001-000339
|
|
Project Title |
SEA TIME TRAINING FOR 40 CADETS (PHASE 2)
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
500,000,000.00
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
149,556,525.00
|
|
Contractor |
CHARKIN MARITIME AND OFFSHORE LIMITED
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
138 |
|
OCID |
ocds-gyl66f-232007001-000340
|
|
Project Title |
SMART ELECTRICAL TRAINING FOR 50 ELECTRICAL ENGINEERS (PHASE 2)
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
150,000,000.00
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
139 |
|
OCID |
ocds-gyl66f-227001001-000004
|
|
Project Title |
Professional Training for Labour Inspection in the informal economy
|
|
|
Procurring Entity |
FEDERAL MINISTRY OF LABOUR AND EMPLOYMENT - HQTRS
|
|
|
|
|
Budget Amount |
8,722,887,939.00
NGN
|
|
Budget year |
2018
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
140 |
|
OCID |
ocds-gyl66f-220002001-000037
|
|
Project Title |
Training General
|
|
|
Procurring Entity |
DEBT MANAGEMENT OFFICE
|
|
|
|
|
Budget Amount |
23,240,409.00
NGN
|
|
Budget year |
2018
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
141 |
|
OCID |
ocds-gyl66f-232007001-000015
|
|
Project Title |
lot 2 renovation of vocational and technical college, abak, akwa ibom
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
16,978,059.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
4,877,460.00
|
|
Contractor |
Jake Riley
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
142 |
|
OCID |
ocds-gyl66f-232007001-000016
|
|
Project Title |
siemens Nigeria experimenta programme
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
10,000,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
143 |
|
OCID |
ocds-gyl66f-232007001-000023
|
|
Project Title |
phase 2 of subsea and fpso awareness training for 50 persons
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
39,000,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
31,500,000.00
|
|
Contractor |
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
144 |
|
OCID |
ocds-gyl66f-232007001-000026
|
|
Project Title |
poultry farming training for 74 youths (fleet farming)
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
200,000,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
145 |
|
OCID |
ocds-gyl66f-232007001-000036
|
|
Project Title |
HQ building project for fire fighting accessories and training
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
300,000,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
146 |
|
OCID |
ocds-gyl66f-232007001-000042
|
|
Project Title |
NIGERIAN OIL AND GAS PARKS-EXTERNAL WORKS
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
1,000,000,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
1,847,694,812.74
|
|
Contractor |
Usman
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
147 |
|
OCID |
ocds-gyl66f-232007001-000056
|
|
Project Title |
CAPACITY BUILDING AND ARTISANAL TRAINING- RESETTLEMENT OF IDPs BY BUILDING NEIGHBORHOOD COMMUNITY I
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
729,314,909.89
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
247,696,453.04
|
|
Contractor |
Megastar Technical & Construction Company Ltd
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
148 |
|
OCID |
ocds-gyl66f-232007001-000059
|
|
Project Title |
CAPACITY BUILDING COLLABORATION WITH PTDF ON STEM
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
500,000,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
149 |
|
OCID |
ocds-gyl66f-232007001-000061
|
|
Project Title |
CAPACITY BUILDING FOR UPGRADE OF WELDING AND STEEL FABRICATION WORKSHOP
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
242,573,017.18
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
150 |
|
OCID |
ocds-gyl66f-232007001-000064
|
|
Project Title |
PROCUREMENT OF AIR CONDITIONERS, TVs, AND REFRIGERATORS
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
68,000,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
5,130,300.00
|
|
Contractor |
Zealeon Plus Invt Nig Ltd
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
151 |
|
OCID |
ocds-gyl66f-232007001-000070
|
|
Project Title |
POWER MAINTENANCE FOR OFFICE AND HQ
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
100,000,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
4,852,625.04
|
|
Contractor |
Kinetic Electromechanic Nig Ltd
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
152 |
|
OCID |
ocds-gyl66f-232007001-000085
|
|
Project Title |
RENEWAL OF HMO FOR STAFF
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
110,920,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
153 |
|
OCID |
ocds-gyl66f-232007001-000109
|
|
Project Title |
ACQUISITION OF HIGH TECH CAMERAS AND ACCESSORIES
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
10,833,333.33
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
154 |
|
OCID |
ocds-gyl66f-232007001-000116
|
|
Project Title |
BROADCAST OF TV DOCUMENTARIES ON INTERNATIONAL TV PLATFORMS-CNN,BBC & BLOOMBERG
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
90,000,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
155 |
|
OCID |
ocds-gyl66f-232007001-000131
|
|
Project Title |
CONSULTANT FOR ICT POLICY REVIEW
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
10,000,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
156 |
|
OCID |
ocds-gyl66f-232007001-000142
|
|
Project Title |
UPGRADE AND RENEWAL OF MAINONE INTERNET PROVISION FROM A TOTAL OF 76MBPS TO 155MBPS TO PROVIDE FOR T
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
140,000,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
48,510,000.00
|
|
Contractor |
48,510,000
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
157 |
|
OCID |
ocds-gyl66f-232007001-000149
|
|
Project Title |
PURCHASE OF 14 HP PRINTERS FOR CENTRALIZED PRINTING ON EACH FLOOR OF THE NEW HQB
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
30,000,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
158 |
|
OCID |
ocds-gyl66f-232007001-000156
|
|
Project Title |
TABLETS AND MOBILE DEVICES FOR STAFF
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
28,000,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
11,921,700.00
|
|
Contractor |
Layer3
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
159 |
|
OCID |
ocds-gyl66f-232007001-000165
|
|
Project Title |
RESEARCH AND DEVELOPMENT FAIR AND ROUNDTABLE
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
174,499,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
160 |
|
OCID |
ocds-gyl66f-232007001-000168
|
|
Project Title |
CRITICAL DIRECT INTERVENTION FOR COMMERCIAL VENTURES WORKSHOP FOR INVESTORS
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
104,166,666.67
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
161 |
|
OCID |
ocds-gyl66f-252047001-000040
|
|
Project Title |
Construction of 2 Nos. Solar Powered Boreholes and 22.5m3 Overhead Tank in Gombe North Sen. District
|
|
|
Procurring Entity |
UPPER BENUE RBDA
|
|
|
|
|
Budget Amount |
20,000,000.00
NGN
|
|
Budget year |
2017
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
162 |
|
OCID |
ocds-gyl66f-252047001-000047
|
|
Project Title |
Drilling of 150 Nos. Tube wells and Procurement of 150 Nos. 2" Water Pumps in Gombe North Senatorial
|
|
|
Procurring Entity |
UPPER BENUE RBDA
|
|
|
|
|
Budget Amount |
19,000,000.00
NGN
|
|
Budget year |
2017
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
163 |
|
OCID |
ocds-gyl66f-252047001-000050
|
|
Project Title |
Rehabilitation of Raw Water Booster Pump and Expansion of Distribution Scheme at Nafada, Gombe State
|
|
|
Procurring Entity |
UPPER BENUE RBDA
|
|
|
|
|
Budget Amount |
52,036,264.03
NGN
|
|
Budget year |
2017
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
164 |
|
OCID |
ocds-gyl66f-232007001-000190
|
|
Project Title |
ENGAGEMENT OF RESEARCH AND DEVELOPMENT CONSULTANT
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
20,000,000.00
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
165 |
|
OCID |
ocds-gyl66f-232007001-000195
|
|
Project Title |
RESEARCH AND DEVELOPMENT DIRECT INTERVENTION PROJECTS
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
1,000,000.00
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
166 |
|
OCID |
ocds-gyl66f-232007001-000202
|
|
Project Title |
NEWSPAPER ADVERT FOR BOARD-WIDE ACTIVITIES
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
40,000,000.00
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
167 |
|
OCID |
ocds-gyl66f-232007001-000213
|
|
Project Title |
ACQUISITION OF HIGH TECH CAMERAS AND ACCESSORIES
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
10,833,333.33
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
36,896,150.00
|
|
Contractor |
Kabletech Ltd.
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
168 |
|
OCID |
ocds-gyl66f-232007001-000219
|
|
Project Title |
PUBLICATION OF SPECIAL REPORTS
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
25,000,000.00
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
169 |
|
OCID |
ocds-gyl66f-232007001-000230
|
|
Project Title |
HMO FOR NYSC/IT
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
191,760,000.00
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
3,500,000.00
|
|
Contractor |
REGENIX HEALTHCARE SERVICES
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
170 |
|
OCID |
ocds-gyl66f-232007001-000237
|
|
Project Title |
BACK UP INTERNET FOR THE NEW HQB
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
80,750,000.00
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
48,888,000.00
|
|
Contractor |
ZITRIC NIGERIA LIMITED
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
171 |
|
OCID |
ocds-gyl66f-252047001-000059
|
|
Project Title |
Installation of Solar Street Lights in Tudun Wada Grave Yard, Jalingo/Yorro/Zing Federal Constituenc
|
|
|
Procurring Entity |
UPPER BENUE RBDA
|
|
|
|
|
Budget Amount |
13,589,808.75
NGN
|
|
Budget year |
2017
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
172 |
|
OCID |
ocds-gyl66f-227001001-000036
|
|
Project Title |
Workshop/Seminar for Stakeholders in the Six (6) Zones
|
|
|
Procurring Entity |
FEDERAL MINISTRY OF LABOUR AND EMPLOYMENT - HQTRS
|
|
|
|
|
Budget Amount |
2,005,878,067.00
NGN
|
|
Budget year |
2018
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
173 |
|
OCID |
ocds-gyl66f-517021030-000003
|
|
Project Title |
CONSTRUCTION OF FACULTY BUILDING TYPE B
|
|
|
Procurring Entity |
FEDERAL UNIVERSITY OTUOKE
|
|
|
|
|
Budget Amount |
2,000,000,000.00
NGN
|
|
Budget year |
2018
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
174 |
|
OCID |
ocds-gyl66f-451002001-000169
|
|
Project Title |
Construction of Nembe City Central Drainage System Phase 1 Ogbolomambiri/ Bassambiri Nembe Bayelsa.
|
|
|
Procurring Entity |
NIGER DELTA DEVELOPMENT COMMISSION
|
|
|
|
|
Budget Amount |
400,000,000.00
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
175 |
|
OCID |
ocds-gyl66f-232007001-000238
|
|
Project Title |
ICT PROJECTS (ADDITIONAL BUSINESS IMPROVEMENT APPLICATION)
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
39,580,000.00
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
176 |
|
OCID |
ocds-gyl66f-227001001-000035
|
|
Project Title |
purchase of Office Equipment( Computers, Printer, Photocopiers and Air Condition
|
|
|
Procurring Entity |
FEDERAL MINISTRY OF LABOUR AND EMPLOYMENT - HQTRS
|
|
|
|
|
Budget Amount |
3,794,024,017.00
NGN
|
|
Budget year |
2018
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
177 |
|
OCID |
ocds-gyl66f-517021032-000001
|
|
Project Title |
CONSTRUCTION OF COLLEGE OF MEDICINE
|
|
|
Procurring Entity |
ALEX EKWUEME FEDERAL UNIVERSITY, NDUFU-ALIKE IKWO
|
|
|
|
|
Budget Amount |
1,500,000,000.00
NGN
|
|
Budget year |
2018
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
178 |
|
OCID |
ocds-gyl66f-517021030-000004
|
|
Project Title |
CONSTRUCTION OF LECTURE THEATER B (WITHOUT GALLERY)
|
|
|
Procurring Entity |
FEDERAL UNIVERSITY OTUOKE
|
|
|
|
|
Budget Amount |
2,000,000,000.00
NGN
|
|
Budget year |
2018
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
179 |
|
OCID |
ocds-gyl66f-517021030-000006
|
|
Project Title |
CONSTRUCTION OF EXTENDED EXTERNAL WORKS
|
|
|
Procurring Entity |
FEDERAL UNIVERSITY OTUOKE
|
|
|
|
|
Budget Amount |
2,000,000,000.00
NGN
|
|
Budget year |
2018
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
180 |
|
OCID |
ocds-gyl66f-451002001-000177
|
|
Project Title |
Construction of Niger Delta University Internal Roads(lots1-2), Amassoma SILGA Bayelsa
|
|
|
Procurring Entity |
NIGER DELTA DEVELOPMENT COMMISSION
|
|
|
|
|
Budget Amount |
250,000,000.00
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
181 |
|
OCID |
ocds-gyl66f-451002001-000179
|
|
Project Title |
Procurement of 32 Slide for CT Scan Machine with Accessories *8 Nos Doppler Ultra-Scan Machine and 8
|
|
|
Procurring Entity |
NIGER DELTA DEVELOPMENT COMMISSION
|
|
|
|
|
Budget Amount |
250,000,000.00
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
182 |
|
OCID |
ocds-gyl66f-232007001-000252
|
|
Project Title |
HOSTING OF THE NOGIC JQS SERVERS
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
23,750,000.00
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
183 |
|
OCID |
ocds-gyl66f-232007001-000254
|
|
Project Title |
INFRASTRUCTURE BY MAINONE (NEW HQ FIBRE BACKBONE IMPLEMENTATION)
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
160,000,000.00
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
13,416,000.00
|
|
Contractor |
MAINONE CABLE COMPANY NIGERIA LIMITED
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
184 |
|
OCID |
ocds-gyl66f-232007001-000258
|
|
Project Title |
NOGIC JQS CHANGES AND MODIFICATION
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
30,666,666.67
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
185 |
|
OCID |
ocds-gyl66f-232007001-000260
|
|
Project Title |
BACK UP STAORAGE FOR NOGIC JQS
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
875,000.00
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
186 |
|
OCID |
ocds-gyl66f-232007001-000285
|
|
Project Title |
CAPACITY BUILDING TRAININGS
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
30,000,000.00
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
35,009,295.47
|
|
Contractor |
AFRIBASED PROJECTS LIMITED
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
187 |
|
OCID |
ocds-gyl66f-232007001-000287
|
|
Project Title |
PROCUREMENT OF STATIONARIES
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
35,000,000.00
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
4,631,262.05
|
|
Contractor |
ESBI Enterprises Nig Ltd
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
188 |
|
OCID |
ocds-gyl66f-232007001-000292
|
|
Project Title |
PROCUREMENT OF PROTOCOL SERVICES
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
10,424,000.00
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
189 |
|
OCID |
ocds-gyl66f-232007001-000294
|
|
Project Title |
PROCUREMENT OF HOTEL SERVICES
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
235,000,000.00
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
190 |
|
OCID |
ocds-gyl66f-232007001-000315
|
|
Project Title |
RETREAT FOR NIGERIAN CONTENT MANAGERS
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
40,000,000.00
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
5,600,000.00
|
|
Contractor |
Greenfield Consultancy and Allied Services Ltd
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
191 |
|
OCID |
ocds-gyl66f-232007001-000316
|
|
Project Title |
CREATION OF ONLINE PORTAL FOR MED DATA COLLATION AND REPORTING
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
10,000,000.00
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
192 |
|
OCID |
ocds-gyl66f-451002001-000196
|
|
Project Title |
CONSTRUCTION OF UMUEZUTA-UMUOKANNE ROAD (PHRASE 1) 2KM
|
|
|
Procurring Entity |
NIGER DELTA DEVELOPMENT COMMISSION
|
|
|
|
|
Budget Amount |
300,000,000.00
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
193 |
|
OCID |
ocds-gyl66f-451002001-000201
|
|
Project Title |
Provision of Starter pack and Capital for Trained Youths/Women on Agro Based Machines (Repented oil
|
|
|
Procurring Entity |
NIGER DELTA DEVELOPMENT COMMISSION
|
|
|
|
|
Budget Amount |
600,000,000.00
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
194 |
|
OCID |
ocds-gyl66f-451002001-000202
|
|
Project Title |
CONSTRUCTION OF EKE ATTA-AMAWO-EKE OHA OGWA LINK ROAD IKEDURU/MBAITOLI (PHRASE 1)
|
|
|
Procurring Entity |
NIGER DELTA DEVELOPMENT COMMISSION
|
|
|
|
|
Budget Amount |
300,000,000.00
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
195 |
|
OCID |
ocds-gyl66f-451002001-000218
|
|
Project Title |
AKOKWA-ARO NDIZUOGU-OKIGWE ROAD (LOTS 1-6)
|
|
|
Procurring Entity |
NIGER DELTA DEVELOPMENT COMMISSION
|
|
|
|
|
Budget Amount |
1,500,000,000.00
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
196 |
|
OCID |
ocds-gyl66f-451002001-000220
|
|
Project Title |
Construction of 2No x 250 Capacity Hostel at Delta State Polytechnic, Ozoro ( Lot 1-2)
|
|
|
Procurring Entity |
NIGER DELTA DEVELOPMENT COMMISSION
|
|
|
|
|
Budget Amount |
500,000,000.00
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
197 |
|
OCID |
ocds-gyl66f-451002001-000223
|
|
Project Title |
NKWO ELEH-UMUDURU AMIRI ROAD
|
|
|
Procurring Entity |
NIGER DELTA DEVELOPMENT COMMISSION
|
|
|
|
|
Budget Amount |
500,000,000.00
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
198 |
|
OCID |
ocds-gyl66f-220002001-000026
|
|
Project Title |
Financial Consulting
|
|
|
Procurring Entity |
DEBT MANAGEMENT OFFICE
|
|
|
|
|
Budget Amount |
3,200,000.00
NGN
|
|
Budget year |
2017
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
199 |
|
OCID |
ocds-gyl66f-451002001-000527
|
|
Project Title |
Construction of Oyibo street internal road (2km) Eneberi layout,Uwvie, Delta
|
|
|
Procurring Entity |
NIGER DELTA DEVELOPMENT COMMISSION
|
|
|
|
|
Budget Amount |
250,000,000.00
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
200 |
|
OCID |
ocds-gyl66f-451002001-000529
|
|
Project Title |
Construction of Chief Fidelis street off Polytechnic road, Bomadi, Delta
|
|
|
Procurring Entity |
NIGER DELTA DEVELOPMENT COMMISSION
|
|
|
|
|
Budget Amount |
250,000,000.00
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
201 |
|
OCID |
ocds-gyl66f-451002001-000536
|
|
Project Title |
Solar powered street light in Afaha Ekpenedi/Etebi roads and environs (Lots 1-2)
|
|
|
Procurring Entity |
NIGER DELTA DEVELOPMENT COMMISSION
|
|
|
|
|
Budget Amount |
350,000,000.00
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
202 |
|
OCID |
ocds-gyl66f-451002001-000538
|
|
Project Title |
Construction of Unenurhie Internal Road (Lots 1 - 2)
|
|
|
Procurring Entity |
NIGER DELTA DEVELOPMENT COMMISSION
|
|
|
|
|
Budget Amount |
500,000,000.00
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
203 |
|
OCID |
ocds-gyl66f-252047001-000070
|
|
Project Title |
Drilling and Installation of 4 Nos. Hand Pump Boreholes and Conversion of 1 No. Motorised Borehole t
|
|
|
Procurring Entity |
UPPER BENUE RBDA
|
|
|
|
|
Budget Amount |
10,420,190.55
NGN
|
|
Budget year |
2017
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
204 |
|
OCID |
ocds-gyl66f-451002001-000004
|
|
Project Title |
construction of internals road (concrete pavement ) at nembe Bassambiri (lot 1-2)
|
|
|
Procurring Entity |
NIGER DELTA DEVELOPMENT COMMISSION
|
|
|
|
|
Budget Amount |
175,000,000.00
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
205 |
|
OCID |
ocds-gyl66f-451002001-000005
|
|
Project Title |
PROVISION OF SOLAR STREET LIGHT IN IKEDURU LGA
|
|
|
Procurring Entity |
NIGER DELTA DEVELOPMENT COMMISSION
|
|
|
|
|
Budget Amount |
250,000,000.00
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
206 |
|
OCID |
ocds-gyl66f-232007001-000336
|
|
Project Title |
PROCUREMENT OF K-YAN EDUCATIONAL TEACHING AIDS FOR SECONDARY SCHOOLS
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
300,000,000.00
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
207 |
|
OCID |
ocds-gyl66f-227001001-000005
|
|
Project Title |
Upgrade of Employment Exchange to Job Centres in all 36 States of the Federation and FCT
|
|
|
Procurring Entity |
FEDERAL MINISTRY OF LABOUR AND EMPLOYMENT - HQTRS
|
|
|
|
|
Budget Amount |
2,005,878,067.00
NGN
|
|
Budget year |
2018
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
208 |
|
OCID |
ocds-gyl66f-227001001-000008
|
|
Project Title |
Construction of Bungalow Skills Acquisition Centre at Abakaliki, Eboyi State
|
|
|
Procurring Entity |
FEDERAL MINISTRY OF LABOUR AND EMPLOYMENT - HQTRS
|
|
|
|
|
Budget Amount |
500,420,000.00
NGN
|
|
Budget year |
2018
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
209 |
|
OCID |
ocds-gyl66f-227001001-000024
|
|
Project Title |
Development of IEC Materials on Licensing of Private Employment Agencies
|
|
|
Procurring Entity |
FEDERAL MINISTRY OF LABOUR AND EMPLOYMENT - HQTRS
|
|
|
|
|
Budget Amount |
2,005,878,067.00
NGN
|
|
Budget year |
2018
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
210 |
|
OCID |
ocds-gyl66f-252047001-000063
|
|
Project Title |
Construction/Drainages of access road from Local Govt. Lodges to Main Road – Wukari /Ibbi Road, Wuka
|
|
|
Procurring Entity |
UPPER BENUE RBDA
|
|
|
|
|
Budget Amount |
84,421,708.93
NGN
|
|
Budget year |
2017
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
211 |
|
OCID |
ocds-gyl66f-232007001-000253
|
|
Project Title |
INFRASTRUCTURE BY MAINONE
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
61,666,666.67
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
49,665,000.00
|
|
Contractor |
MAINONE CABLE COMPANY NIGERIA LIMITED
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
212 |
|
OCID |
ocds-gyl66f-232007001-000259
|
|
Project Title |
EXPATRIATE BIOMETRIC SYSTEM SUPPORT
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
1,166,666.67
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
213 |
|
OCID |
ocds-gyl66f-232007001-000270
|
|
Project Title |
PORTABLE LAPTOPS FOR STAFF (REPLACEMENTS & NEW ISSUE)
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
8,750,000.00
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
32,843,722.50
|
|
Contractor |
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
214 |
|
OCID |
ocds-gyl66f-232007001-000277
|
|
Project Title |
OIL AND GAS VOCATIONAL TRAINING
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
270,000,000.00
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
215 |
|
OCID |
ocds-gyl66f-232007001-000284
|
|
Project Title |
PROCUREMENT OF OPERATIONAL VEHICLE
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
23,000,000.00
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
216 |
|
OCID |
ocds-gyl66f-232007001-000295
|
|
Project Title |
PROCUREMENT OF MOBILE DEVICES FOR ESSENTIAL STAFF
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
30,007,000.00
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
29,969,065.00
|
|
Contractor |
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
217 |
|
OCID |
ocds-gyl66f-232007001-000302
|
|
Project Title |
PROCUREMENT OF AIR CONDITIONERS, TVs, AND REFRIGERATORS
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
80,000,000.00
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
15,373,575.00
|
|
Contractor |
Variezone Marine Services
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
218 |
|
OCID |
ocds-gyl66f-232007001-000309
|
|
Project Title |
PROCUREMENT OF HILUX CARRIAGE COVER
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
1,000,000.00
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
22,339,500.00
|
|
Contractor |
Elizade Nig Ltd
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
219 |
|
OCID |
ocds-gyl66f-232007001-000317
|
|
Project Title |
TRAINING OF ALL STAFF ON SERVICOM/MARINE VESSEL CATEGORIZATION
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
56,000,000.00
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
220 |
|
OCID |
ocds-gyl66f-451002001-000188
|
|
Project Title |
Various energy and power supply projects below N250m
|
|
|
Procurring Entity |
NIGER DELTA DEVELOPMENT COMMISSION
|
|
|
|
|
Budget Amount |
250,000,000.00
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
221 |
|
OCID |
ocds-gyl66f-451002001-000194
|
|
Project Title |
construction of School of Medical Sciences, Western Delta University, Oghara, Ethiope west LGA, Delt
|
|
|
Procurring Entity |
NIGER DELTA DEVELOPMENT COMMISSION
|
|
|
|
|
Budget Amount |
1,000,000,000.00
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
222 |
|
OCID |
ocds-gyl66f-451002001-000207
|
|
Project Title |
EKE OKIGWE UMUZEGEM UMUOTUKWU RING ROAD 2KM
|
|
|
Procurring Entity |
NIGER DELTA DEVELOPMENT COMMISSION
|
|
|
|
|
Budget Amount |
250,000,000.00
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
223 |
|
OCID |
ocds-gyl66f-451002001-000212
|
|
Project Title |
CONTINGENCY PROVISION FOR ROAD REPAIRS IN SOME SELECTED AREAS
|
|
|
Procurring Entity |
NIGER DELTA DEVELOPMENT COMMISSION
|
|
|
|
|
Budget Amount |
2,500,000,000.00
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
224 |
|
OCID |
ocds-gyl66f-451002001-000219
|
|
Project Title |
Various jetty and shore protection projects below N250m
|
|
|
Procurring Entity |
NIGER DELTA DEVELOPMENT COMMISSION
|
|
|
|
|
Budget Amount |
250,000,000.00
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
225 |
|
OCID |
ocds-gyl66f-220002001-000022
|
|
Project Title |
Other services general
|
|
|
Procurring Entity |
DEBT MANAGEMENT OFFICE
|
|
|
|
|
Budget Amount |
16,130,981.00
NGN
|
|
Budget year |
2017
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
226 |
|
OCID |
ocds-gyl66f-451002001-000523
|
|
Project Title |
Construction Of Emojita Street In Aragba Orogun, Ughelli North, Delta
|
|
|
Procurring Entity |
NIGER DELTA DEVELOPMENT COMMISSION
|
|
|
|
|
Budget Amount |
250,000,000.00
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
227 |
|
OCID |
ocds-gyl66f-451002001-000528
|
|
Project Title |
Solar Light at Abonnema main road
|
|
|
Procurring Entity |
NIGER DELTA DEVELOPMENT COMMISSION
|
|
|
|
|
Budget Amount |
250,000,000.00
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
228 |
|
OCID |
ocds-gyl66f-451002001-000535
|
|
Project Title |
Construction of 3km internal roads in Okerenkoko town,Warri South West, Delta
|
|
|
Procurring Entity |
NIGER DELTA DEVELOPMENT COMMISSION
|
|
|
|
|
Budget Amount |
250,000,000.00
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
229 |
|
OCID |
ocds-gyl66f-451002001-000546
|
|
Project Title |
Construction of Bebuabie - Bewatsuan Road with a spur to Kakun inclusive side drains, Cross River St
|
|
|
Procurring Entity |
NIGER DELTA DEVELOPMENT COMMISSION
|
|
|
|
|
Budget Amount |
500,000,000.00
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
230 |
|
OCID |
ocds-gyl66f-232007001-000321
|
|
Project Title |
PREPARATION FOR PRE-NOGOF AND NOGOF 2021
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
85,000,000.00
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
231 |
|
OCID |
ocds-gyl66f-232007001-000326
|
|
Project Title |
ENGAGEMENT OF ACCOUNTING FIRMS FOR FORENSIC AUDIT PHASE 2
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
126,562,500.00
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
232 |
|
OCID |
ocds-gyl66f-252047001-000074
|
|
Project Title |
Rehabilitation of Drilling Rig and Accessories at Headquarters, Yola, Adamawa State.
|
|
|
Procurring Entity |
UPPER BENUE RBDA
|
|
|
|
|
Budget Amount |
29,425,567.50
NGN
|
|
Budget year |
2017
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
233 |
|
OCID |
ocds-gyl66f-451002001-000011
|
|
Project Title |
CONSTRUCTION OF INJECTION SUBSTATION AND ASSOCIATED TRANSMISSION LINES
|
|
|
Procurring Entity |
NIGER DELTA DEVELOPMENT COMMISSION
|
|
|
|
|
Budget Amount |
1,081,218,232.00
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
234 |
|
OCID |
ocds-gyl66f-227001001-000021
|
|
Project Title |
Fencing and landscaping of the Specialist Skills Acquisition Centre at Ifitedunu, Dunukofia LGA, Ana
|
|
|
Procurring Entity |
FEDERAL MINISTRY OF LABOUR AND EMPLOYMENT - HQTRS
|
|
|
|
|
Budget Amount |
500,420,000.00
NGN
|
|
Budget year |
2018
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
235 |
|
OCID |
ocds-gyl66f-227001001-000029
|
|
Project Title |
Creating Platform for Revenue Generation and Efficient Payment Systems for the Headquarters,State/FC
|
|
|
Procurring Entity |
FEDERAL MINISTRY OF LABOUR AND EMPLOYMENT - HQTRS
|
|
|
|
|
Budget Amount |
2,005,878,067.00
NGN
|
|
Budget year |
2018
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
236 |
|
OCID |
ocds-gyl66f-252047001-000001
|
|
Project Title |
Procurement of 200 Nos. 2” Water Pumps for Kiri/Bare Water Users Association (WUA) along Gongola Riv
|
|
|
Procurring Entity |
UPPER BENUE RBDA
|
|
|
|
|
Budget Amount |
54,250,000.00
NGN
|
|
Budget year |
2017
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
237 |
|
OCID |
ocds-gyl66f-252047001-000006
|
|
Project Title |
Dam Operations, Rehabilitation of Staff Quarters and Water Supply at Dadin Kowa Irrigation Project,
|
|
|
Procurring Entity |
UPPER BENUE RBDA
|
|
|
|
|
Budget Amount |
200,250,000.00
NGN
|
|
Budget year |
2017
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
238 |
|
OCID |
ocds-gyl66f-232007001-000394
|
|
Project Title |
CAPACITY BUILDING AND ARTISINAL TRAINING IN THE NORTH EAST FOR CHILDREN DEWORMING AND PROVISION OF H
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
865,000,000.00
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
239 |
|
OCID |
ocds-gyl66f-451002001-000560
|
|
Project Title |
Construction and Installation of 30KWP Solar Mini Grid/Hybrid System with Retrofitting of Ineffeicei
|
|
|
Procurring Entity |
NIGER DELTA DEVELOPMENT COMMISSION
|
|
|
|
|
Budget Amount |
250,000,000.00
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
240 |
|
OCID |
ocds-gyl66f-451002001-000567
|
|
Project Title |
Project related conflict management and mitigation programme
|
|
|
Procurring Entity |
NIGER DELTA DEVELOPMENT COMMISSION
|
|
|
|
|
Budget Amount |
400,000,000.00
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
241 |
|
OCID |
ocds-gyl66f-451002001-000577
|
|
Project Title |
Solar Lights for Chief Mike Loyibo internal road Azikoro village new Heaven, Yenegoa, Bayelsa
|
|
|
Procurring Entity |
NIGER DELTA DEVELOPMENT COMMISSION
|
|
|
|
|
Budget Amount |
250,000,000.00
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
242 |
|
OCID |
ocds-gyl66f-451002001-000228
|
|
Project Title |
AWO OMAMA-OKWUDOR ROAD
|
|
|
Procurring Entity |
NIGER DELTA DEVELOPMENT COMMISSION
|
|
|
|
|
Budget Amount |
750,000,000.00
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
243 |
|
OCID |
ocds-gyl66f-451002001-000238
|
|
Project Title |
Construction of Two(2) blocks of 12 lecture room each for two(2) faculties at western Delta Universi
|
|
|
Procurring Entity |
NIGER DELTA DEVELOPMENT COMMISSION
|
|
|
|
|
Budget Amount |
250,000,000.00
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
244 |
|
OCID |
ocds-gyl66f-232007001-000005
|
|
Project Title |
Nigerian oil and gas technology hackathon
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
49,900,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
245 |
|
OCID |
ocds-gyl66f-232007001-000007
|
|
Project Title |
nigerian content universities technology innovation/entrepreneurship challenge
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
99,020,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
246 |
|
OCID |
ocds-gyl66f-232007001-000018
|
|
Project Title |
project production management training for project 100
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
48,000,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
49,800,000.00
|
|
Contractor |
Usman
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
247 |
|
OCID |
ocds-gyl66f-232007001-000020
|
|
Project Title |
renovation of community primary school, okpoama, bayelsa state
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
34,216,990.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
248 |
|
OCID |
ocds-gyl66f-232007001-000028
|
|
Project Title |
phase 1 of sea time training of 20 nigerian cadets onboard foreign going vessels
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
250,000,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
249 |
|
OCID |
ocds-gyl66f-232007001-000038
|
|
Project Title |
Capacity building workshops, conferences, training and symposia
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
74,873,733.33
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
250 |
|
OCID |
ocds-gyl66f-232007001-000052
|
|
Project Title |
POLAKU PIPEMILL IMPLEMENTATION-PROJECT MANAGEMENT FOR CONSTRUCTION OF PERIMETER FENCE
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
30,000,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
197,181,773.41
|
|
Contractor |
Usman
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
251 |
|
OCID |
ocds-gyl66f-232007001-000086
|
|
Project Title |
HMO FOR NYSC
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
3,500,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
252 |
|
OCID |
ocds-gyl66f-232007001-000087
|
|
Project Title |
NIGERIAN OIL AND GAS GAMES SUBSRIBTION PAYMENT
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
4,500,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
253 |
|
OCID |
ocds-gyl66f-232007001-000098
|
|
Project Title |
BESPOKE ADVERT FOR NCDMB FLAGSHIP PROJECT
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
45,000,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
254 |
|
OCID |
ocds-gyl66f-232007001-000112
|
|
Project Title |
LOCAL CONTENT WEEKLY TV PROGRAMME
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
100,000,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
25,000,000.00
|
|
Contractor |
Usman
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
255 |
|
OCID |
ocds-gyl66f-232007001-000114
|
|
Project Title |
COMMUNICATION TO STAKEHOLDERS ON THE HQB
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
20,000,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
256 |
|
OCID |
ocds-gyl66f-232007001-000127
|
|
Project Title |
ERP IMPLEMENTATION FOR THE BOARD
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
220,000,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
257 |
|
OCID |
ocds-gyl66f-232007001-000129
|
|
Project Title |
REPLACEMENT OF BACK UP POWER INVERTERS FOR ZONAL OFFICE
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
25,000,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
28,560,000.00
|
|
Contractor |
Viable Technologies Ltd
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
258 |
|
OCID |
ocds-gyl66f-232007001-000144
|
|
Project Title |
OTHER UPGRADES ON NOGIC JQS NOT COVERED BY CONTRACT/SUPPORT
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
55,000,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
13,104,000.00
|
|
Contractor |
Mainone cable company ltd
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
259 |
|
OCID |
ocds-gyl66f-232007001-000146
|
|
Project Title |
NETAPPS SERVER SUPPORT
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
1,500,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
260 |
|
OCID |
ocds-gyl66f-252047001-000043
|
|
Project Title |
(B) Drilling and Installation of 10 Nos. Hand Pump Boreholes in Selected Locations in Yamaltu Deba F
|
|
|
Procurring Entity |
UPPER BENUE RBDA
|
|
|
|
|
Budget Amount |
10,000,000.00
NGN
|
|
Budget year |
2017
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
261 |
|
OCID |
ocds-gyl66f-252047001-000045
|
|
Project Title |
(D)Drilling and Installation of 10 Nos. Hand Pump Boreholes in Selected Locations in Yamaltu Deba Fe
|
|
|
Procurring Entity |
UPPER BENUE RBDA
|
|
|
|
|
Budget Amount |
10,000,000.00
NGN
|
|
Budget year |
2017
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
262 |
|
OCID |
ocds-gyl66f-232007001-000198
|
|
Project Title |
PRODUCTION OF NCDMB 10TH YEAR ANNIVERSARY BROCHURE
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
55,000,000.00
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
18,817,471.00
|
|
Contractor |
FOUR POINTS COMMUNICATIONS
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
263 |
|
OCID |
ocds-gyl66f-232007001-000200
|
|
Project Title |
FULL BRANDING OF NCDMB NEW HQ AND LIASON OFFICES
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
45,000,000.00
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
264 |
|
OCID |
ocds-gyl66f-232007001-000215
|
|
Project Title |
NCDMB BESPOKE SOURVENIRS AND CORPORATE GIFTS
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
25,000,000.00
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
25,208,750.00
|
|
Contractor |
ROKIT MEDIA
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
265 |
|
OCID |
ocds-gyl66f-232007001-000217
|
|
Project Title |
TV REPORT AND BROADCAST IN LOCAL MEDIA
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
35,000,000.00
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Tender Stage
|
|
Status |
|
|
| |
|
266 |
|
OCID |
ocds-gyl66f-232007001-000224
|
|
Project Title |
STAFF TRAINING
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
990,500,000.00
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
267 |
|
OCID |
ocds-gyl66f-232007001-000226
|
|
Project Title |
NIGERIA OIL AND GAS GAMES SUBSRIPTION
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
50,000,000.00
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
268 |
|
OCID |
ocds-gyl66f-232007001-000239
|
|
Project Title |
ICT PROJECTS (IMPLEMENT BOARDWIDE DATA SECURITY AND UPGRADE, SUPPORT FOR ICT INFRASTRUCTURE FOR NEW
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
173,000,000.00
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
269 |
|
OCID |
ocds-gyl66f-252047001-000057
|
|
Project Title |
Drilling and Installation of 4 Nos. Hand Pump Boreholes in Selected Locations in Zing LGA, Jalingo/Y
|
|
|
Procurring Entity |
UPPER BENUE RBDA
|
|
|
|
|
Budget Amount |
6,343,229.34
NGN
|
|
Budget year |
2017
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
270 |
|
OCID |
ocds-gyl66f-227001001-000031
|
|
Project Title |
Engagement of Consultant for The Sensitization and Review of Labour Laws in Line with The New Admini
|
|
|
Procurring Entity |
FEDERAL MINISTRY OF LABOUR AND EMPLOYMENT - HQTRS
|
|
|
|
|
Budget Amount |
2,005,878,067.00
NGN
|
|
Budget year |
2018
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
271 |
|
OCID |
ocds-gyl66f-517021030-000007
|
|
Project Title |
PROCUREMENT OF OFFICE AND LABORATORIES FURNITURE AND INSTALLATION
|
|
|
Procurring Entity |
FEDERAL UNIVERSITY OTUOKE
|
|
|
|
|
Budget Amount |
2,000,000,000.00
NGN
|
|
Budget year |
2018
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
272 |
|
OCID |
ocds-gyl66f-451002001-000174
|
|
Project Title |
Transformer installations
|
|
|
Procurring Entity |
NIGER DELTA DEVELOPMENT COMMISSION
|
|
|
|
|
Budget Amount |
486,748,143.00
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
273 |
|
OCID |
ocds-gyl66f-451002001-000176
|
|
Project Title |
CONSTRUCTION OF INYISHI-AMAMAO ROAD, ORU AFOR
|
|
|
Procurring Entity |
NIGER DELTA DEVELOPMENT COMMISSION
|
|
|
|
|
Budget Amount |
250,000,000.00
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
274 |
|
OCID |
ocds-gyl66f-232007001-000249
|
|
Project Title |
LICENSE RENEWAL (AVAST ANTIVIRUS RENEWAL+UPGRADE)
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
5,166,666.67
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
3,830,737.64
|
|
Contractor |
SOLUTION BOX LIMITED
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
275 |
|
OCID |
ocds-gyl66f-232007001-000250
|
|
Project Title |
ICT SUBSCRIPTION, RENEWAL AND LICENSE FEES (BUDGET PORTAL HOSTING RENEWAL)
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
2,333,333.00
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
48,151,381.77
|
|
Contractor |
Descasio Ltd
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
276 |
|
OCID |
ocds-gyl66f-232007001-000263
|
|
Project Title |
ADDITIONAL PROCUREMENT OF PRINTER TONERS
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
25,000,000.00
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
41,011,250.00
|
|
Contractor |
FORTEC INVESTMENT LIMITED
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
277 |
|
OCID |
ocds-gyl66f-232007001-000265
|
|
Project Title |
DESKTOPS FOR STAFF
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
23,750,000.00
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
42,516,250.00
|
|
Contractor |
FORTEC INVESTMENT LIMITED
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
278 |
|
OCID |
ocds-gyl66f-232007001-000280
|
|
Project Title |
NOGIC JQS IMPLEMENTATION ROAD WALK IN WEST AFRICA
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
3,000,000,000.00
NGN
|
|
Budget year |
2020
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
279 |
|
OCID |
ocds-gyl66f-232007001-000001
|
|
Project Title |
ICT Centre programmes for schools
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
4,725,184,966.48
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
185,437,000.00
|
|
Contractor |
De-Lawtech Computers Ltd
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
280 |
|
OCID |
ocds-gyl66f-232007001-000001
|
|
Project Title |
ICT Centre programmes for schools
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
4,725,184,966.48
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
185,437,000.00
|
|
Contractor |
De-Lawtech Computers Ltd
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
|
|
| |
|
281 |
|
OCID |
ocds-gyl66f-232007001-000010
|
|
Project Title |
lot 2 renovation of vocational and technical college, amoli, enugu
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
18,675,229.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
47,480,642.52
|
|
Contractor |
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
282 |
|
OCID |
ocds-gyl66f-232007001-000011
|
|
Project Title |
lot 3 renovation of vocational and technical college,enugu
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
4,944,712.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
4,944,712.50
|
|
Contractor |
MCJ Global
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Not yet commenced
|
|
| |
|
283 |
|
OCID |
ocds-gyl66f-232007001-000032
|
|
Project Title |
contract document review and bids evaluation procedure document
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
270,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
284 |
|
OCID |
ocds-gyl66f-232007001-000033
|
|
Project Title |
Headquarters building project
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
8,440,078,473.03
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
285 |
|
OCID |
ocds-gyl66f-232007001-000045
|
|
Project Title |
NIGERIAN OIL AND GAS PARKS-ACQUISITION, CLEARING OF SITE
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
400,000,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
141,889,430.55
|
|
Contractor |
Peers and Partners
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
286 |
|
OCID |
ocds-gyl66f-232007001-000046
|
|
Project Title |
NIGERIAN OIL AND GAS PARKS-CONSTRUCTION OF SECURITY POST AND PARKING LOTS
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
4,000,000,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
1,348,463,036.44
|
|
Contractor |
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
287 |
|
OCID |
ocds-gyl66f-232007001-000060
|
|
Project Title |
CAPACITY BUILDING WORKSHOP-TRAINING OF 100 YOUTHS IN GSM PHONE REPAIRS IN KANO
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
643,608,720.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
30,000,000.00
|
|
Contractor |
Stipends
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
288 |
|
OCID |
ocds-gyl66f-232007001-000065
|
|
Project Title |
VEHICLE MAINTENANCE AND IVM
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
161,000,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
13,251,000.00
|
|
Contractor |
Roynet Business Solution
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
289 |
|
OCID |
ocds-gyl66f-232007001-000072
|
|
Project Title |
HILUX CARRIAGE COVER
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
875,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
19,999,999.00
|
|
Contractor |
Globe Motors
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
290 |
|
OCID |
ocds-gyl66f-232007001-000079
|
|
Project Title |
NIGERIAN CONTENT COMPLIANCE WORKSHOP FOR IPPG
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
15,000,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
5,400,000.00
|
|
Contractor |
Jake Riley Ltd
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
291 |
|
OCID |
ocds-gyl66f-232007001-000080
|
|
Project Title |
TRAINING OF ALL STAFF ON SERVICOM
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
56,000,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
292 |
|
OCID |
ocds-gyl66f-232007001-000082
|
|
Project Title |
ESTABLISHMENT OF 6 REGIONAL HUBS
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
82,000,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
293 |
|
OCID |
ocds-gyl66f-232007001-000093
|
|
Project Title |
REVIEW OF PROCUREMENT PROCESS
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
50,000,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
294 |
|
OCID |
ocds-gyl66f-232007001-000094
|
|
Project Title |
PRINTING OF THE NOGICD ACT
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
17,000,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
19,341,000.00
|
|
Contractor |
Nateo Multi Services Limited
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
295 |
|
OCID |
ocds-gyl66f-232007001-000105
|
|
Project Title |
CSR SPONSORSHIP FOR PUBLIC RELATION
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
25,333,333.33
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
296 |
|
OCID |
ocds-gyl66f-232007001-000106
|
|
Project Title |
ANNUAL NC UNDERGRADUATE ESSAY COMPETITION COVERING PRE AND POST PUBLICITY, PRIZES, ACCESSORIES ETC
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
41,000,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
297 |
|
OCID |
ocds-gyl66f-232007001-000119
|
|
Project Title |
PROVISION FOR FAD RETREAT
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
12,187,500.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
298 |
|
OCID |
ocds-gyl66f-232007001-000122
|
|
Project Title |
PURCHASE OF 6 LAPTOPS FOR FAD STAFF
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
2,400,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
299 |
|
OCID |
ocds-gyl66f-232007001-000135
|
|
Project Title |
RENEW WEBSITE HOSTING AND SSL AND STAT ANALYTICS
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
5,000,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
300 |
|
OCID |
ocds-gyl66f-232007001-000138
|
|
Project Title |
EDMS SUPPORT SERVICES
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
8,000,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
24,517,500.00
|
|
Contractor |
Newton.Net Consult Ltd
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
301 |
|
OCID |
ocds-gyl66f-232007001-000152
|
|
Project Title |
HEAVY DUTY SCANNERS FOR EDMS
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
5,000,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
302 |
|
OCID |
ocds-gyl66f-232007001-000153
|
|
Project Title |
MAINTENANCE OF LAPTOPS, DESKTOPS AND PRINTERS
|
|
|
Procurring Entity |
NIGERIA CONTENT DEVELOPMENT AND MONITORING BOARD
|
|
|
|
|
Budget Amount |
4,000,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
303 |
|
OCID |
ocds-gyl66f-535015001-000009
|
|
Project Title |
Upgrade and Renovation of Laboratories, Warehouse and Office Complex in Port Harcourt.
|
|
|
Procurring Entity |
NATIONAL OIL SPILL DETECTION AND RESPONSE AGENCY
|
|
|
|
|
Budget Amount |
103,735,084.00
NGN
|
|
Budget year |
2018
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
304 |
|
OCID |
ocds-gyl66f-227004001-000049
|
|
Project Title |
PROVISION OF EMPOWERMENT MATERIALS FOR ISA/S.BIRNI FEDERAL CONSTITUENCY OF SOKOTO STATE
|
|
|
Procurring Entity |
NATIONAL PRODUCTIVITY CENTRE
|
|
|
|
|
Budget Amount |
14,250,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
305 |
|
OCID |
ocds-gyl66f-233003001-000003
|
|
Project Title |
SUPPLY OF LUND IMAGING RESISTIVITY AND IP SURVEY ACCESSORIES
|
|
|
Procurring Entity |
NIGERIAN GEOLOGICAL SURVEY AGENCY.
|
|
|
|
|
Budget Amount |
846,500,000.00
NGN
|
|
Budget year |
2017
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
306 |
|
OCID |
ocds-gyl66f-228073001-000007
|
|
Project Title |
PROMOTION OF NEW ENERGY TECHNOLOGIES FOR ENERGY SECURITY AND CLIMATE CHANGE MITIGATION
|
|
|
Procurring Entity |
ENERGY COMMISSION OF NIGERIA
|
|
|
|
|
Budget Amount |
125,635,297.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
52,802,758.28
|
|
Contractor |
SUNLITE INTEGRATED SERVICES LTD, FIRM AND RESOLUTE INVESTMENT LTD, PANDA GIANT DEVELOPERS LTD, TREASURE BOND NIG. LTD, ZAZ PROJECTS LTD, GLAMOUR VENTU
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
307 |
|
OCID |
ocds-gyl66f-233003001-000007
|
|
Project Title |
SUPPLY OF AIR CONDITIONERS
|
|
|
Procurring Entity |
NIGERIAN GEOLOGICAL SURVEY AGENCY.
|
|
|
|
|
Budget Amount |
846,500,000.00
NGN
|
|
Budget year |
2017
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
308 |
|
OCID |
ocds-gyl66f-233003001-000012
|
|
Project Title |
SUPPLY OF GEOTECHNICAL GRAIN SIEVE ANALYSIS, HYDROMETER TEST EQUIPMENT
|
|
|
Procurring Entity |
NIGERIAN GEOLOGICAL SURVEY AGENCY.
|
|
|
|
|
Budget Amount |
281,000,000.00
NGN
|
|
Budget year |
2017
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
309 |
|
OCID |
ocds-gyl66f-233003001-000017
|
|
Project Title |
SUPPLY OF EARTHQUAKE MONITORING EQUIPMENT
|
|
|
Procurring Entity |
NIGERIAN GEOLOGICAL SURVEY AGENCY.
|
|
|
|
|
Budget Amount |
281,000,000.00
NGN
|
|
Budget year |
2017
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
310 |
|
OCID |
ocds-gyl66f-228073001-000019
|
|
Project Title |
CONSTRUCTION OF SOLAR BOREHOLE IN ASO B,MARABA,NASARAWA STATE
|
|
|
Procurring Entity |
ENERGY COMMISSION OF NIGERIA
|
|
|
|
|
Budget Amount |
10,000,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
311 |
|
OCID |
ocds-gyl66f-228073001-000030
|
|
Project Title |
PROVISION OF MOTORISE BOREHOLES, SOLAR STREET LIGHTS AND TRANSFORMERS IN WUKARI /IBI FED. CONST. TAR
|
|
|
Procurring Entity |
ENERGY COMMISSION OF NIGERIA
|
|
|
|
|
Budget Amount |
25,000,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
9,905,568.00
|
|
Contractor |
CIIBEX SOLUTIONS NIG LTD AND CHYPOL TECHNOLOGIES NIG. LTD
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
312 |
|
OCID |
ocds-gyl66f-228073001-000038
|
|
Project Title |
SOLAR STREETLIGHT AT BOGORO/DASS/TAFAWA BALEWA LGA BAUCHI STATE (ECN/PPC/CAP10/008)
|
|
|
Procurring Entity |
ENERGY COMMISSION OF NIGERIA
|
|
|
|
|
Budget Amount |
16,672,500.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
313 |
|
OCID |
ocds-gyl66f-228073001-000041
|
|
Project Title |
SOLAR STREETLIGHT AT ZANGO TOWN,ZANGO LGA KATSINA STATE (ECN/PPC/CAP10/500)
|
|
|
Procurring Entity |
ENERGY COMMISSION OF NIGERIA
|
|
|
|
|
Budget Amount |
4,095,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
314 |
|
OCID |
ocds-gyl66f-156006003-000003
|
|
Project Title |
Technical Audit for School Support Projects in the North West
|
|
|
Procurring Entity |
NIGERIAN COMMUNICATION COMMISSION
|
|
|
|
|
Budget Amount |
41,380,980.00
NGN
|
|
Budget year |
2017
|
|
|
Project Amount |
41,380,980.00
|
|
Contractor |
Archivisual Solutions Limited
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
315 |
|
OCID |
ocds-gyl66f-156006003-000010
|
|
Project Title |
PROVISION OF 2 UNITS OF WIRELESS INTERNET CLOUD WITH 1 YEAR MAINTENANCE SUPPORT IN THE NORTH CENTRAL
|
|
|
Procurring Entity |
NIGERIAN COMMUNICATION COMMISSION
|
|
|
|
|
Budget Amount |
128,000,000.00
NGN
|
|
Budget year |
2017
|
|
|
Project Amount |
128,000,000.00
|
|
Contractor |
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
316 |
|
OCID |
ocds-gyl66f-156006003-000016
|
|
Project Title |
PROVISION OF 5 UNITS OF WIRELESS INTERNET CLOUD WITH 1 YEAR SUPPORT IN TERTIARY/SPECIALIZED HOSPITAL
|
|
|
Procurring Entity |
NIGERIAN COMMUNICATION COMMISSION
|
|
|
|
|
Budget Amount |
240,000,000.00
NGN
|
|
Budget year |
2017
|
|
|
Project Amount |
240,000,000.00
|
|
Contractor |
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
317 |
|
OCID |
ocds-gyl66f-156006003-000026
|
|
Project Title |
Renovation/Rehabilitation Work at DBI Mbora
|
|
|
Procurring Entity |
NIGERIAN COMMUNICATION COMMISSION
|
|
|
|
|
Budget Amount |
248,750,000.00
NGN
|
|
Budget year |
2017
|
|
|
Project Amount |
248,750,000.00
|
|
Contractor |
Arid Builders Ltd
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
318 |
|
OCID |
ocds-gyl66f-156006003-000038
|
|
Project Title |
Technical Audit for Virtual Examination Centers in the Northern Nigeria
|
|
|
Procurring Entity |
NIGERIAN COMMUNICATION COMMISSION
|
|
|
|
|
Budget Amount |
39,105,650.00
NGN
|
|
Budget year |
2017
|
|
|
Project Amount |
39,105,650.00
|
|
Contractor |
Visible Global Concept Limited
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
319 |
|
OCID |
ocds-gyl66f-19-000004
|
|
Project Title |
DESIGN, INSTALLATION OF E-PROCUREMENT
|
|
|
Procurring Entity |
MINISTRY OF BUDGET AND NATIONAL PLANNING
|
|
|
|
|
Budget Amount |
18,750,000.00
NGN
|
|
Budget year |
2018
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
320 |
|
OCID |
ocds-gyl66f-19-000011
|
|
Project Title |
DEVELOPMENT OF ICT STRATEGIC ROAD-MAP (2017-2020) FOR THE MINISTRY
|
|
|
Procurring Entity |
MINISTRY OF BUDGET AND NATIONAL PLANNING
|
|
|
|
|
Budget Amount |
28,000,000.00
NGN
|
|
Budget year |
2018
|
|
|
Project Amount |
10,450,000.00
|
|
Contractor |
Emirate Consulting Limited
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
321 |
|
OCID |
ocds-gyl66f-228073001-000060
|
|
Project Title |
"ANNUAL NATIONAL COUNCIL ON SICENCE & TECHNOLOGY, WATER RESOURCES, POWER, NATIONAL PLANNING "
|
|
|
Procurring Entity |
ENERGY COMMISSION OF NIGERIA
|
|
|
|
|
Budget Amount |
10,000,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
322 |
|
OCID |
ocds-gyl66f-228073001-000062
|
|
Project Title |
ENERGY AUDIT 2
|
|
|
Procurring Entity |
ENERGY COMMISSION OF NIGERIA
|
|
|
|
|
Budget Amount |
35,944,206.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
323 |
|
OCID |
ocds-gyl66f-227004001-000059
|
|
Project Title |
SUPPLY OF EMPOWERMENT MATERIALS INCLUDING TRICYCLES, MOTORCYCLES, GRINDING AND SEWING MACHINES YAGBA
|
|
|
Procurring Entity |
NATIONAL PRODUCTIVITY CENTRE
|
|
|
|
|
Budget Amount |
20,000,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
324 |
|
OCID |
ocds-gyl66f-228073001-000069
|
|
Project Title |
STRATEGIC EMPOWERMENT OF 100 FISHERMEN IN THE RIVERINE COMMUNITIES OF AKWA IBOM SOUTH SENATORIAL DIS
|
|
|
Procurring Entity |
ENERGY COMMISSION OF NIGERIA
|
|
|
|
|
Budget Amount |
50,000,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
10,105,200.00
|
|
Contractor |
DADAMAN GLOBAL INVESTMENT NIG. LTD
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
325 |
|
OCID |
ocds-gyl66f-228073001-000071
|
|
Project Title |
TRAINING OF YOUTHS IN REPAIRS AND MAINTENANCE OF SOLAR STREET LIGHTS IN OSUN WEST SENATORIAL DISTRIC
|
|
|
Procurring Entity |
ENERGY COMMISSION OF NIGERIA
|
|
|
|
|
Budget Amount |
30,000,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
326 |
|
OCID |
ocds-gyl66f-119008001-000004
|
|
Project Title |
Refurbishment of NIIA Liaison Office, Abuja
|
|
|
Procurring Entity |
NIGERIAN INSTITUTE OF INTERNATIONAL AFFAIRS, LAGOS
|
|
|
|
|
Budget Amount |
15,000,000.00
NGN
|
|
Budget year |
2018
|
|
|
Project Amount |
1,300,845.00
|
|
Contractor |
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
327 |
|
OCID |
ocds-gyl66f-119008001-000014
|
|
Project Title |
Supply & Installation of 1.0HP Air Conditioner
|
|
|
Procurring Entity |
NIGERIAN INSTITUTE OF INTERNATIONAL AFFAIRS, LAGOS
|
|
|
|
|
Budget Amount |
12,000,000.00
NGN
|
|
Budget year |
2017
|
|
|
Project Amount |
162,750.00
|
|
Contractor |
Monolith Global Resources Ltd
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
328 |
|
OCID |
ocds-gyl66f-535015001-000007
|
|
Project Title |
BUILDING OF GEOGRAPHIC INFORMATION SYSTEM (GIS) DATABASE OF UNDERGROUND STORAGE TANK FARMS, RETAIL O
|
|
|
Procurring Entity |
NATIONAL OIL SPILL DETECTION AND RESPONSE AGENCY
|
|
|
|
|
Budget Amount |
40,000,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Tender Stage
|
|
Status |
|
|
| |
|
329 |
|
OCID |
ocds-gyl66f-156001001-000007
|
|
Project Title |
PROVISION OF ICT EQUIPMENT AT NKANU WEST LGA, ENUGU STATE
|
|
|
Procurring Entity |
MINISTRY OF COMMUNICATION AND DIGITAL ECONOMY HQTRS
|
|
|
|
|
Budget Amount |
34,125,603.00
NGN
|
|
Budget year |
2018
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
330 |
|
OCID |
ocds-gyl66f-227004001-000005
|
|
Project Title |
NATIONAL PRODUCTIVITY DAY OR MERIT AWARD
|
|
|
Procurring Entity |
NATIONAL PRODUCTIVITY CENTRE
|
|
|
|
|
Budget Amount |
46,500,000.00
NGN
|
|
Budget year |
2018
|
|
|
Project Amount |
46,500,000.00
|
|
Contractor |
GEOMALDANY NIG LTD
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
|
|
| |
|
331 |
|
OCID |
ocds-gyl66f-228073001-000074
|
|
Project Title |
2MONITORING THE PERFORMANCE OF THE ENERGY SECTOR 2
|
|
|
Procurring Entity |
ENERGY COMMISSION OF NIGERIA
|
|
|
|
|
Budget Amount |
30,468,977.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
332 |
|
OCID |
ocds-gyl66f-156006003-000047
|
|
Project Title |
IMPLEMENTATION OF ADAPTI PROGRAMME IN THE 7 TERTIARY INSTITUTIONS IN THE NORTH WEST
|
|
|
Procurring Entity |
NIGERIAN COMMUNICATION COMMISSION
|
|
|
|
|
Budget Amount |
249,989,700.00
NGN
|
|
Budget year |
2017
|
|
|
Project Amount |
249,989,700.00
|
|
Contractor |
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
333 |
|
OCID |
ocds-gyl66f-156006003-000051
|
|
Project Title |
IMPLEMENTATION OF ADAPTI PROGRAMME IN THE 7 TERTIARY INSTITUTIONS IN SOUTH SOUTH
|
|
|
Procurring Entity |
NIGERIAN COMMUNICATION COMMISSION
|
|
|
|
|
Budget Amount |
229,910,000.00
NGN
|
|
Budget year |
2017
|
|
|
Project Amount |
229,910,000.00
|
|
Contractor |
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
334 |
|
OCID |
ocds-gyl66f-227004001-000042
|
|
Project Title |
PROVISION OF EMPOWERMENT MATERIALS FOR KUMBOSTO FEDERAL CONSTITUENCY OF KANO STATEBOTSO FEDERAL CONS
|
|
|
Procurring Entity |
NATIONAL PRODUCTIVITY CENTRE
|
|
|
|
|
Budget Amount |
66,500,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
335 |
|
OCID |
ocds-gyl66f-227004001-000051
|
|
Project Title |
PROVISION OF SOLAR POWER STREET LIGHTS FOR ISIALA MBANO ONUIMO OKIGWE FEDERAL CONSTITUENCY OF IMO ST
|
|
|
Procurring Entity |
NATIONAL PRODUCTIVITY CENTRE
|
|
|
|
|
Budget Amount |
14,250,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
336 |
|
OCID |
ocds-gyl66f-233003001-000005
|
|
Project Title |
SUPPLY OF GEOLOGICAL FIELD MAPPING EQUIPMENT
|
|
|
Procurring Entity |
NIGERIAN GEOLOGICAL SURVEY AGENCY.
|
|
|
|
|
Budget Amount |
99,459,000.00
NGN
|
|
Budget year |
2017
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
337 |
|
OCID |
ocds-gyl66f-228073001-000011
|
|
Project Title |
PAYMENT OF ENERGY COMMISSION OF NIGERIA (ECN) DEBTS ON ZONAL INTERVENTION PROJECTS OF NATIONAL ASSEM
|
|
|
Procurring Entity |
ENERGY COMMISSION OF NIGERIA
|
|
|
|
|
Budget Amount |
43,904,279.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
338 |
|
OCID |
ocds-gyl66f-233003001-000013
|
|
Project Title |
SUPPLY OF GEOSCIENCE LABORATORY CONSUMABLES
|
|
|
Procurring Entity |
NIGERIAN GEOLOGICAL SURVEY AGENCY.
|
|
|
|
|
Budget Amount |
281,000,000.00
NGN
|
|
Budget year |
2017
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
339 |
|
OCID |
ocds-gyl66f-228073001-000025
|
|
Project Title |
SOLAR STREET LIGHT IFITE AGULERI
|
|
|
Procurring Entity |
ENERGY COMMISSION OF NIGERIA
|
|
|
|
|
Budget Amount |
30,000,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
11,983,125.00
|
|
Contractor |
OBUERI CONSTRUCTIONS LTD
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
340 |
|
OCID |
ocds-gyl66f-228073001-000042
|
|
Project Title |
SOLAR STREETLIGHT AT OKOTO,EKITI STATE (ECN/PPC/CAP10/580)
|
|
|
Procurring Entity |
ENERGY COMMISSION OF NIGERIA
|
|
|
|
|
Budget Amount |
3,510,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
341 |
|
OCID |
ocds-gyl66f-228073001-000047
|
|
Project Title |
2 SOLAR POWERED BOREHOLE AT ELEGBEKA,OSE LGA ONDO STATE (ECN/PPC/CAP12/08/232)
|
|
|
Procurring Entity |
ENERGY COMMISSION OF NIGERIA
|
|
|
|
|
Budget Amount |
8,432,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
342 |
|
OCID |
ocds-gyl66f-228073001-000049
|
|
Project Title |
SOLAR POWERED BOREHOLE IN ARIGIDI AKOKO:AKOKO NORTH WEST LGA, ONDO STATE (ECN/PPC/CAP12/08/006)
|
|
|
Procurring Entity |
ENERGY COMMISSION OF NIGERIA
|
|
|
|
|
Budget Amount |
4,216,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
343 |
|
OCID |
ocds-gyl66f-156006003-000009
|
|
Project Title |
BANDWIDTH RECONFIGURING, UPGRADE, REACTIVATION AND RENEWAL OF 50 NUMBERS OF EXISTING WIRELESS CLOUD
|
|
|
Procurring Entity |
NIGERIAN COMMUNICATION COMMISSION
|
|
|
|
|
Budget Amount |
226,000,000.00
NGN
|
|
Budget year |
2017
|
|
|
Project Amount |
0.00
|
|
Contractor |
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
344 |
|
OCID |
ocds-gyl66f-156006003-000011
|
|
Project Title |
PROVISION OF 3 UNITS OF WIRELESS INTERNET CLOUD WITH 1 YEAR MAINTENANCE SUPPORT IN THE NORTH EAST
|
|
|
Procurring Entity |
NIGERIAN COMMUNICATION COMMISSION
|
|
|
|
|
Budget Amount |
160,000,000.00
NGN
|
|
Budget year |
2017
|
|
|
Project Amount |
160,000,000.00
|
|
Contractor |
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
345 |
|
OCID |
ocds-gyl66f-156006003-000032
|
|
Project Title |
Technical Audit for School Support in the South South
|
|
|
Procurring Entity |
NIGERIAN COMMUNICATION COMMISSION
|
|
|
|
|
Budget Amount |
37,999,000.00
NGN
|
|
Budget year |
2017
|
|
|
Project Amount |
37,999,000.00
|
|
Contractor |
Royal Stone Global Investment Limited
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
346 |
|
OCID |
ocds-gyl66f-156006003-000033
|
|
Project Title |
Supply of 770 Units of Laptops with e-learning suites for 7 Institution per Geo-Politcal Zone - SE
|
|
|
Procurring Entity |
NIGERIAN COMMUNICATION COMMISSION
|
|
|
|
|
Budget Amount |
249,695,000.00
NGN
|
|
Budget year |
2017
|
|
|
Project Amount |
239,000,000.00
|
|
Contractor |
Abna Engineering Limited
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
347 |
|
OCID |
ocds-gyl66f-156006003-000039
|
|
Project Title |
Supply/Branding/Configuration & Integration in to the cloud of 770 units of laptops with eLearning f
|
|
|
Procurring Entity |
NIGERIAN COMMUNICATION COMMISSION
|
|
|
|
|
Budget Amount |
249,850,000.00
NGN
|
|
Budget year |
2017
|
|
|
Project Amount |
248,105,700.00
|
|
Contractor |
Divax Nigeria Ltd
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
348 |
|
OCID |
ocds-gyl66f-156006003-000042
|
|
Project Title |
Technical Audit for e-Health Projects in the Southern Zone
|
|
|
Procurring Entity |
NIGERIAN COMMUNICATION COMMISSION
|
|
|
|
|
Budget Amount |
48,250,000.00
NGN
|
|
Budget year |
2017
|
|
|
Project Amount |
48,250,000.00
|
|
Contractor |
Molcom Multiconcept Ltd
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
349 |
|
OCID |
ocds-gyl66f-228073001-000056
|
|
Project Title |
energy summit
|
|
|
Procurring Entity |
ENERGY COMMISSION OF NIGERIA
|
|
|
|
|
Budget Amount |
30,000,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
350 |
|
OCID |
ocds-gyl66f-19-000003
|
|
Project Title |
DEVELOPMENT OF FLEXIBLE AUTOMATED ACCOUNTING SYSTEM
|
|
|
Procurring Entity |
MINISTRY OF BUDGET AND NATIONAL PLANNING
|
|
|
|
|
Budget Amount |
22,000,000.00
NGN
|
|
Budget year |
2018
|
|
|
Project Amount |
4,480,000.00
|
|
Contractor |
Termas Global Consult Limited
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
351 |
|
OCID |
ocds-gyl66f-19-000005
|
|
Project Title |
ESTABLISHMENT AND MAINTENANCE OF M&E (MIS/GIS Portal)
|
|
|
Procurring Entity |
MINISTRY OF BUDGET AND NATIONAL PLANNING
|
|
|
|
|
Budget Amount |
50,794,000.00
NGN
|
|
Budget year |
2018
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
352 |
|
OCID |
ocds-gyl66f-227004001-000056
|
|
Project Title |
SUPPLY OF SEWING MACHINE IN MARADUN ZAMFARA STATE
|
|
|
Procurring Entity |
NATIONAL PRODUCTIVITY CENTRE
|
|
|
|
|
Budget Amount |
9,500,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
353 |
|
OCID |
ocds-gyl66f-228073001-000067
|
|
Project Title |
SCIENCE AND TECHNOLOGY EXPO 2019
|
|
|
Procurring Entity |
ENERGY COMMISSION OF NIGERIA
|
|
|
|
|
Budget Amount |
15,597,607.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
354 |
|
OCID |
ocds-gyl66f-156006003-000046
|
|
Project Title |
Provision of 5 units of Wireless Internet Cloud with 1 year maintenance support in Tertiary / Speci
|
|
|
Procurring Entity |
NIGERIAN COMMUNICATION COMMISSION
|
|
|
|
|
Budget Amount |
240,000,000.00
NGN
|
|
Budget year |
2017
|
|
|
Project Amount |
240,000,000.00
|
|
Contractor |
One Stop Technologies Limited
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
355 |
|
OCID |
ocds-gyl66f-119008001-000013
|
|
Project Title |
Supply & Installation of 1.5HP Air Conditioner
|
|
|
Procurring Entity |
NIGERIAN INSTITUTE OF INTERNATIONAL AFFAIRS, LAGOS
|
|
|
|
|
Budget Amount |
12,000,000.00
NGN
|
|
Budget year |
2017
|
|
|
Project Amount |
498,750.00
|
|
Contractor |
Monolith Global Resources Ltd
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
356 |
|
OCID |
ocds-gyl66f-119008001-000015
|
|
Project Title |
Servicing of Package Unit Air Conditioner in Library
|
|
|
Procurring Entity |
NIGERIAN INSTITUTE OF INTERNATIONAL AFFAIRS, LAGOS
|
|
|
|
|
Budget Amount |
12,000,000.00
NGN
|
|
Budget year |
2017
|
|
|
Project Amount |
2,764,125.00
|
|
Contractor |
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
357 |
|
OCID |
ocds-gyl66f-119008001-000021
|
|
Project Title |
Architectural Design for the Rehabilitation of Printing Press
|
|
|
Procurring Entity |
NIGERIAN INSTITUTE OF INTERNATIONAL AFFAIRS, LAGOS
|
|
|
|
|
Budget Amount |
12,000,000.00
NGN
|
|
Budget year |
2017
|
|
|
Project Amount |
1,545,742.62
|
|
Contractor |
Yusab Cost Consultants
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
358 |
|
OCID |
ocds-gyl66f-535015001-000004
|
|
Project Title |
COMMUNITY BASED DISASTER REDUCTION PROGRAMME ON THE DANGERS OF OIL PIPELINE VANDALISM AND RESULTANT
|
|
|
Procurring Entity |
NATIONAL OIL SPILL DETECTION AND RESPONSE AGENCY
|
|
|
|
|
Budget Amount |
31,364,250.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Tender Stage
|
|
Status |
|
|
| |
|
359 |
|
OCID |
ocds-gyl66f-227004001-000006
|
|
Project Title |
NATIONAL PRODUCTIVITY INDEX DATA BANK
|
|
|
Procurring Entity |
NATIONAL PRODUCTIVITY CENTRE
|
|
|
|
|
Budget Amount |
22,717,333.00
NGN
|
|
Budget year |
2017
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
360 |
|
OCID |
ocds-gyl66f-517021029-000001
|
|
Project Title |
TWIN LECTURE THEATRE (250 CAPACITY EACH WITH OFFICES) IKOLE CAMPUS.
|
|
|
Procurring Entity |
FEDERAL UNIVERSITY OYE-EKITI
|
|
|
|
|
Budget Amount |
2,000,000,000.00
NGN
|
|
Budget year |
2018
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
361 |
|
OCID |
ocds-gyl66f-156006003-000054
|
|
Project Title |
Provision of 5 units of Wireless Internet Cloud with 1 year maintenance support in the SE zones
|
|
|
Procurring Entity |
NIGERIAN COMMUNICATION COMMISSION
|
|
|
|
|
Budget Amount |
235,000,000.00
NGN
|
|
Budget year |
2017
|
|
|
Project Amount |
235,000,000.00
|
|
Contractor |
Zinox Telecoms Ltd
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
362 |
|
OCID |
ocds-gyl66f-227004001-000063
|
|
Project Title |
SUPPLY OF CUSTOMIZED PRINTED EXERCISE BOOKS TO SCHOOLS IN KOGI EAST SENATORIAL DISTRICT, KOGI STATE
|
|
|
Procurring Entity |
NATIONAL PRODUCTIVITY CENTRE
|
|
|
|
|
Budget Amount |
50,000,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
363 |
|
OCID |
ocds-gyl66f-227004001-000072
|
|
Project Title |
SUPPLY OF 70 NOS OF SEWING MACHINES TO ESAN WEST, ESAN CENTRAL AND IGUEBEN FEDERAL CONSTITUENCY EDO
|
|
|
Procurring Entity |
NATIONAL PRODUCTIVITY CENTRE
|
|
|
|
|
Budget Amount |
10,000,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
364 |
|
OCID |
ocds-gyl66f-228073001-000082
|
|
Project Title |
ECN HEADQUARTERS BUILDING -RENOVATION FOR EFFICIENT PERFORMANCE .2
|
|
|
Procurring Entity |
ENERGY COMMISSION OF NIGERIA
|
|
|
|
|
Budget Amount |
100,762,897.00
NGN
|
|
Budget year |
2018
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
365 |
|
OCID |
ocds-gyl66f-227004001-000075
|
|
Project Title |
SUPPLY OF MOTORCYCLES TO APACHI PTUKPO BENUE STATE
|
|
|
Procurring Entity |
NATIONAL PRODUCTIVITY CENTRE
|
|
|
|
|
Budget Amount |
50,000,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
366 |
|
OCID |
ocds-gyl66f-227004001-000038
|
|
Project Title |
SUPPLY OF MOTORCYCLE FOR YOUTH EMPOWERMENT FOR OWERRI FEDERAL CONSTITUENCY IMO STATE
|
|
|
Procurring Entity |
NATIONAL PRODUCTIVITY CENTRE
|
|
|
|
|
Budget Amount |
66,500,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
367 |
|
OCID |
ocds-gyl66f-227004001-000048
|
|
Project Title |
SUPPLY OF MOTOR CYCLES TO EZZA NORTH/ISIELA FEDERAL CONSTITUENCY OF EBONYI STATE
|
|
|
Procurring Entity |
NATIONAL PRODUCTIVITY CENTRE
|
|
|
|
|
Budget Amount |
14,250,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
368 |
|
OCID |
ocds-gyl66f-227004001-000055
|
|
Project Title |
TRAINING OF YOUTHS AND WOMEN IN RICE FARMING IN BAKURA/MARADUN FEDERAL CONSTITUENCY OF ZAMFARA STATE
|
|
|
Procurring Entity |
NATIONAL PRODUCTIVITY CENTRE
|
|
|
|
|
Budget Amount |
14,250,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
369 |
|
OCID |
ocds-gyl66f-246001001-000003
|
|
Project Title |
Repairs of the Commission's water system
|
|
|
Procurring Entity |
REVENUE MOBILIZATION, ALLOCATION, AND FISCAL COMMISSION
|
|
|
|
|
Budget Amount |
35,000,000.00
NGN
|
|
Budget year |
2018
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
370 |
|
OCID |
ocds-gyl66f-228073001-000004
|
|
Project Title |
"MAINTENANCE OF ECN RENEWABLE ENERGY PROJECTS IN SIX GEOPOLITICAL ZONES "
|
|
|
Procurring Entity |
ENERGY COMMISSION OF NIGERIA
|
|
|
|
|
Budget Amount |
33,147,354.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
12,827,718.25
|
|
Contractor |
INCO INVESTMENT NIG LTD, HYDROFIELD SERVICES LTD, LOGINE INTERNATIONAL LTD, AND JAY JAY BADMUS INVEST. LTD
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
371 |
|
OCID |
ocds-gyl66f-233003001-000001
|
|
Project Title |
SUPPLY OF OVERHAUSER MAGNETOMETER/GRADIOMETER/VLF
|
|
|
Procurring Entity |
NIGERIAN GEOLOGICAL SURVEY AGENCY.
|
|
|
|
|
Budget Amount |
846,500,000.00
NGN
|
|
Budget year |
2017
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
372 |
|
OCID |
ocds-gyl66f-228073001-000009
|
|
Project Title |
DIRECTLY FIRED SOLID MUNICIPAL WASTE-TO-ENERGY PILOT PLANT
|
|
|
Procurring Entity |
ENERGY COMMISSION OF NIGERIA
|
|
|
|
|
Budget Amount |
30,824,685.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
373 |
|
OCID |
ocds-gyl66f-228073001-000010
|
|
Project Title |
PROVISION OF SOLAR STREETLIGHTS
|
|
|
Procurring Entity |
ENERGY COMMISSION OF NIGERIA
|
|
|
|
|
Budget Amount |
30,000,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
374 |
|
OCID |
ocds-gyl66f-233003001-000014
|
|
Project Title |
SUPPLY OF GEOSCIENCE LAB EQUIPMENT FOR NGMC AND NCMG
|
|
|
Procurring Entity |
NIGERIAN GEOLOGICAL SURVEY AGENCY.
|
|
|
|
|
Budget Amount |
281,000,000.00
NGN
|
|
Budget year |
2017
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
375 |
|
OCID |
ocds-gyl66f-233003001-000015
|
|
Project Title |
REHABILITATION WORK AT NGRL
|
|
|
Procurring Entity |
NIGERIAN GEOLOGICAL SURVEY AGENCY.
|
|
|
|
|
Budget Amount |
281,000,000.00
NGN
|
|
Budget year |
2017
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
376 |
|
OCID |
ocds-gyl66f-228073001-000020
|
|
Project Title |
PROVISION OF INTRGRATED (ALL-IN-ONE) SOLAR POWERED STREET LIGHTS IN FAGGE, KANO
|
|
|
Procurring Entity |
ENERGY COMMISSION OF NIGERIA
|
|
|
|
|
Budget Amount |
100,000,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
39,668,370.00
|
|
Contractor |
NEBAT GLOBAL CONCEPT LTD AND DHL UNIVERSAL BATTERY NIG LTD
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
377 |
|
OCID |
ocds-gyl66f-228073001-000021
|
|
Project Title |
RENOVATION OF SOLAR STREET LIGHTS IN OKUKU, ODO OTIN
|
|
|
Procurring Entity |
ENERGY COMMISSION OF NIGERIA
|
|
|
|
|
Budget Amount |
100,000,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
39,411,486.75
|
|
Contractor |
FRESHFIELD ENVIRONMENTAL SERVICES LTD, SAM DAVIDSON NIG LTD AND KAPLAN CONSULT LTD
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
378 |
|
OCID |
ocds-gyl66f-228073001-000026
|
|
Project Title |
SOLAR STREET LIGHTS AT: I. OKPUJE II. OBA ROAD, UZEBBA, OWAN WEST LGA, EDO STATE.
|
|
|
Procurring Entity |
ENERGY COMMISSION OF NIGERIA
|
|
|
|
|
Budget Amount |
20,000,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
7,719,009.46
|
|
Contractor |
OFORTEX ELECTRICAL ENGINEERING CO. LTD
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
379 |
|
OCID |
ocds-gyl66f-228073001-000039
|
|
Project Title |
SOLAR STRRETLIGHT AT GYALLESU TUDUN WADA ZARIA KADUNA STATE (ECN/PPC/CAP10/403)
|
|
|
Procurring Entity |
ENERGY COMMISSION OF NIGERIA
|
|
|
|
|
Budget Amount |
4,917,500.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
380 |
|
OCID |
ocds-gyl66f-228073001-000040
|
|
Project Title |
SOLAR STREETLIGHT AT NDIAWA UMUNNEOCHI LGA ABIA STATE (ECN/PPC/CAP10/404)
|
|
|
Procurring Entity |
ENERGY COMMISSION OF NIGERIA
|
|
|
|
|
Budget Amount |
6,727,500.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
381 |
|
OCID |
ocds-gyl66f-156006003-000002
|
|
Project Title |
Technical Audit for School Support Projects in the North East
|
|
|
Procurring Entity |
NIGERIAN COMMUNICATION COMMISSION
|
|
|
|
|
Budget Amount |
48,650,000.00
NGN
|
|
Budget year |
2017
|
|
|
Project Amount |
48,650,000.00
|
|
Contractor |
Abiss Associate Limited
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
382 |
|
OCID |
ocds-gyl66f-156006003-000004
|
|
Project Title |
Technical Audit for School Support Projects in the South East
|
|
|
Procurring Entity |
NIGERIAN COMMUNICATION COMMISSION
|
|
|
|
|
Budget Amount |
49,700,000.00
NGN
|
|
Budget year |
2017
|
|
|
Project Amount |
49,700,000.00
|
|
Contractor |
Ingenious Projects Limited
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
383 |
|
OCID |
ocds-gyl66f-156006003-000015
|
|
Project Title |
Supply/Branding/Configuration & Integration in the Cloud of 770 units of Laptops with elearning Suit
|
|
|
Procurring Entity |
NIGERIAN COMMUNICATION COMMISSION
|
|
|
|
|
Budget Amount |
249,989,000.00
NGN
|
|
Budget year |
2017
|
|
|
Project Amount |
229,992,600.00
|
|
Contractor |
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
384 |
|
OCID |
ocds-gyl66f-156006003-000029
|
|
Project Title |
Maintenance, Replacement and Upgrade of Electric Installations and Associated Works
|
|
|
Procurring Entity |
NIGERIAN COMMUNICATION COMMISSION
|
|
|
|
|
Budget Amount |
467,816,837.09
NGN
|
|
Budget year |
2017
|
|
|
Project Amount |
467,816,837.09
|
|
Contractor |
U & I Ventures Business Solution Ltd
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
|
|
| |
|
385 |
|
OCID |
ocds-gyl66f-156006003-000029
|
|
Project Title |
Maintenance, Replacement and Upgrade of Electric Installations and Associated Works
|
|
|
Procurring Entity |
NIGERIAN COMMUNICATION COMMISSION
|
|
|
|
|
Budget Amount |
467,816,837.09
NGN
|
|
Budget year |
2017
|
|
|
Project Amount |
467,816,837.09
|
|
Contractor |
U & I Ventures Business Solution Ltd
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
386 |
|
OCID |
ocds-gyl66f-156006003-000031
|
|
Project Title |
Supply of 770 Units of Laptops wiith e-learning suites for Academic/Non Academic Staff of 7 Institut
|
|
|
Procurring Entity |
NIGERIAN COMMUNICATION COMMISSION
|
|
|
|
|
Budget Amount |
249,500,000.00
NGN
|
|
Budget year |
2017
|
|
|
Project Amount |
249,500,000.00
|
|
Contractor |
Defensive and Protective Concepts Ltd
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
387 |
|
OCID |
ocds-gyl66f-19-000008
|
|
Project Title |
STUDY OF SOCIAL PROTECTION INTERVENTIONS IN NIGERIA
|
|
|
Procurring Entity |
MINISTRY OF BUDGET AND NATIONAL PLANNING
|
|
|
|
|
Budget Amount |
17,500,000.00
NGN
|
|
Budget year |
2018
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
388 |
|
OCID |
ocds-gyl66f-19-000010
|
|
Project Title |
UPDATING OF ECONOMIC DASHBOARD AND POLICY ANALYSIS LABORATORY
|
|
|
Procurring Entity |
MINISTRY OF BUDGET AND NATIONAL PLANNING
|
|
|
|
|
Budget Amount |
10,000,000.00
NGN
|
|
Budget year |
2018
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
389 |
|
OCID |
ocds-gyl66f-326003001-000004
|
|
Project Title |
PURCHASE OF PHOTOCOPYING MACHINES
|
|
|
Procurring Entity |
LEGAL AID COUNCIL
|
|
|
|
|
Budget Amount |
750,000.00
NGN
|
|
Budget year |
2018
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
390 |
|
OCID |
ocds-gyl66f-326003001-000006
|
|
Project Title |
PROVISION OF INTERNET FACILITIES FOR COUNCIL HEADQUARTERS
|
|
|
Procurring Entity |
LEGAL AID COUNCIL
|
|
|
|
|
Budget Amount |
14,011,064.00
NGN
|
|
Budget year |
2018
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
391 |
|
OCID |
ocds-gyl66f-227004001-000057
|
|
Project Title |
PROCUREMENT OF EMPOWERMENT MATERIALS, 2.5KVA GENERATORS FOR ORHIONMWOM LGA EDO STATE
|
|
|
Procurring Entity |
NATIONAL PRODUCTIVITY CENTRE
|
|
|
|
|
Budget Amount |
20,000,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
392 |
|
OCID |
ocds-gyl66f-228073001-000065
|
|
Project Title |
REVIEW AND POPULARIZATION OF NATIONAL ENERGY POLICY AND LEGAL INSTRUMENTS
|
|
|
Procurring Entity |
ENERGY COMMISSION OF NIGERIA
|
|
|
|
|
Budget Amount |
43,450,124.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
393 |
|
OCID |
ocds-gyl66f-228073001-000066
|
|
Project Title |
MANPOWER DEVELOPMENT IN ENERGY SECTOR (CAPACITY BUILDING)
|
|
|
Procurring Entity |
ENERGY COMMISSION OF NIGERIA
|
|
|
|
|
Budget Amount |
40,378,463.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
394 |
|
OCID |
ocds-gyl66f-228073001-000070
|
|
Project Title |
COUNTERPART FUNDING
|
|
|
Procurring Entity |
ENERGY COMMISSION OF NIGERIA
|
|
|
|
|
Budget Amount |
109,555,672.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
395 |
|
OCID |
ocds-gyl66f-119008001-000010
|
|
Project Title |
Purchase of 30 Seater Coaster Bus
|
|
|
Procurring Entity |
NIGERIAN INSTITUTE OF INTERNATIONAL AFFAIRS, LAGOS
|
|
|
|
|
Budget Amount |
19,250,000.00
NGN
|
|
Budget year |
2017
|
|
|
Project Amount |
19,250,000.00
|
|
Contractor |
De-Topy Integrated Services Ltd
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
396 |
|
OCID |
ocds-gyl66f-119008001-000012
|
|
Project Title |
Supply & Installation of 2.0HP Air Conditioner
|
|
|
Procurring Entity |
NIGERIAN INSTITUTE OF INTERNATIONAL AFFAIRS, LAGOS
|
|
|
|
|
Budget Amount |
12,000,000.00
NGN
|
|
Budget year |
2017
|
|
|
Project Amount |
498,750.00
|
|
Contractor |
Monolith Global Resources Ltd
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
397 |
|
OCID |
ocds-gyl66f-535015001-000008
|
|
Project Title |
IMPLEMENTATION OF IPSAS ACCRUAL ACCOUNTING BASIS
|
|
|
Procurring Entity |
NATIONAL OIL SPILL DETECTION AND RESPONSE AGENCY
|
|
|
|
|
Budget Amount |
7,068,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
398 |
|
OCID |
ocds-gyl66f-227004001-000035
|
|
Project Title |
NATIONAL INTERVENTION AND COMPETITIVENESS ENHANCEMENT PROGRAMME
|
|
|
Procurring Entity |
NATIONAL PRODUCTIVITY CENTRE
|
|
|
|
|
Budget Amount |
35,655,400.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
399 |
|
OCID |
ocds-gyl66f-227004001-000044
|
|
Project Title |
PROVISION OF EMPOWERMENT MATERIALS FOR GBOKO TARFA FEDERAL CONSTITUENCY OF BENUE STATE
|
|
|
Procurring Entity |
NATIONAL PRODUCTIVITY CENTRE
|
|
|
|
|
Budget Amount |
14,250,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
400 |
|
OCID |
ocds-gyl66f-227004001-000045
|
|
Project Title |
SUPPLY OF KEKE NAPEP IN ONDO EAST/ONDO WEST FEDERAL CONSTITUENCY
|
|
|
Procurring Entity |
NATIONAL PRODUCTIVITY CENTRE
|
|
|
|
|
Budget Amount |
14,250,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
401 |
|
OCID |
ocds-gyl66f-227004001-000054
|
|
Project Title |
EMPOWERMENT OF RURAL WOMEN AND YOUTH THROUGH THE SUPPLY OF 2 PICKUP VEHICLES FOR LIFTING OF AGRICULT
|
|
|
Procurring Entity |
NATIONAL PRODUCTIVITY CENTRE
|
|
|
|
|
Budget Amount |
14,250,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
402 |
|
OCID |
ocds-gyl66f-228073001-000006
|
|
Project Title |
ENERGY AUDIT
|
|
|
Procurring Entity |
ENERGY COMMISSION OF NIGERIA
|
|
|
|
|
Budget Amount |
35,944,206.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
403 |
|
OCID |
ocds-gyl66f-233003001-000010
|
|
Project Title |
SUPPLY OF ONE (10) SUV VEHICLE
|
|
|
Procurring Entity |
NIGERIAN GEOLOGICAL SURVEY AGENCY.
|
|
|
|
|
Budget Amount |
846,500,000.00
NGN
|
|
Budget year |
2017
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
404 |
|
OCID |
ocds-gyl66f-233003001-000011
|
|
Project Title |
SUPPLY OF 2NOS DRILLING RIGS
|
|
|
Procurring Entity |
NIGERIAN GEOLOGICAL SURVEY AGENCY.
|
|
|
|
|
Budget Amount |
846,500,000.00
NGN
|
|
Budget year |
2017
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
405 |
|
OCID |
ocds-gyl66f-228073001-000015
|
|
Project Title |
PROMOTION OF ENERGY EFFICIENCY IN PUBLIC BUILDING IN SIX GEO POLITICAL ZONES/CAPACITY BUILDING
|
|
|
Procurring Entity |
ENERGY COMMISSION OF NIGERIA
|
|
|
|
|
Budget Amount |
23,529,853.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
0.00
|
|
Contractor |
AE & E NIGERIA LTD, PERAZIM DEVELOPMENT & PLANNING LTD
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
406 |
|
OCID |
ocds-gyl66f-228073001-000022
|
|
Project Title |
PROVISION OF SOLAR STREET LIGHT IN KATSINA STATE
|
|
|
Procurring Entity |
ENERGY COMMISSION OF NIGERIA
|
|
|
|
|
Budget Amount |
310,000,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
122,224,696.50
|
|
Contractor |
MULTICAST SYSTEMS LTD, BEU-SYNERGY SOLUTION LTD, EXCLUSIVE ENERGY LTD, TIMAJE VENTURES LTD, HUX SYNERGY LTD, MALHAB GLOBAL VENTURES LTD, Q35 NIG. LTD,
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
407 |
|
OCID |
ocds-gyl66f-228073001-000034
|
|
Project Title |
TURNKEY PROJECT FOR BIOGAS PRODUCTION WITH SEPARATE URINE CHANNEL AND ELECTRICITY GENERATION IN SAGB
|
|
|
Procurring Entity |
ENERGY COMMISSION OF NIGERIA
|
|
|
|
|
Budget Amount |
120,000,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
408 |
|
OCID |
ocds-gyl66f-228073001-000036
|
|
Project Title |
OUSTANDING LIABILITY FOR THE PROVISION OF SOLAR STREETLIGHTAND 2NOS BOREHOLE AT OSU (ECN/PPC/CAP10/
|
|
|
Procurring Entity |
ENERGY COMMISSION OF NIGERIA
|
|
|
|
|
Budget Amount |
14,855,833.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
409 |
|
OCID |
ocds-gyl66f-228073001-000043
|
|
Project Title |
SOLAR STREETLIGHT AT ZURMI,MORIKI&SHINKAFI LGA ZAMFARA STATE (ECN/PPC/CAP10/250)
|
|
|
Procurring Entity |
ENERGY COMMISSION OF NIGERIA
|
|
|
|
|
Budget Amount |
4,387,500.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
410 |
|
OCID |
ocds-gyl66f-228073001-000046
|
|
Project Title |
SOLAR BOREHOLE AT OJA OBA MKT,INAKURE SOUTH LGA ONDO (ECN/PPC/CAP10/02/196)
|
|
|
Procurring Entity |
ENERGY COMMISSION OF NIGERIA
|
|
|
|
|
Budget Amount |
3,040,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
411 |
|
OCID |
ocds-gyl66f-228073001-000053
|
|
Project Title |
SOLARPOWERED BOREHOLE AT IKOJE-OKA,AKOKO SOUTH WEST LGA ONDO STATE (ECN/PPC/CAP10/08/243)
|
|
|
Procurring Entity |
ENERGY COMMISSION OF NIGERIA
|
|
|
|
|
Budget Amount |
8,432,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
412 |
|
OCID |
ocds-gyl66f-156006003-000006
|
|
Project Title |
SUPPLY AND INSTALLATION OF CRASH BOLLARDSBAT LAGOS, IBADAN AND PORT HARCOURT ZONAL OFFICES
|
|
|
Procurring Entity |
NIGERIAN COMMUNICATION COMMISSION
|
|
|
|
|
Budget Amount |
154,515,609.00
NGN
|
|
Budget year |
2017
|
|
|
Project Amount |
154,515,609.00
|
|
Contractor |
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
|
|
| |
|
413 |
|
OCID |
ocds-gyl66f-156006003-000006
|
|
Project Title |
SUPPLY AND INSTALLATION OF CRASH BOLLARDSBAT LAGOS, IBADAN AND PORT HARCOURT ZONAL OFFICES
|
|
|
Procurring Entity |
NIGERIAN COMMUNICATION COMMISSION
|
|
|
|
|
Budget Amount |
154,515,609.00
NGN
|
|
Budget year |
2017
|
|
|
Project Amount |
154,515,609.00
|
|
Contractor |
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
414 |
|
OCID |
ocds-gyl66f-156006003-000007
|
|
Project Title |
BANDWIDTH UPGRADE, RECONFIGURING, REACTIVATION AND RENEWAL OF 100 NUMBERS OF EXISTING DIGITAL AWAREN
|
|
|
Procurring Entity |
NIGERIAN COMMUNICATION COMMISSION
|
|
|
|
|
Budget Amount |
187,000,000.00
NGN
|
|
Budget year |
2017
|
|
|
Project Amount |
187,000,000.00
|
|
Contractor |
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
415 |
|
OCID |
ocds-gyl66f-156006003-000020
|
|
Project Title |
IMPLEMENTATION OF ADAPTI PROGRAMME IN THE 7 TERTIARY INSTITUTIONS IN THE NORTH CENTRAL
|
|
|
Procurring Entity |
NIGERIAN COMMUNICATION COMMISSION
|
|
|
|
|
Budget Amount |
249,892,900.00
NGN
|
|
Budget year |
2017
|
|
|
Project Amount |
249,892,900.00
|
|
Contractor |
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
416 |
|
OCID |
ocds-gyl66f-156006003-000023
|
|
Project Title |
Supply/ Branding/ Configuration & Integration in to the Cloud of 770 units of Laptops with eLearning
|
|
|
Procurring Entity |
NIGERIAN COMMUNICATION COMMISSION
|
|
|
|
|
Budget Amount |
247,753,153.00
NGN
|
|
Budget year |
2017
|
|
|
Project Amount |
247,753,153.00
|
|
Contractor |
Italia Global Nigeria
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
417 |
|
OCID |
ocds-gyl66f-156006003-000035
|
|
Project Title |
Supply of 770 Units of Laptops with e-learning suites for 7 Institutions per Geo-Politcal Zone - SS
|
|
|
Procurring Entity |
NIGERIAN COMMUNICATION COMMISSION
|
|
|
|
|
Budget Amount |
231,000,000.00
NGN
|
|
Budget year |
2017
|
|
|
Project Amount |
249,850,000.00
|
|
Contractor |
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
418 |
|
OCID |
ocds-gyl66f-156006003-000036
|
|
Project Title |
Supply and Installation of Movable and Immovable Furniture for the Main Auditorium at NCC Annex Mbor
|
|
|
Procurring Entity |
NIGERIAN COMMUNICATION COMMISSION
|
|
|
|
|
Budget Amount |
249,650,000.00
NGN
|
|
Budget year |
2017
|
|
|
Project Amount |
249,650,000.00
|
|
Contractor |
Prudency Concept Ltd
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
419 |
|
OCID |
ocds-gyl66f-156006003-000041
|
|
Project Title |
Technical Audit for e-Health Projects in the Northern Zone
|
|
|
Procurring Entity |
NIGERIAN COMMUNICATION COMMISSION
|
|
|
|
|
Budget Amount |
48,800,000.00
NGN
|
|
Budget year |
2017
|
|
|
Project Amount |
48,800,000.00
|
|
Contractor |
Sterling Design & Associates
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
420 |
|
OCID |
ocds-gyl66f-156006003-000043
|
|
Project Title |
Study of Cost Based Pricing of Mobile Termination Rate for Voice Services
|
|
|
Procurring Entity |
NIGERIAN COMMUNICATION COMMISSION
|
|
|
|
|
Budget Amount |
94,105,360.00
NGN
|
|
Budget year |
2017
|
|
|
Project Amount |
94,105,360.00
|
|
Contractor |
Payday Advance and Support Services Ltd
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
421 |
|
OCID |
ocds-gyl66f-227004001-000101
|
|
Project Title |
VOCATIONALTRAINING FOR WOMEN AND YOUTHS IN ESAN WEST, ESAN CENTRAL AND IGUEBEN FEDERAL CONSTITUENCY
|
|
|
Procurring Entity |
NATIONAL PRODUCTIVITY CENTRE
|
|
|
|
|
Budget Amount |
10,000,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
422 |
|
OCID |
ocds-gyl66f-227004001-000104
|
|
Project Title |
TRAINING OF WOMEN AND YOUTH ON FASHION DESIGN IN AFIJO/ATIBA/OYO EAST/OYO WEST FEDERAL CONSTITUENCY
|
|
|
Procurring Entity |
NATIONAL PRODUCTIVITY CENTRE
|
|
|
|
|
Budget Amount |
54,000,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
423 |
|
OCID |
ocds-gyl66f-19-000001
|
|
Project Title |
CGE: MICRO SIMULATION MODEL OF THE NIGERIA ECONOMY
|
|
|
Procurring Entity |
MINISTRY OF BUDGET AND NATIONAL PLANNING
|
|
|
|
|
Budget Amount |
88,622,000.00
NGN
|
|
Budget year |
2018
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
424 |
|
OCID |
ocds-gyl66f-19-000015
|
|
Project Title |
PRODUCTION OF M&E MANUALS
|
|
|
Procurring Entity |
MINISTRY OF BUDGET AND NATIONAL PLANNING
|
|
|
|
|
Budget Amount |
9,000,000.00
NGN
|
|
Budget year |
2018
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
425 |
|
OCID |
ocds-gyl66f-227004001-000058
|
|
Project Title |
STRATEGIC EMPOWERMENT PROGRAMME FOR YOUTH AND WOMEN IN POULTRY FARMING IN ILE-OLUJI/OKE-IGBO/ODIGBO
|
|
|
Procurring Entity |
NATIONAL PRODUCTIVITY CENTRE
|
|
|
|
|
Budget Amount |
20,000,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
426 |
|
OCID |
ocds-gyl66f-119008001-000007
|
|
Project Title |
Design of Web Application
|
|
|
Procurring Entity |
NIGERIAN INSTITUTE OF INTERNATIONAL AFFAIRS, LAGOS
|
|
|
|
|
Budget Amount |
5,000,000.00
NGN
|
|
Budget year |
2018
|
|
|
Project Amount |
4,900,000.00
|
|
Contractor |
[1020067] AWACOM SERVICES LTD
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
427 |
|
OCID |
ocds-gyl66f-119008001-000008
|
|
Project Title |
Painting of External Walls of NIIA Head Office
|
|
|
Procurring Entity |
NIGERIAN INSTITUTE OF INTERNATIONAL AFFAIRS, LAGOS
|
|
|
|
|
Budget Amount |
15,000,000.00
NGN
|
|
Budget year |
2018
|
|
|
Project Amount |
3,461,533.00
|
|
Contractor |
[1321850] SYGNITE POWER AND ENERGY SOLUTIONS LTD
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
428 |
|
OCID |
ocds-gyl66f-535015001-000003
|
|
Project Title |
DEVELOPMENT OF OIL SPILL RESPONSE LIBRARY INCLUDING e- LIBRARY, OIL SPILL MANAGEMENT MANUALS, JOURNA
|
|
|
Procurring Entity |
NATIONAL OIL SPILL DETECTION AND RESPONSE AGENCY
|
|
|
|
|
Budget Amount |
15,903,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Tender Stage
|
|
Status |
|
|
| |
|
429 |
|
OCID |
ocds-gyl66f-227004001-000034
|
|
Project Title |
COLLABORATIVE GATHERING OF PRODUCTIVITY DATA WITH NATIONAL BUREAU OF STATISTICS
|
|
|
Procurring Entity |
NATIONAL PRODUCTIVITY CENTRE
|
|
|
|
|
Budget Amount |
11,510,200.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
430 |
|
OCID |
ocds-gyl66f-227004001-000039
|
|
Project Title |
SUPPLY OF TRANSFORMERS TO OWERRI FEDERAL CONSTITUENCY IMO STATE
|
|
|
Procurring Entity |
NATIONAL PRODUCTIVITY CENTRE
|
|
|
|
|
Budget Amount |
38,000,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
431 |
|
OCID |
ocds-gyl66f-227004001-000047
|
|
Project Title |
PROVISION FOR TRICYCLES FOR YOUTHS OF OBUBRA/ETUNG FEDERAL CONSTITUENCY OF CROSS RIVERS STATE
|
|
|
Procurring Entity |
NATIONAL PRODUCTIVITY CENTRE
|
|
|
|
|
Budget Amount |
14,250,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
432 |
|
OCID |
ocds-gyl66f-227004001-000050
|
|
Project Title |
PROVISION OF EMPOWERMENT MATERIALS FOR BAURE/ZANGO FEDERAL CONSTITUENCY OF KASTINA STATE
|
|
|
Procurring Entity |
NATIONAL PRODUCTIVITY CENTRE
|
|
|
|
|
Budget Amount |
14,250,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
433 |
|
OCID |
ocds-gyl66f-228073001-000005
|
|
Project Title |
NATIONAL ENERGY SURVEYS
|
|
|
Procurring Entity |
ENERGY COMMISSION OF NIGERIA
|
|
|
|
|
Budget Amount |
51,918,055.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
434 |
|
OCID |
ocds-gyl66f-233003001-000006
|
|
Project Title |
SUPPLY OF 4NOS SALOON CAR
|
|
|
Procurring Entity |
NIGERIAN GEOLOGICAL SURVEY AGENCY.
|
|
|
|
|
Budget Amount |
99,459,000.00
NGN
|
|
Budget year |
2017
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
435 |
|
OCID |
ocds-gyl66f-228073001-000013
|
|
Project Title |
ENERGY CROPS: REHABILITATION OF JATROPHA FARM IN KARSHI FOR BIODIESEL PRODUCTION
|
|
|
Procurring Entity |
ENERGY COMMISSION OF NIGERIA
|
|
|
|
|
Budget Amount |
10,777,682.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
436 |
|
OCID |
ocds-gyl66f-228073001-000018
|
|
Project Title |
PROVISION OF STREET LIGHTS IN RIGANGE,LAMURDE LGA,ADAMAWA STATE
|
|
|
Procurring Entity |
ENERGY COMMISSION OF NIGERIA
|
|
|
|
|
Budget Amount |
10,000,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
437 |
|
OCID |
ocds-gyl66f-228073001-000032
|
|
Project Title |
CONSTRUCTION OF 66NOS. OF SOLAR POWER STREET LIGHTS IN OBI/OJU LGA, BENUE SOUTH SENATORIAL DISTRICT,
|
|
|
Procurring Entity |
ENERGY COMMISSION OF NIGERIA
|
|
|
|
|
Budget Amount |
50,000,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
14,431,737.50
|
|
Contractor |
AL-BASITH INVESTMENT NIG LTD AND BROOK RESOURCES LOGISTICS LTD
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
438 |
|
OCID |
ocds-gyl66f-228073001-000048
|
|
Project Title |
SOLAR STREETLIGHT AT OLALEKE/MORGAN/ YETUNDE MORGAN AV.OJODU, IKEJA LGA LAGOS STATE (ECN/PPC/CAP12/0
|
|
|
Procurring Entity |
ENERGY COMMISSION OF NIGERIA
|
|
|
|
|
Budget Amount |
7,139,533.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
439 |
|
OCID |
ocds-gyl66f-228073001-000054
|
|
Project Title |
ESTABLISHMENT OF ONE SOLAR POWERED BOREHOLE AT NTAN, CROSS RIVERS STATE (ECN/PPC/CAP12/08/071)
|
|
|
Procurring Entity |
ENERGY COMMISSION OF NIGERIA
|
|
|
|
|
Budget Amount |
4,960,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
440 |
|
OCID |
ocds-gyl66f-156006003-000005
|
|
Project Title |
ADDITIONAL FURNISHING OF THE NCC ANNEX
|
|
|
Procurring Entity |
NIGERIAN COMMUNICATION COMMISSION
|
|
|
|
|
Budget Amount |
248,980,000.00
NGN
|
|
Budget year |
2017
|
|
|
Project Amount |
248,980,000.00
|
|
Contractor |
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
441 |
|
OCID |
ocds-gyl66f-156006003-000012
|
|
Project Title |
Technical Audit for School Support Projects in the South West
|
|
|
Procurring Entity |
NIGERIAN COMMUNICATION COMMISSION
|
|
|
|
|
Budget Amount |
37,999,000.00
NGN
|
|
Budget year |
2017
|
|
|
Project Amount |
37,999,000.00
|
|
Contractor |
AM Synergy Nig. Ltd
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
442 |
|
OCID |
ocds-gyl66f-156006003-000018
|
|
Project Title |
PROVISION OF 3 UNITS OF WIRELESS INTERNET CLOUD WITH 1 YEAR MAINTENANCE SUPPORT IN THE SOUTH WEST
|
|
|
Procurring Entity |
NIGERIAN COMMUNICATION COMMISSION
|
|
|
|
|
Budget Amount |
187,400,000.00
NGN
|
|
Budget year |
2017
|
|
|
Project Amount |
187,400,000.00
|
|
Contractor |
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
443 |
|
OCID |
ocds-gyl66f-156006003-000034
|
|
Project Title |
Supply of 770 Units of Laptops with e-learning suites for 7 Institutions per Geo-Polical Zone - SW
|
|
|
Procurring Entity |
NIGERIAN COMMUNICATION COMMISSION
|
|
|
|
|
Budget Amount |
249,500,000.00
NGN
|
|
Budget year |
2017
|
|
|
Project Amount |
249,500,000.00
|
|
Contractor |
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
444 |
|
OCID |
ocds-gyl66f-228073001-000057
|
|
Project Title |
RENEWABLE ENERGY FOR PRODUCTIVE USE:
|
|
|
Procurring Entity |
ENERGY COMMISSION OF NIGERIA
|
|
|
|
|
Budget Amount |
80,760,099.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
445 |
|
OCID |
ocds-gyl66f-19-000002
|
|
Project Title |
DEVELOPMENT OF A NATIONAL PLAN FOR THE IMPLEMENTATION OF THE PARIS AGREEMENT ON NATIONAL DETERMINE C
|
|
|
Procurring Entity |
MINISTRY OF BUDGET AND NATIONAL PLANNING
|
|
|
|
|
Budget Amount |
21,500,000.00
NGN
|
|
Budget year |
2018
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
446 |
|
OCID |
ocds-gyl66f-19-000006
|
|
Project Title |
COORDINATION OF DONOR ACTIVITIES AND ENGAGEMENT AND OFFICIAL DEVELOPMENT ASSISTANCE (ODA) & DEVELOPM
|
|
|
Procurring Entity |
MINISTRY OF BUDGET AND NATIONAL PLANNING
|
|
|
|
|
Budget Amount |
37,405,863.00
NGN
|
|
Budget year |
2018
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
447 |
|
OCID |
ocds-gyl66f-19-000013
|
|
Project Title |
PROCUREMENT OF ADMINISTRATIVE CENTRAL SERVICE TOOLS
|
|
|
Procurring Entity |
MINISTRY OF BUDGET AND NATIONAL PLANNING
|
|
|
|
|
Budget Amount |
35,600,000.00
NGN
|
|
Budget year |
2018
|
|
|
Project Amount |
4,408,950.00
|
|
Contractor |
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
448 |
|
OCID |
ocds-gyl66f-19-000013
|
|
Project Title |
PROCUREMENT OF ADMINISTRATIVE CENTRAL SERVICE TOOLS
|
|
|
Procurring Entity |
MINISTRY OF BUDGET AND NATIONAL PLANNING
|
|
|
|
|
Budget Amount |
35,600,000.00
NGN
|
|
Budget year |
2018
|
|
|
Project Amount |
4,408,950.00
|
|
Contractor |
[920369] HARMONIOUS INTERWORLD NIG LTD
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
|
|
| |
|
449 |
|
OCID |
ocds-gyl66f-326003001-000003
|
|
Project Title |
PURCHASE OF COMPUTER PRINTERS
|
|
|
Procurring Entity |
LEGAL AID COUNCIL
|
|
|
|
|
Budget Amount |
713,463.00
NGN
|
|
Budget year |
2018
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
450 |
|
OCID |
ocds-gyl66f-228073001-000064
|
|
Project Title |
MONITORING THE PERFORMANCE OF THE ENERGY SECTOR
|
|
|
Procurring Entity |
ENERGY COMMISSION OF NIGERIA
|
|
|
|
|
Budget Amount |
30,468,977.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
451 |
|
OCID |
ocds-gyl66f-228073001-000068
|
|
Project Title |
DEVELOPMENT OF NIGERIA ENERGY HOUSE
|
|
|
Procurring Entity |
ENERGY COMMISSION OF NIGERIA
|
|
|
|
|
Budget Amount |
47,269,397.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
452 |
|
OCID |
ocds-gyl66f-535015001-000005
|
|
Project Title |
COOMUNITY BASED DISASTER REDUCTION PROGRAMME ON THE DANGERS OF OIL PIPELINE VANDERLISM AND RESULTANT
|
|
|
Procurring Entity |
NATIONAL OIL SPILL DETECTION AND RESPONSE AGENCY
|
|
|
|
|
Budget Amount |
31,364,250.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Tender Stage
|
|
Status |
|
|
| |
|
453 |
|
OCID |
ocds-gyl66f-156001001-000002
|
|
Project Title |
Human Capacity Building on E-Learning for Unemployed youth in Enugu East LGA, Enugu Senatorial Distr
|
|
|
Procurring Entity |
MINISTRY OF COMMUNICATION AND DIGITAL ECONOMY HQTRS
|
|
|
|
|
Budget Amount |
41,616,589.00
NGN
|
|
Budget year |
2018
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
454 |
|
OCID |
ocds-gyl66f-156001001-000009
|
|
Project Title |
GOVERNMENT CONTACT CENTRE (ON-GOING)
|
|
|
Procurring Entity |
MINISTRY OF COMMUNICATION AND DIGITAL ECONOMY HQTRS
|
|
|
|
|
Budget Amount |
54,019,574.00
NGN
|
|
Budget year |
2018
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
455 |
|
OCID |
ocds-gyl66f-156006003-000050
|
|
Project Title |
CONSTRUCTION OF 7 UNITS OF CLASSROOMS AND INSTALLATION OF ICT EQUIPMENT FOR 7 SCHOOLS IN NORTHERN ZO
|
|
|
Procurring Entity |
NIGERIAN COMMUNICATION COMMISSION
|
|
|
|
|
Budget Amount |
249,105,360.00
NGN
|
|
Budget year |
2017
|
|
|
Project Amount |
249,105,360.00
|
|
Contractor |
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
456 |
|
OCID |
ocds-gyl66f-227004001-000062
|
|
Project Title |
ENTREPRENEURSHIP TRAINING AND EMPOWERMENT FOR YOUTHS IN OJOKU, INYE OFUGO AND ANKPA IN ANKPA LGA, KO
|
|
|
Procurring Entity |
NATIONAL PRODUCTIVITY CENTRE
|
|
|
|
|
Budget Amount |
50,000,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
457 |
|
OCID |
ocds-gyl66f-227004001-000065
|
|
Project Title |
WOMEN AND YOUTHS EMPOWERMENT IN OMALA LGA, KOGI
|
|
|
Procurring Entity |
NATIONAL PRODUCTIVITY CENTRE
|
|
|
|
|
Budget Amount |
50,000,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
458 |
|
OCID |
ocds-gyl66f-227004001-000074
|
|
Project Title |
SUPPLY OF IRRIGATION MACHINES ACCESSORIES IN GOMBE/KWAMI/FUNAKAYE FEDERAL CONSTITUENCY GOMBE STATE
|
|
|
Procurring Entity |
NATIONAL PRODUCTIVITY CENTRE
|
|
|
|
|
Budget Amount |
50,000,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
459 |
|
OCID |
ocds-gyl66f-227004001-000078
|
|
Project Title |
SUPPLY OF HAIR DRESSING EQUIPMENT TO VARIOUS WOMEN IN CROSS RIVER STATE
|
|
|
Procurring Entity |
NATIONAL PRODUCTIVITY CENTRE
|
|
|
|
|
Budget Amount |
45,000,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
460 |
|
OCID |
ocds-gyl66f-227004001-000084
|
|
Project Title |
SKILL ACQUISITION TRAINING FOR YOUTH AND WOMEN IN ZAKI AND SHIRA LGAS BAUCHI STATE
|
|
|
Procurring Entity |
NATIONAL PRODUCTIVITY CENTRE
|
|
|
|
|
Budget Amount |
45,000,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
461 |
|
OCID |
ocds-gyl66f-228073001-000086
|
|
Project Title |
NATIONAL ENERGY SURVEYS 2
|
|
|
Procurring Entity |
ENERGY COMMISSION OF NIGERIA
|
|
|
|
|
Budget Amount |
161,363,489.00
NGN
|
|
Budget year |
2018
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
462 |
|
OCID |
ocds-gyl66f-227004001-000033
|
|
Project Title |
PRODUCTIVITY COACHING AND MENTORING FOR SCHOOLS AND NYSC MEMBERS
|
|
|
Procurring Entity |
NATIONAL PRODUCTIVITY CENTRE
|
|
|
|
|
Budget Amount |
2,325,600.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
463 |
|
OCID |
ocds-gyl66f-227004001-000036
|
|
Project Title |
DEPLOYMENT AND TRAINING ON PRODUCTIVITY SOLUTIONS TEMPLATE IN 8 SME CLUSTERS
|
|
|
Procurring Entity |
NATIONAL PRODUCTIVITY CENTRE
|
|
|
|
|
Budget Amount |
9,909,120.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
464 |
|
OCID |
ocds-gyl66f-227004001-000037
|
|
Project Title |
DEVELOPMENT OF PRODUCTIVITY PRACTITIONERS
|
|
|
Procurring Entity |
NATIONAL PRODUCTIVITY CENTRE
|
|
|
|
|
Budget Amount |
15,679,130.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
465 |
|
OCID |
ocds-gyl66f-228073001-000003
|
|
Project Title |
RENEWABLE ENERGY FOR PRODUCTIVE USE
|
|
|
Procurring Entity |
ENERGY COMMISSION OF NIGERIA
|
|
|
|
|
Budget Amount |
80,760,099.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
32,300,000.00
|
|
Contractor |
TENOM GLOBAL NIG LTD
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
466 |
|
OCID |
ocds-gyl66f-228073001-000012
|
|
Project Title |
MAINTENANCE OF SOLAR STREETLIGHTS AND SOLAR BOREHOLES IN PLATEAU SOUTH
|
|
|
Procurring Entity |
ENERGY COMMISSION OF NIGERIA
|
|
|
|
|
Budget Amount |
150,000,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
467 |
|
OCID |
ocds-gyl66f-228073001-000050
|
|
Project Title |
SOLAR POWERED BOREHOLE AT IKARA TOWN KADUNA (ECN/PPC/CAP12/08/120)
|
|
|
Procurring Entity |
ENERGY COMMISSION OF NIGERIA
|
|
|
|
|
Budget Amount |
5,270,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
468 |
|
OCID |
ocds-gyl66f-228073001-000051
|
|
Project Title |
SOLAR POWERED BOREHOLE AT IKARA TOWN KADUNA (ECN/PPC/CAP12/08/120)..
|
|
|
Procurring Entity |
ENERGY COMMISSION OF NIGERIA
|
|
|
|
|
Budget Amount |
5,270,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
469 |
|
OCID |
ocds-gyl66f-156006003-000013
|
|
Project Title |
Supply/Branding/Configuration & Integration in to the Cloud of 770 units of Laptops with eLearning S
|
|
|
Procurring Entity |
NIGERIAN COMMUNICATION COMMISSION
|
|
|
|
|
Budget Amount |
229,992,600.00
NGN
|
|
Budget year |
2017
|
|
|
Project Amount |
0.00
|
|
Contractor |
Covenant plus Engineering Ltd
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
470 |
|
OCID |
ocds-gyl66f-156006003-000013
|
|
Project Title |
Supply/Branding/Configuration & Integration in to the Cloud of 770 units of Laptops with eLearning S
|
|
|
Procurring Entity |
NIGERIAN COMMUNICATION COMMISSION
|
|
|
|
|
Budget Amount |
229,992,600.00
NGN
|
|
Budget year |
2017
|
|
|
Project Amount |
249,989,000.00
|
|
Contractor |
Covenant plus Engineering Ltd
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
|
|
| |
|
471 |
|
OCID |
ocds-gyl66f-156006003-000014
|
|
Project Title |
PROVISION OF 3 UNITS OF WIRELESS INTERNET CLOUD WITH 1 YEAR MAINTENANCE SUPPORT IN THE NORTH WEST
|
|
|
Procurring Entity |
NIGERIAN COMMUNICATION COMMISSION
|
|
|
|
|
Budget Amount |
188,000,000.00
NGN
|
|
Budget year |
2017
|
|
|
Project Amount |
0.00
|
|
Contractor |
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
472 |
|
OCID |
ocds-gyl66f-156006003-000028
|
|
Project Title |
Completion, Remodeling and Upgrading of Auditorium facilities at the NCC Annex Mbora, including the
|
|
|
Procurring Entity |
NIGERIAN COMMUNICATION COMMISSION
|
|
|
|
|
Budget Amount |
249,150,000.00
NGN
|
|
Budget year |
2017
|
|
|
Project Amount |
249,150,000.00
|
|
Contractor |
Mainstream Contractors Nigeria Ltd
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
473 |
|
OCID |
ocds-gyl66f-156006003-000030
|
|
Project Title |
Supply of 770 Units of Laptops with e-learning suites for Academic/Non Academic Staff of 7 Instituti
|
|
|
Procurring Entity |
NIGERIAN COMMUNICATION COMMISSION
|
|
|
|
|
Budget Amount |
249,800,000.00
NGN
|
|
Budget year |
2017
|
|
|
Project Amount |
249,800,000.00
|
|
Contractor |
U & I Ventures Business Solution Ltd
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
474 |
|
OCID |
ocds-gyl66f-228073001-000055
|
|
Project Title |
UPGRADING OF NATIONAL ENERGY INFORMATION SYSTEM:
|
|
|
Procurring Entity |
ENERGY COMMISSION OF NIGERIA
|
|
|
|
|
Budget Amount |
109,649,214.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
8,100,000.00
|
|
Contractor |
DARUMVIV ENERGY PROJECT LTD
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Completed
|
|
| |
|
475 |
|
OCID |
ocds-gyl66f-228073001-000059
|
|
Project Title |
CAPACITY BUILDING
|
|
|
Procurring Entity |
ENERGY COMMISSION OF NIGERIA
|
|
|
|
|
Budget Amount |
22,693,198.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
476 |
|
OCID |
ocds-gyl66f-19-000007
|
|
Project Title |
STUDY ON THE FEDERAL LEVEL CAPITAL PROJECT EXPENDITURE IN NIGERIA. PHASE II
|
|
|
Procurring Entity |
MINISTRY OF BUDGET AND NATIONAL PLANNING
|
|
|
|
|
Budget Amount |
30,000,000.00
NGN
|
|
Budget year |
2018
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
477 |
|
OCID |
ocds-gyl66f-19-000009
|
|
Project Title |
in-depth policy research research studies for evidence-Based Decision making (Informal Sector study
|
|
|
Procurring Entity |
MINISTRY OF BUDGET AND NATIONAL PLANNING
|
|
|
|
|
Budget Amount |
18,200,000.00
NGN
|
|
Budget year |
2018
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
478 |
|
OCID |
ocds-gyl66f-326003001-000005
|
|
Project Title |
PURCHASE OF COMPUTERS
|
|
|
Procurring Entity |
LEGAL AID COUNCIL
|
|
|
|
|
Budget Amount |
826,000.00
NGN
|
|
Budget year |
2018
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
479 |
|
OCID |
ocds-gyl66f-156006003-000044
|
|
Project Title |
Decommissioning of Abandoned Mast and Towers in the North
|
|
|
Procurring Entity |
NIGERIAN COMMUNICATION COMMISSION
|
|
|
|
|
Budget Amount |
200,000,000.00
NGN
|
|
Budget year |
2017
|
|
|
Project Amount |
200,000,000.00
|
|
Contractor |
Actelion Consulting Ltd
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
480 |
|
OCID |
ocds-gyl66f-119008001-000011
|
|
Project Title |
Purchase of 30 Seater Toyota Coaster Bus
|
|
|
Procurring Entity |
NIGERIAN INSTITUTE OF INTERNATIONAL AFFAIRS, LAGOS
|
|
|
|
|
Budget Amount |
25,000,000.00
NGN
|
|
Budget year |
2017
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
481 |
|
OCID |
ocds-gyl66f-156001001-000011
|
|
Project Title |
EXTENSION OF GOVERNMENT SERVICE PORTAL (GSP)
|
|
|
Procurring Entity |
MINISTRY OF COMMUNICATION AND DIGITAL ECONOMY HQTRS
|
|
|
|
|
Budget Amount |
52,019,574.00
NGN
|
|
Budget year |
2018
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
482 |
|
OCID |
ocds-gyl66f-227004001-000007
|
|
Project Title |
Youth Training
|
|
|
Procurring Entity |
NATIONAL PRODUCTIVITY CENTRE
|
|
|
|
|
Budget Amount |
15,000,000.00
NGN
|
|
Budget year |
2018
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Tender Stage
|
|
Status |
|
|
| |
|
483 |
|
OCID |
ocds-gyl66f-517021029-000003
|
|
Project Title |
3-IN-1 LABORATORY BUILDING
|
|
|
Procurring Entity |
FEDERAL UNIVERSITY OYE-EKITI
|
|
|
|
|
Budget Amount |
2,000,000,000.00
NGN
|
|
Budget year |
2018
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
484 |
|
OCID |
ocds-gyl66f-228073001-000076
|
|
Project Title |
MANPOWER DEVELOPMENT IN ENERGY SECTOR (CAPACITY BUILDING) 3
|
|
|
Procurring Entity |
ENERGY COMMISSION OF NIGERIA
|
|
|
|
|
Budget Amount |
40,378,463.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
485 |
|
OCID |
ocds-gyl66f-156006003-000049
|
|
Project Title |
IMPLEMENTATION OF ADAPTI PROGRAMME IN THE 7 TERTIARY INSTITUTIONS IN THE SOUTH WEST
|
|
|
Procurring Entity |
NIGERIAN COMMUNICATION COMMISSION
|
|
|
|
|
Budget Amount |
249,980,000.00
NGN
|
|
Budget year |
2017
|
|
|
Project Amount |
240,980,000.00
|
|
Contractor |
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
486 |
|
OCID |
ocds-gyl66f-228073001-000079
|
|
Project Title |
ECN HEADQUARTERS BUILDING - RENOVATION FOR EFFICIENT PERFORMANCE 3
|
|
|
Procurring Entity |
ENERGY COMMISSION OF NIGERIA
|
|
|
|
|
Budget Amount |
100,762,897.00
NGN
|
|
Budget year |
2018
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
487 |
|
OCID |
ocds-gyl66f-228073001-000081
|
|
Project Title |
ECN HEADQUARTERS BUILDING - RENOVATION FOR EFFICIENT PERFORMANCE
|
|
|
Procurring Entity |
ENERGY COMMISSION OF NIGERIA
|
|
|
|
|
Budget Amount |
100,762,897.00
NGN
|
|
Budget year |
2018
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
488 |
|
OCID |
ocds-gyl66f-227004001-000060
|
|
Project Title |
SUPPLY OF 500KVA TRANSFORMER TO INYE, OFUGO, EJEGBO AND ELECTRICFICATION OF OLUFOFO IN ANKPA LGA, KO
|
|
|
Procurring Entity |
NATIONAL PRODUCTIVITY CENTRE
|
|
|
|
|
Budget Amount |
50,000,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
489 |
|
OCID |
ocds-gyl66f-227004001-000064
|
|
Project Title |
SKILLS ACQUISITION TRAINING FOR WOMEN AND YOUTHS IN OMALA LGA KOGI STATE
|
|
|
Procurring Entity |
NATIONAL PRODUCTIVITY CENTRE
|
|
|
|
|
Budget Amount |
50,000,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
490 |
|
OCID |
ocds-gyl66f-156006003-000058
|
|
Project Title |
Implementation of Virtual Examination Centers in Selected Schools in Northern Nigeria
|
|
|
Procurring Entity |
NIGERIAN COMMUNICATION COMMISSION
|
|
|
|
|
Budget Amount |
229,960,105.00
NGN
|
|
Budget year |
2017
|
|
|
Project Amount |
229,960,105.00
|
|
Contractor |
Royal Value International Limited
|
|
|
Procurement Stage |
Implementation Stage
|
|
Status |
Ongoing
|
|
| |
|
491 |
|
OCID |
ocds-gyl66f-227004001-000070
|
|
Project Title |
SUPPLY OF ONE HILUX VAN FO ESAN WEST, ESAN CENTRAL AND IGUEBEN FEDERAL CONSTITUENCY EDO STATE
|
|
|
Procurring Entity |
NATIONAL PRODUCTIVITY CENTRE
|
|
|
|
|
Budget Amount |
30,000,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
492 |
|
OCID |
ocds-gyl66f-227004001-000080
|
|
Project Title |
SUPPLY OF LAPTOP TO YOUTH GRADUATES AND UNDERGRADUATES IN CROSS RIVER STATE
|
|
|
Procurring Entity |
NATIONAL PRODUCTIVITY CENTRE
|
|
|
|
|
Budget Amount |
45,000,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
493 |
|
OCID |
ocds-gyl66f-227004001-000082
|
|
Project Title |
EMPOWERMENT FOR YOUTH, WOMEN AND VULNERABLE PEOPLE IN DELTA SOUTH SENATORIAL DISTRICT DELTA STATE
|
|
|
Procurring Entity |
NATIONAL PRODUCTIVITY CENTRE
|
|
|
|
|
Budget Amount |
220,000,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
494 |
|
OCID |
ocds-gyl66f-228073001-000087
|
|
Project Title |
NATIONAL ENERGY SURVEYS 3
|
|
|
Procurring Entity |
ENERGY COMMISSION OF NIGERIA
|
|
|
|
|
Budget Amount |
161,363,489.00
NGN
|
|
Budget year |
2018
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
495 |
|
OCID |
ocds-gyl66f-227004001-000040
|
|
Project Title |
SUPPLY OF WHEEL CHAIRS AND EMPOWERMENT OF PHYSICALLY CHALLENGED PERSONS IN OWERRI FEDERAL CONSTITUEN
|
|
|
Procurring Entity |
NATIONAL PRODUCTIVITY CENTRE
|
|
|
|
|
Budget Amount |
66,500,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
496 |
|
OCID |
ocds-gyl66f-227004001-000041
|
|
Project Title |
YOUTH AND WOMEN EMPOWERMENT PROGRAMME IN ABOH
|
|
|
Procurring Entity |
NATIONAL PRODUCTIVITY CENTRE
|
|
|
|
|
Budget Amount |
19,000,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
497 |
|
OCID |
ocds-gyl66f-227004001-000052
|
|
Project Title |
CONSTRUCTION OF MOTORIZED BOREHOLE AT UMUCHIAKUMA IHECHIOWA IN AROCHUKWU/OHAFIA FEDERAL CONSTITUENCY
|
|
|
Procurring Entity |
NATIONAL PRODUCTIVITY CENTRE
|
|
|
|
|
Budget Amount |
14,250,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
498 |
|
OCID |
ocds-gyl66f-227004001-000053
|
|
Project Title |
YOUTH AND WOMEN EMPOWERMENT GRINDING MACHINE AND SEWING MACHINE IN YUARI/NGAKI/SHANGI LGA KEBBI STAT
|
|
|
Procurring Entity |
NATIONAL PRODUCTIVITY CENTRE
|
|
|
|
|
Budget Amount |
14,250,000.00
NGN
|
|
Budget year |
2019
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
499 |
|
OCID |
ocds-gyl66f-233003001-000004
|
|
Project Title |
SUPPLY AND INSTALLATION OF 400KVA GENERATOR TO NGSA HEADQUARTERS
|
|
|
Procurring Entity |
NIGERIAN GEOLOGICAL SURVEY AGENCY.
|
|
|
|
|
Budget Amount |
846,500,000.00
NGN
|
|
Budget year |
2017
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|
500 |
|
OCID |
ocds-gyl66f-233003001-000008
|
|
Project Title |
SUPPLY OF FURNITURES
|
|
|
Procurring Entity |
NIGERIAN GEOLOGICAL SURVEY AGENCY.
|
|
|
|
|
Budget Amount |
846,500,000.00
NGN
|
|
Budget year |
2017
|
|
|
Project Amount |
|
|
Contractor |
|
|
|
Procurement Stage |
Planning Stage
|
|
Status |
|
|
| |
|