| SN | OCID | Project Title | Budget Year | Currency | Budget Amount | Contract Value | Contractor | MDA | Project Status | Procurement Stage | Actions |
| 1 |
OCDS-GYL66F-0517018034-000001
| PROCUREMENT, TESTING, INSTALLATIONS AND FURNISHING FOR HOSPITALITY AND TOURISM WORKSHOP, CLASSROOMS; | 2023 | | 214,597,994.00 | 0.00 | | Federal Polytechnic Orogun, Delta State | | Planning Stage |
|
| 2 |
OCDS-GYL66F-0517018034-000003
| MASTER PLAN, ACADEMIC PLAN, STRATEGIC PLAN & NEED ASSESSMENT, ACCOUNTING | 2023 | | 19,800,000.00 | 0.00 | | Federal Polytechnic Orogun, Delta State | | Planning Stage |
|
| 3 |
OCDS-GYL66F-0517018034-000007
| PROCUREMENT OF 3 No. OF OPERATIONAL VEHICLES | 2023 | | 87,637,500.00 | 0.00 | | Federal Polytechnic Orogun, Delta State | | Planning Stage |
|
| 4 |
OCDS-GYL66F-0517018034-000010
| PROCUREMENT AND FURNISHING OF EQUIPMENT FOR FEMALE HOSTEL BUILDING | 2023 | NGN | 350,203,212.52 | 0.00 | | Federal Polytechnic Orogun, Delta State | | Planning Stage |
|
| 5 |
OCDS-GYL66F-0517018034-000011
| PROCUREMENT AND FURNISHING OF EQUIPMENT FOR MALE HOSTEL BUILDING | 2023 | NGN | 350,041,236.86 | 0.00 | | Federal Polytechnic Orogun, Delta State | | Planning Stage |
|
| 6 |
OCDS-GYL66F-0517018034-000012
| PROCUREMENT AND INSTALLATION OF LABORATORY EQUIPMENT FOR SCHOOL OF SCIENCE, ART AND MANAGEMENT | 2023 | NGN | 349,696,425.00 | 0.00 | | Federal Polytechnic Orogun, Delta State | | Planning Stage |
|
| 7 |
OCDS-GYL66F-0517018034-000013
| PROCUREMENT AND INSTALLATION OF ICT EQUIPMENT | 2023 | NGN | 417,763,705.00 | 0.00 | | Federal Polytechnic Orogun, Delta State | | Planning Stage |
|
| 8 |
OCDS-GYL66F-0517018034-000014
| PROCUREMENT AND INSTALLATION OF LABORATORY EQUIPMENT FOR MECHANICAL, CIVIL & SURVEY DEPARTMENT | 2023 | NGN | 329,556,150.00 | 0.00 | | Federal Polytechnic Orogun, Delta State | | Planning Stage |
|
| 9 |
OCDS-GYL66F-0517018034-000015
| PROCUREMENT AND COMMISSIONING OF MOVEMENT AND OPERATIONAL EQUIPMENT | 2023 | | 166,689,500.00 | 0.00 | | Federal Polytechnic Orogun, Delta State | | Planning Stage |
|
| 10 |
OCDS-GYL66F-0517018034-000016
| PROCUREMENT OF FURNITURES FOR CLASSROOMS & OFFICES | 2024 | | 240,000,000.00 | 0.00 | | Federal Polytechnic Orogun, Delta State | | Planning Stage |
|
| 11 |
OCDS-GYL66F-0517018034-000017
| Procurement of1No. Toyota Prado Land Cruiser | 2024 | | 110,000,000.00 | 0.00 | | Federal Polytechnic Orogun, Delta State | | Planning Stage |
|
| 12 |
OCDS-GYL66F-0517018034-000018
| Construction of Senate Building | 2024 | | 500,000,000.00 | 0.00 | | Federal Polytechnic Orogun, Delta State | | Planning Stage |
|
| 13 |
OCDS-GYL66F-0517018034-000019
| PROCUREMENT, INSTALLATION, TESTING AND COMMISSIONING OF OFFICE AND LABORATORY FURNITURES | 2024 | NGN | 149,756,850.00 | 0.00 | | Federal Polytechnic Orogun, Delta State | | Planning Stage |
|
| 14 |
OCDS-GYL66F-1-000001
| Purchase of Sedan | 2024 | | 79,000,000.00 | 0.00 | | NIGERIA DATA PROTECTION COMMISSION | | Planning Stage |
|
| 15 |
OCDS-GYL66F-1-000002
| Purchase of Pick-Up Truck | 2024 | NGN | 140,000,000.00 | 0.00 | | NIGERIA DATA PROTECTION COMMISSION | | Planning Stage |
|
| 16 |
OCDS-GYL66F-1-000003
| Working Tools | 2024 | NGN | 175,000,000.00 | 0.00 | | NIGERIA DATA PROTECTION COMMISSION | | Planning Stage |
|
| 17 |
OCDS-GYL66F-1-000004
| Supply and installation of security equipment | 2024 | NGN | 37,985,750.00 | 0.00 | | NIGERIA DATA PROTECTION COMMISSION | | Planning Stage |
|
| 18 |
OCDS-GYL66F-1-000005
| AWARENESS CAMPAIGNS FOR REGISTRATION OF DATA CONTROLLERS & PROCESSORS AND MASS SENSITIZATION/AWARENESS CAMPAIGN | 2024 | NGN | 41,700,000.00 | 0.00 | | NIGERIA DATA PROTECTION COMMISSION | | Planning Stage |
|
| 19 |
OCDS-GYL66F-1-000006
| Capacity Building for Staff | 2024 | NGN | 42,500,000.00 | 0.00 | | NIGERIA DATA PROTECTION COMMISSION | | Planning Stage |
|
| 20 |
OCDS-GYL66F-1-000007
| Purchase of Sedan 2 | 2024 | NGN | 79,000,000.00 | 0.00 | | NIGERIA DATA PROTECTION COMMISSION | | Planning Stage |
|
| 21 |
OCDS-GYL66F-1-000008
| AWARENESS CAMPAIGNS FOR REGISTRATION OF DATA CONTROLLERS & PROCESSORS AND MASS SENSITIZATION/AWARENESS CAMPAIGN BATCH 2 | 2024 | | 41,700,000.00 | 0.00 | | NIGERIA DATA PROTECTION COMMISSION | | Planning Stage |
|
| 22 |
OCDS-GYL66F-1-000009
| AWARENESS CAMPAIGNS FOR REGISTRATION OF DATA CONTROLLERS & PROCESSORS AND MASS SENSITIZATION/AWARENESS CAMPAIGN BATCH 3 | 2024 | | 41,700,000.00 | 0.00 | | NIGERIA DATA PROTECTION COMMISSION | | Planning Stage |
|
| 23 |
OCDS-GYL66F-1-000010
| AWARENESS CAMPAIGNS FOR REGISTRATION OF DATA CONTROLLERS & PROCESSORS AND MASS SENSITIZATION/AWARENESS CAMPAIGN BATCH 4 | 2024 | | 41,700,000.00 | 0.00 | | NIGERIA DATA PROTECTION COMMISSION | | Planning Stage |
|
| 24 |
OCDS-GYL66F-1-000011
| AWARENESS CAMPAIGNS FOR REGISTRATION OF DATA CONTROLLERS & PROCESSORS AND MASS SENSITIZATION/AWARENESS CAMPAIGN BATCH 5 | 2024 | | 41,700,000.00 | 0.00 | | NIGERIA DATA PROTECTION COMMISSION | | Planning Stage |
|
| 25 |
OCDS-GYL66F-1-000012
| AWARENESS CAMPAIGNS FOR REGISTRATION OF DATA CONTROLLERS & PROCESSORS AND MASS SENSITIZATION/AWARENESS CAMPAIGN BATCH 6 | 2024 | | 41,700,000.00 | 0.00 | | NIGERIA DATA PROTECTION COMMISSION | | Planning Stage |
|
| 26 |
OCDS-GYL66F-1-000013
| Furniture and Fittings | 2024 | | 250,000,000.00 | 0.00 | | NIGERIA DATA PROTECTION COMMISSION | | Planning Stage |
|
| 27 |
OCDS-GYL66F-1-000014
| Capacity building for staff batch 2 | 2024 | | 42,500,000.00 | 0.00 | | NIGERIA DATA PROTECTION COMMISSION | | Planning Stage |
|
| 28 |
OCDS-GYL66F-1-000015
| Capacity Building for staff Batch 3 | 2024 | | 42,500,000.00 | 0.00 | | NIGERIA DATA PROTECTION COMMISSION | | Planning Stage |
|
| 29 |
OCDS-GYL66F-1-000016
| Capacity Building Batch 4 | 2024 | | 42,500,000.00 | 0.00 | | NIGERIA DATA PROTECTION COMMISSION | | Planning Stage |
|
| 30 |
OCDS-GYL66F-1-000018
| TRAINING AND CERTIFICATIONS OF 1,500 DATA PROTECTION OFFICERS Batch 1 | 2024 | NGN | 49,200,000.00 | 0.00 | | NIGERIA DATA PROTECTION COMMISSION | | Planning Stage |
|
| 31 |
OCDS-GYL66F-1-000019
| TRAINING AND CERTIFICATIONS OF 1,500 DATA PROTECTION OFFICERS Batch 2 | 2024 | NGN | 49,200,000.00 | 0.00 | | NIGERIA DATA PROTECTION COMMISSION | | Planning Stage |
|
| 32 |
OCDS-GYL66F-1-000020
| TRAINING AND CERTIFICATIONS OF 1,500 DATA PROTECTION OFFICERS BATCH 3 | 2024 | NGN | 49,200,000.00 | 0.00 | | NIGERIA DATA PROTECTION COMMISSION | | Planning Stage |
|
| 33 |
OCDS-GYL66F-1-000021
| TRAINING AND CERTIFICATIONS OF 1,500 DATA PROTECTION OFFICERS BATCH 4 | 2024 | NGN | 49,200,000.00 | 0.00 | | NIGERIA DATA PROTECTION COMMISSION | | Planning Stage |
|
| 34 |
OCDS-GYL66F-1-000022
| TRAINING AND CERTIFICATIONS OF 1,500 DATA PROTECTION OFFICERS BATCH 5 | 2024 | NGN | 49,200,000.00 | 0.00 | | NIGERIA DATA PROTECTION COMMISSION | | Planning Stage |
|
| 35 |
OCDS-GYL66F-1-000023
| TRAINING AND CERTIFICATIONS OF 1,500 DATA PROTECTION OFFICERS BATCH 6 | 2024 | NGN | 49,200,000.00 | 0.00 | | NIGERIA DATA PROTECTION COMMISSION | | Planning Stage |
|
| 36 |
OCDS-GYL66F-1-000024
| TRAINING AND CERTIFICATIONS OF 1,500 DATA PROTECTION OFFICERS BATCH 7 | 2024 | NGN | 49,200,000.00 | 0.00 | | NIGERIA DATA PROTECTION COMMISSION | | Planning Stage |
|
| 37 |
OCDS-GYL66F-1-000025
| TRAINING AND CERTIFICATIONS OF 1,500 DATA PROTECTION OFFICERS BATCH 8 | 2024 | NGN | 49,200,000.00 | 0.00 | | NIGERIA DATA PROTECTION COMMISSION | | Planning Stage |
|
| 38 |
OCDS-GYL66F-1-000026
| TRAINING AND CERTIFICATIONS OF 1,500 DATA PROTECTION OFFICERS BATCH 9 | 2024 | NGN | 49,200,000.00 | 0.00 | | NIGERIA DATA PROTECTION COMMISSION | | Planning Stage |
|
| 39 |
OCDS-GYL66F-1-000027
| TRAINING AND CERTIFICATIONS OF 1,500 DATA PROTECTION OFFICERS BATCH 10 | 2024 | NGN | 49,200,000.00 | 0.00 | | NIGERIA DATA PROTECTION COMMISSION | | Planning Stage |
|
| 40 |
OCDS-GYL66F-1-000028
| TRAINING AND CERTIFICATIONS OF 1,500 DATA PROTECTION OFFICERS BATCH 11 | 2024 | NGN | 49,200,000.00 | 0.00 | | NIGERIA DATA PROTECTION COMMISSION | | Planning Stage |
|
| 41 |
OCDS-GYL66F-1-000029
| TRAINING AND CERTIFICATIONS OF 1,500 DATA PROTECTION OFFICERS BATCH 12 | 2024 | NGN | 49,200,000.00 | 0.00 | | NIGERIA DATA PROTECTION COMMISSION | | Planning Stage |
|
| 42 |
OCDS-GYL66F-1-000030
| TRAINING AND CERTIFICATIONS OF 1,500 DATA PROTECTION OFFICERS BATCH 13 | 2024 | NGN | 49,200,000.00 | 0.00 | | NIGERIA DATA PROTECTION COMMISSION | | Planning Stage |
|
| 43 |
OCDS-GYL66F-1-000031
| TRAINING AND CERTIFICATIONS OF 1,500 DATA PROTECTION OFFICERS BATCH 14 | 2024 | NGN | 49,200,000.00 | 0.00 | | NIGERIA DATA PROTECTION COMMISSION | | Planning Stage |
|
| 44 |
OCDS-GYL66F-1-000032
| TRAINING AND CERTIFICATIONS OF 1,500 DATA PROTECTION OFFICERS BATCH 15 | 2024 | NGN | 49,200,000.00 | 0.00 | | NIGERIA DATA PROTECTION COMMISSION | | Planning Stage |
|
| 45 |
OCDS-GYL66F-1-000033
| TRAINING AND CERTIFICATIONS OF 1,500 DATA PROTECTION OFFICERS BATCH 16 | 2024 | | 49,200,000.00 | 0.00 | | NIGERIA DATA PROTECTION COMMISSION | | Planning Stage |
|
| 46 |
OCDS-GYL66F-1-000034
| TRAINING AND CERTIFICATIONS OF 1,500 DATA PROTECTION OFFICERS BATCH 17 | 2024 | NGN | 49,200,000.00 | 0.00 | | NIGERIA DATA PROTECTION COMMISSION | | Planning Stage |
|
| 47 |
OCDS-GYL66F-1-000035
| TRAINING AND CERTIFICATIONS OF 1,500 DATA PROTECTION OFFICERS BATCH 18 | 2024 | NGN | 49,200,000.00 | 0.00 | | NIGERIA DATA PROTECTION COMMISSION | | Planning Stage |
|
| 48 |
OCDS-GYL66F-1-000036
| TRAINING AND CERTIFICATIONS OF 1,500 DATA PROTECTION OFFICERS BATCH 19 | 2024 | NGN | 49,200,000.00 | 0.00 | | NIGERIA DATA PROTECTION COMMISSION | | Planning Stage |
|
| 49 |
OCDS-GYL66F-1-000037
| TRAINING AND CERTIFICATIONS OF 1,500 DATA PROTECTION OFFICERS Batch 20 | 2024 | NGN | 49,200,000.00 | 0.00 | | NIGERIA DATA PROTECTION COMMISSION | | Planning Stage |
|
| 50 |
OCDS-GYL66F-1-000038
| TRAINING AND CERTIFICATIONS OF 1,500 DATA PROTECTION OFFICERS BATCH 21 | 2024 | NGN | 49,200,000.00 | 0.00 | | NIGERIA DATA PROTECTION COMMISSION | | Planning Stage |
|
| 51 |
OCDS-GYL66F-1-000039
| TRAINING AND CERTIFICATIONS OF 1,500 DATA PROTECTION OFFICERS BATCH 22 | 2024 | NGN | 49,200,000.00 | 0.00 | | NIGERIA DATA PROTECTION COMMISSION | | Planning Stage |
|
| 52 |
OCDS-GYL66F-1-000040
| TRAINING AND CERTIFICATIONS OF 1,500 DATA PROTECTION OFFICERS BATCH 23 | 2024 | NGN | 49,200,000.00 | 0.00 | | NIGERIA DATA PROTECTION COMMISSION | | Planning Stage |
|
| 53 |
OCDS-GYL66F-1-000041
| TRAINING AND CERTIFICATIONS OF 1,500 DATA PROTECTION OFFICERS BATCH 24 | 2024 | NGN | 49,200,000.00 | 0.00 | | NIGERIA DATA PROTECTION COMMISSION | | Planning Stage |
|
| 54 |
OCDS-GYL66F-1-000042
| TRAINING AND CERTIFICATIONS OF 1,500 DATA PROTECTION OFFICERS BATCH 25 | 2024 | NGN | 49,200,000.00 | 0.00 | | NIGERIA DATA PROTECTION COMMISSION | | Planning Stage |
|
| 55 |
OCDS-GYL66F-1-000043
| TRAINING AND CERTIFICATIONS OF 1,500 DATA PROTECTION OFFICERS BATCH 26 | 2024 | NGN | 49,200,000.00 | 0.00 | | NIGERIA DATA PROTECTION COMMISSION | | Planning Stage |
|
| 56 |
OCDS-GYL66F-1-000044
| TRAINING AND CERTIFICATIONS OF 1,500 DATA PROTECTION OFFICERS BATCH 27 | 2024 | NGN | 49,200,000.00 | 0.00 | | NIGERIA DATA PROTECTION COMMISSION | | Planning Stage |
|
| 57 |
OCDS-GYL66F-1-000045
| TRAINING AND CERTIFICATIONS OF 1,500 DATA PROTECTION OFFICERS BATCH 28 | 2024 | NGN | 49,200,000.00 | 0.00 | | NIGERIA DATA PROTECTION COMMISSION | | Planning Stage |
|
| 58 |
OCDS-GYL66F-1-000046
| TRAINING AND CERTIFICATIONS OF 1,500 DATA PROTECTION OFFICERS BATCH 29 | 2024 | NGN | 49,200,000.00 | 0.00 | | NIGERIA DATA PROTECTION COMMISSION | | Planning Stage |
|
| 59 |
OCDS-GYL66F-1-000047
| TRAINING AND CERTIFICATIONS OF 1,500 DATA PROTECTION OFFICERS BATCH 30 | 2024 | NGN | 49,200,000.00 | 0.00 | | NIGERIA DATA PROTECTION COMMISSION | | Planning Stage |
|
| 60 |
OCDS-GYL66F-10-000001
| Digitalization and Furnishing of Offices for DPPF, ICL, ICD, CCG, TOC, CAU | 2023 | | 1,096,456,345.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 61 |
OCDS-GYL66F-10-000002
| Equipping/Furninshing the Court Room and Judges Chambers in Kainji | 2023 | NGN | 1,096,456,345.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 62 |
OCDS-GYL66F-10-000003
| Equipping/Furnishing of Lagos Court | 2023 | | 1,096,456,345.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 63 |
OCDS-GYL66F-10-000005
| All-in-one Desktop computers, UPS, Printers, Extension boxes | 2023 | NGN | 72,687,322.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 64 |
OCDS-GYL66F-10-000006
| Procuring of Licences for 100 Users | 2023 | NGN | 10,000,000.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 65 |
OCDS-GYL66F-10-000007
| Purchase of Weekly Law Reports and Law References | 2023 | NGN | 6,971,793.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 66 |
OCDS-GYL66F-10-000008
| Purchase of Yearly Antivirus | 2023 | NGN | 6,800,000.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 67 |
OCDS-GYL66F-10-000009
| National Summit on Justice/National Policy on Justice 2023-2027 | 2023 | NGN | 20,500,000.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 68 |
OCDS-GYL66F-10-000011
| Renovation and Remodeling of the Toilets at FMOJ Headquarters | 2023 | NGN | 633,933,781.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 69 |
OCDS-GYL66F-10-000012
| Facelift and Renovation of the FMOJ Headquarters Building | 2023 | NGN | 633,933,781.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 70 |
OCDS-GYL66F-10-000013
| Renovation and Furnishing of Olusegun Obasanjo Hall, FMOJ Headquarters | 2023 | | 633,933,781.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 71 |
OCDS-GYL66F-10-000014
| Renovation and Facelift of Lagos Zonal Office | 2023 | NGN | 633,933,781.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 72 |
OCDS-GYL66F-10-000015
| Construction of Court Building at Kirikiri Medium Custodian Centre, Apapa, Lagos | 2023 | NGN | 1,096,456,345.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 73 |
OCDS-GYL66F-10-000017
| Construction of Dormitory for Rehabilitation of Repentant Terrorist at the Operation Safe Haven Derad Rehabilitation Camp, Mallam Sidi Camp, Gombe State | 2023 | NGN | 1,096,456,345.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 74 |
OCDS-GYL66F-10-000018
| Renovation, Remodelling and Furnishing of 2 Nos Married Officers Quarters at Giwa Barracks, Wawa Cantonment, Kainji, Niger State | 2023 | | 1,096,456,345.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 75 |
OCDS-GYL66F-10-000019
| Landscapping, water channeling and overall facelift for the Lagos Kirikiri Court | 2023 | | 1,096,456,345.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 76 |
OCDS-GYL66F-10-000020
| Purchase of Office Equipment & Gadgets | 2023 | NGN | 125,875,619.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 77 |
OCDS-GYL66F-10-000021
| Automation of SOP and Workflow (ECM) | 2023 | | 42,246,190.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 78 |
OCDS-GYL66F-10-000022
| Undertake Baseline Evaluation and Preparation of Country Reports on Torture in all Detention Centres in Nigeria | 2023 | | 162,356,631.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 79 |
OCDS-GYL66F-10-000023
| Speciliazed Capacity Building for Officers in mandate areas (Prosecution & Asset Mngt), Implementation of POCA, Development of POCA Regulations, etc. | 2023 | | 501,492,500.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 80 |
OCDS-GYL66F-10-000024
| Development of Central Database for Asset Management, Implementation of Template for Management of data on proceeds of crime, Upgrading of ARMU Office. | 2023 | | 501,492,500.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 81 |
OCDS-GYL66F-10-000025
| Consultancy services for the Review, Development and Finalization of Bills to Diversify the National Economy | 2023 | | 85,951,432.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 82 |
OCDS-GYL66F-10-000026
| Publication of Justice Journals, Law Report,News Letters etc. | 2023 | | 34,884,609.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 83 |
OCDS-GYL66F-10-000027
| Procurement, Management and Maintenance of CCTV | 2023 | | 72,687,322.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 84 |
OCDS-GYL66F-10-000028
| "ADVOCACY, SENSITIZATION PROGRAMMES, VISITATION, WORKSHOPS: in relation to Juevnile Homes, Mental Care homes, schools, communities, Correctional Facilities, etc. " | 2023 | | 33,292,916.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 85 |
OCDS-GYL66F-10-000029
| Printing and Distribution of FMOJ-FCAS Process & Procedures Manual 2023-100 volumes in hardcopy | 2023 | | 52,973,845.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 86 |
OCDS-GYL66F-10-000030
| Website Management | 2023 | | 72,687,322.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 87 |
OCDS-GYL66F-10-000031
| Electronic Documentation Management System of Archival Materials | 2023 | | 34,884,609.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 88 |
OCDS-GYL66F-10-000032
| Drawing of SOP and workflow | 2023 | | 42,246,190.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 89 |
OCDS-GYL66F-10-000033
| DOCUMENTARY/ NEWS COMMENTARY/ EDITORIAL ON MINISTRY’S LAUDABLE PROJECTS, ACTIVITIES AND ACHIEVEMENTS | 2023 | | 34,884,609.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 90 |
OCDS-GYL66F-10-000034
| Capacity Building for ECM Desk Officers | 2023 | | 42,246,190.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 91 |
OCDS-GYL66F-10-000035
| SPECIALISED CAPACITY BUILDING/WORKSHOP FOR STAFF ON INFORMATION MANAGEMENT AND STRATEGIC COMMUNICATION | 2023 | | 34,884,609.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 92 |
OCDS-GYL66F-10-000036
| Development and Adoption of the Gender Policy for the Federal Ministry of Justice | 2023 | | 33,292,916.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 93 |
OCDS-GYL66F-10-000037
| Capacity Building, Consultancy and Purchase of relevant resource materials to enhance the productivity and efficiency of State Counsels in various aspects of International Law, Trade, Criminal Justice | 2023 | | 66,320,550.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 94 |
OCDS-GYL66F-10-000038
| Consultancy Services for Production of Bill of Quantities and Supervision of the Rehabilitation of Existing Facilities at Kirikiri Medium Security Centre and a part of the Holding Centre in Ibadan Centre | 2023 | | 1,096,456,345.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 95 |
OCDS-GYL66F-10-000039
| Workshop on Child Protection and Child Justice Administration for Judicial Functionaries in the North Central Zone | 2023 | | 46,811,703.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 96 |
OCDS-GYL66F-10-000040
| Workshops On Development of Concept Note for The Implementation Of Non-Custodial Measures And Sentencing Guidelines Under Administration Of Criminal Justice Act, 2015 For Judges, Police Prosecutors, Federal Ministry Of Justice Prosecutors And Correctional Officers In All States Of The Federation To Be Held In Each Of The Six Geo-Political Zones | 2023 | | 46,811,703.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 97 |
OCDS-GYL66F-10-000041
| Consultancy Services for the Design and Supervision of the Construction of Domitory for Rehabilitation of Repentant Terrorist at the Operation Safe Haven Derado Rehabilitation Camp, Mallam Sidi LGA, Gombe State | 2023 | | 1,096,456,345.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 98 |
OCDS-GYL66F-10-000042
| Consultancy Services for the Design and Supervision, Renovation, Remodelling and Furnishing of Abandoned 2-Storey Building for the Trial of Terrorism Cases at Giwa Barracks, Wawa Cantonent, Kainji, Niger State | 2023 | | 1,096,456,345.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 99 |
OCDS-GYL66F-10-000043
| "Specialised training on ADR, SGBV and new Laws on Human Rights, celebration of both National and International days on Human Rights " | 2023 | | 33,292,916.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 100 |
OCDS-GYL66F-10-000044
| Large Fundamentals Workshops for Non-Lawyers, Procurement Officers, ICT Staff from MDAs | 2023 | | 52,973,845.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 101 |
OCDS-GYL66F-10-000046
| Workshop for Chief Executives and Induction for Ministers with handouts | 2023 | | 52,973,845.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 102 |
OCDS-GYL66F-10-000047
| Training and support services for Judges, Court Registry, Prosecutors, Interpreters, Security, Witnesses, and other Stakeholders | 2023 | | 162,356,631.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 103 |
OCDS-GYL66F-10-000048
| Develop Asset Mngt Guidelines | 2023 | | 501,492,500.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 104 |
OCDS-GYL66F-10-000049
| Transport & Logistics to Giwa Barracks, Wawa Cantonment, Kainji, Niger State | 2023 | | 1,096,456,345.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 105 |
OCDS-GYL66F-10-000051
| Implementation of the National Arbitration and Alternative Dispute Resolution Policy 2023 | 2023 | | 46,811,703.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 106 |
OCDS-GYL66F-10-000052
| General Policy Development, Prosecution, Monitoring and Enforcement. | 2023 | | 33,292,916.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 107 |
OCDS-GYL66F-10-000053
| Treaty Reporting Obligation, Preparation and processing of Instruments of Ratification and Accession for Mr President | 2023 | | 66,320,550.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 108 |
OCDS-GYL66F-10-000054
| Development of Case Management System | 2023 | | 162,356,631.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 109 |
OCDS-GYL66F-10-000055
| Handling of Extradition cases between Nigeria and other Countries | 2023 | | 66,320,550.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 110 |
OCDS-GYL66F-10-000056
| Engagement with Stakeholders, Workshops for Law Enforcement Agencies and Country Reporting Obligations under UPR | 2023 | | 162,356,631.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 111 |
OCDS-GYL66F-10-000058
| Conduct Case Assessment in Various Courts as well as Trainings for Magistrates, Police and Other Security Agencies | 2023 | | 46,811,703.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 112 |
OCDS-GYL66F-10-000059
| Participation in Statutory & other International engagements | 2023 | | 66,320,550.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 113 |
OCDS-GYL66F-10-000060
| Budget for Statutory Meetings & Annual Conferences | 2023 | | 125,875,619.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 114 |
OCDS-GYL66F-10-000061
| Engagements/Meetings on State-FGN matters by Body of Attorneys-General, General Council of the Bar, Forum of Solicitors-General | 2023 | | 85,951,432.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 115 |
OCDS-GYL66F-10-000062
| Expansion of the Ministry's Internet Bandwith | 2023 | | 72,687,322.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 116 |
OCDS-GYL66F-10-000063
| Office Running Cost Budget | 2023 | | 125,875,619.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 117 |
OCDS-GYL66F-10-000065
| Advocacy/Sensitization, Development of Country Report on NCAT, Engagement with Stakeholders on law enforcement and detention. Develop digital record management system | 2023 | | 1,096,456,345.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 118 |
OCDS-GYL66F-10-000066
| Payment for Legal Service by Legal Aid Council | 2023 | | 1,096,456,345.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 119 |
OCDS-GYL66F-10-000067
| Payment of Logistic /DTA/Transportation for Officers | 2023 | | 1,096,456,345.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 120 |
OCDS-GYL66F-10-000068
| Coordination of Activities involving AML/CFT, National Sanctions Committee & IMC. Participation in FATF/GIABA meetings/sessions. | 2023 | | 501,492,500.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 121 |
OCDS-GYL66F-10-000069
| Engagement of External Solicitors | 2023 | | 162,356,631.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 122 |
OCDS-GYL66F-10-000070
| Personnel Budget | 2023 | | 125,875,619.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 123 |
OCDS-GYL66F-10-000071
| Comprehensive Implementation of National Anti Corruption Strategy (NACS) Action Plan (2022 - 2026), Coordination of NACS Inter-Ministerial Committee | 2023 | | 501,492,500.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 124 |
OCDS-GYL66F-10-000072
| Engagement of External Solicitors and associated consultancies. | 2023 | | 501,492,500.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 125 |
OCDS-GYL66F-10-000073
| Payment of Logistics /DTA/Transportation for Officers (Foreign & Local) | 2023 | | 501,492,500.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 126 |
OCDS-GYL66F-10-000074
| Utilities and Consummables | 2023 | | 1,096,456,345.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 127 |
OCDS-GYL66F-10-000075
| Provision of Honorarium and Support Services for Judges, Witnesses, Interpreters , Security Personnel, Support Staff etc. during Trial | 2023 | | 1,096,456,345.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 128 |
OCDS-GYL66F-10-000076
| Consultancies/Training | 2024 | NGN | 55,566,410.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 129 |
OCDS-GYL66F-10-000077
| Repairs/Renovation of FMOJ Headquarters Building and Lagos zonal office | 2024 | | 971,946,606.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 130 |
OCDS-GYL66F-10-000078
| Completion of the Renovation of Olusegun Obasanjo Hall | 2024 | NGN | 971,946,606.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 131 |
OCDS-GYL66F-10-000080
| Rehabilitation/Replacement of FMOJ Headquarters Building Long Span Roof Sheets | 2024 | NGN | 971,946,606.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 132 |
OCDS-GYL66F-10-000081
| Document Degitalization, Data Entry,storage and archiving of files/record | 2024 | | 510,975,788.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 133 |
OCDS-GYL66F-10-000082
| Maintenance of Database | 2024 | NGN | 50,000,000.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 134 |
OCDS-GYL66F-10-000083
| Workshops on Asset Recovery and Management | 2024 | NGN | 50,000,000.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 135 |
OCDS-GYL66F-10-000084
| Information and communication Technology | 2024 | | 366,736,738,000.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 136 |
OCDS-GYL66F-10-000085
| Printing and Gazeting of Asset Recovery and Management Guidelines | 2024 | NGN | 50,000,000.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 137 |
OCDS-GYL66F-10-000086
| Completion of the construction of a creche at Federal Ministry of Justice Headquarters | 2024 | NGN | 971,946,606.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 138 |
OCDS-GYL66F-10-000087
| Meetings/Workshops | 2024 | NGN | 50,000,000.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 139 |
OCDS-GYL66F-10-000088
| Replacement of Headquarters Building VIP lift | 2024 | NGN | 971,946,606.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 140 |
OCDS-GYL66F-10-000089
| Boko Haram, Terrorism and related cases | 2024 | | 210,000,000.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 141 |
OCDS-GYL66F-10-000090
| Sensitization Workshop on the development of National Minimum Standards of the Implementation | 2024 | NGN | 400,194,871.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 142 |
OCDS-GYL66F-10-000091
| Stakeholders Engagement on approved National Minimum Standard for Effective Administration of Criminal Justices in Nigerial | 2024 | NGN | 400,194,871.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 143 |
OCDS-GYL66F-10-000092
| Peer Learning Workshop for Judges and Federal Prosecutors on Implementation of Plea Bargain Guidlines in Lagos State | 2024 | NGN | 400,194,871.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 144 |
OCDS-GYL66F-10-000093
| procurement of 30 seater coaster staff Bus and associated cost of insurance | 2024 | | 480,000,000.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 145 |
OCDS-GYL66F-10-000094
| Renovation of Toilets in the Federal Ministry of Justice Headquarters | 2024 | NGN | 971,946,606.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 146 |
OCDS-GYL66F-10-000095
| Technical Sessions/Workshop on the Development of Child Justice Act | 2024 | | 400,194,871.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 147 |
OCDS-GYL66F-10-000096
| Technical Workshop on Development of Diversionary guideline for Juveniles | 2024 | NGN | 400,194,871.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 148 |
OCDS-GYL66F-10-000097
| Renovation of Lagos Zonal Office | 2024 | NGN | 971,946,606.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 149 |
OCDS-GYL66F-10-000098
| Advocacy/Sensitization Workshop on the Youth and Children Correction Bill and Diversionery Measure | 2024 | NGN | 400,194,871.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 150 |
OCDS-GYL66F-10-000099
| Sensitization Workshop on Disarmament Demobilization and Reintegration | 2024 | NGN | 400,194,871.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 151 |
OCDS-GYL66F-10-000100
| Specialized Building/Workshops for Press and Public Relations Staff | 2024 | NGN | 130,975,788.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 152 |
OCDS-GYL66F-10-000101
| Ministerial Briefing | 2024 | NGN | 130,975,788.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 153 |
OCDS-GYL66F-10-000102
| Press and publications,library,law books,journals and archives | 2024 | | 130,975,788.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 154 |
OCDS-GYL66F-10-000103
| Annual Ministerial Score Card | 2024 | NGN | 130,975,788.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 155 |
OCDS-GYL66F-10-000104
| Strengthening the FMoJ Archival System i. Consultancy Services ii, Scanning/Storage of Data iii. Sorting Classifying, Labelling of Files iv. Procurement of Archival equipment and safety material | 2024 | NGN | 130,975,788.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 156 |
OCDS-GYL66F-10-000105
| ICT Training/Capacity Building | 2024 | NGN | 366,736,738.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 157 |
OCDS-GYL66F-10-000106
| Provision/Upgrade of CCTV and Accessories | 2024 | NGN | 366,736,738.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 158 |
OCDS-GYL66F-10-000107
| Completion of the Construction of a Sports Centre at Federal Ministry of Justice Headquarters | 2024 | NGN | 971,946,606.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 159 |
OCDS-GYL66F-10-000108
| procurement of working tools for press and public relations | 2024 | | 130,975,788.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 160 |
OCDS-GYL66F-10-000109
| Website Management: Upgrading/Installation of 2nd Layer security of the website and portals | 2024 | NGN | 366,736,738.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 161 |
OCDS-GYL66F-10-000110
| Workshops / Meetings | 2024 | NGN | 55,566,410.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 162 |
OCDS-GYL66F-10-000111
| Travels | 2024 | | 100,988,291.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 163 |
OCDS-GYL66F-10-000112
| procurement of judgement digest | 2024 | | 130,975,788.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 164 |
OCDS-GYL66F-10-000113
| Provision of Alternative Internet Facility | 2024 | NGN | 366,736,738.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 165 |
OCDS-GYL66F-10-000114
| compendium of judgement | 2024 | | 130,975,788.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 166 |
OCDS-GYL66F-10-000115
| Review of UNCAT, research, data analysis and compilation in preparation in preparation for submitting Nigeria's Country Report | 2024 | NGN | 150,000,000.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 167 |
OCDS-GYL66F-10-000116
| purchase of antivirus | 2024 | | 366,736,738.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 168 |
OCDS-GYL66F-10-000117
| Review of Anti-torture Act and develop a National Anti-Torture Policy | 2024 | NGN | 150,000,000.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 169 |
OCDS-GYL66F-10-000118
| provision of next generation firewall | 2024 | | 366,736,738.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 170 |
OCDS-GYL66F-10-000119
| ACJMC Staff Allowances for the Year 2024 Personal Budget | 2024 | | 75,000,001.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 171 |
OCDS-GYL66F-10-000120
| Overhead Cost for Office Running the year 2024 | 2024 | | 75,000,001.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 172 |
OCDS-GYL66F-10-000121
| Consultancy to develop manual for guidance on visiting places of detention, monitoring, documenting and reporting torture, cruel, inhuman and degrading treatment | 2024 | NGN | 150,000,000.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 173 |
OCDS-GYL66F-10-000122
| Statutory Quarterly Meeting | 2024 | | 75,000,001.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 174 |
OCDS-GYL66F-10-000123
| Solicitors/Witness/Expert Fees | 2024 | NGN | 322,000,000.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 175 |
OCDS-GYL66F-10-000124
| Citizens Rights Exchange Programme | 2024 | NGN | 150,000,000.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 176 |
OCDS-GYL66F-10-000125
| Hosting of Body of Attorney General Meeting | 2024 | NGN | 400,194,871.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 177 |
OCDS-GYL66F-10-000126
| Hosting of Meeting of General Counsel of the Bar | 2024 | NGN | 400,194,871.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 178 |
OCDS-GYL66F-10-000127
| Purchase of additional one (1) Fargo DTC4500e Dual sided identity card printing machine | 2024 | | 366,736,738.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 179 |
OCDS-GYL66F-10-000128
| Specialized Training on Alternative Dispute Resolution | 2024 | NGN | 150,000,000.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 180 |
OCDS-GYL66F-10-000129
| Treaty Monitoring Committee Meetings/Travels | 2024 | NGN | 280,000,000.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 181 |
OCDS-GYL66F-10-000130
| Implementation of the SOP ON PROSECUTION OF SGBVU Cases | 2024 | NGN | 150,000,000.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 182 |
OCDS-GYL66F-10-000131
| Accessed Contributions/Solicitors Fees | 2024 | NGN | 280,000,000.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 183 |
OCDS-GYL66F-10-000132
| Participation in the Ordinary Sessions of the AU & UN Committee against Torture and the African Commission | 2024 | NGN | 150,000,000.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 184 |
OCDS-GYL66F-10-000133
| Capacity Building on E-Procurement, E-Sourcing, Preparation of Solicitation Document, Co-ordination of Bids Opening, Evaluation and Selection Tender that meets best value for money and fitness purpose | 2024 | NGN | 195,294,431.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 185 |
OCDS-GYL66F-10-000134
| Specialized BPP Training for Procurement Officers | 2024 | NGN | 195,294,431.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 186 |
OCDS-GYL66F-10-000135
| Specialized Training on Budget Preparation using GIFMIS Sub-System for Budget Staff GL.07-17 | 2024 | NGN | 195,294,431.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 187 |
OCDS-GYL66F-10-000137
| Workshop for Stakeholders on Standard Operating Procedures (SOPs) | 2024 | NGN | 195,294,431.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 188 |
OCDS-GYL66F-10-000138
| Establishment of IPPIS-HR Module self services Centres in Zonal Offices | 2024 | NGN | 195,294,431.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 189 |
OCDS-GYL66F-10-000139
| Training and Certification of Solicitors Staff | 2024 | NGN | 195,294,431.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 190 |
OCDS-GYL66F-10-000140
| Training and Certification of Solicitors Staff in Financial Loan Agreement | 2024 | NGN | 195,294,431.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 191 |
OCDS-GYL66F-10-000141
| Specialized Training on Negotiation, Drafting and Vetting of Complex Contract | 2024 | NGN | 195,294,431.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 192 |
OCDS-GYL66F-10-000142
| Training of Civil Litigation Staff | 2024 | NGN | 195,294,431.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 193 |
OCDS-GYL66F-10-000143
| Electricity Charges | 2024 | | 96,885,333.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 194 |
OCDS-GYL66F-10-000144
| Office Stationeries/Computer Consumable | 2024 | | 115,101,515.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 195 |
OCDS-GYL66F-10-000145
| News papers | 2024 | | 19,032,765.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 196 |
OCDS-GYL66F-10-000146
| printing of non-security documents | 2024 | | 25,698,538.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 197 |
OCDS-GYL66F-10-000147
| Printing of Security Documents | 2024 | | 28,232,190.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 198 |
OCDS-GYL66F-10-000148
| Cleaning and fumigation services | 2024 | | 30,813,020.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 199 |
OCDS-GYL66F-10-000149
| Motor vehicle fuel cost | 2024 | | 42,232,220.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 200 |
OCDS-GYL66F-10-000150
| other transport equipment fuel cost | 2024 | | 25,681,236.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 201 |
OCDS-GYL66F-10-000151
| 1st quatre/generator fuel | 2024 | | 502,000,000.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 202 |
OCDS-GYL66F-10-000152
| 2nd Quarter plant/generator fuel cost | 2024 | | 502,000,000.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 203 |
OCDS-GYL66F-10-000153
| 3rd Quarter Plant/Generator Fuel Cost | 2024 | NGN | 502,000,000.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 204 |
OCDS-GYL66F-10-000154
| 4th Quarter Plant/Generator Fuel Cost | 2024 | NGN | 502,000,000.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 205 |
OCDS-GYL66F-10-000155
| Legal Services : Jan. Week 1 and 2 | 2024 | NGN | 4,647,274,480.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 206 |
OCDS-GYL66F-10-000156
| Legal Services (Jan week 3and 4) | 2024 | NGN | 4,647,274,480.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 207 |
OCDS-GYL66F-10-000157
| Legal Services : Feb Week 1 and 2 | 2024 | NGN | 4,647,274,480.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 208 |
OCDS-GYL66F-10-000158
| Legal Services February Week 3 & 4 | 2024 | NGN | 4,647,274,480.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 209 |
OCDS-GYL66F-10-000159
| Legal Services March Week 1 & 2 | 2024 | NGN | 4,647,274,480.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 210 |
OCDS-GYL66F-10-000161
| Legal Services April Week 1 & 2 | 2024 | NGN | 4,647,274,480.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 211 |
OCDS-GYL66F-10-000162
| Legal Services April Week 3 & 4 | 2024 | NGN | 4,647,274,480.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 212 |
OCDS-GYL66F-10-000163
| Legal Services May Week 1 & 2 | 2024 | NGN | 4,647,274,480.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 213 |
OCDS-GYL66F-10-000164
| Legal Services May Week 3 & 4 | 2024 | NGN | 4,647,274,480.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 214 |
OCDS-GYL66F-10-000165
| Legal Services June Week 1 & 2 | 2024 | NGN | 4,647,274,480.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 215 |
OCDS-GYL66F-10-000166
| Legal Services June Week 3 & 4 | 2024 | NGN | 4,647,274,480.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 216 |
OCDS-GYL66F-10-000167
| Legal Services July Week 1 & 2 | 2024 | NGN | 4,647,274,480.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 217 |
OCDS-GYL66F-10-000168
| Legal Services July Week 3 & 4 | 2024 | NGN | 4,647,274,480.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 218 |
OCDS-GYL66F-10-000169
| Legal Services August Week 1 & 2 | 2024 | NGN | 4,647,274,480.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 219 |
OCDS-GYL66F-10-000170
| legal Services September Week 1&2 | 2024 | | 4,647,274,480.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 220 |
OCDS-GYL66F-10-000172
| Legal Services September Week 3&4 | 2024 | | 4,647,274,480.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 221 |
OCDS-GYL66F-10-000173
| legal services week 3&4 | 2024 | | 4,647,274,480.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 222 |
OCDS-GYL66F-10-000174
| Legal Services November Week 1 & 2 | 2024 | NGN | 4,647,274,480.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 223 |
OCDS-GYL66F-10-000175
| Legal Services November Week 3 & 4 | 2024 | NGN | 4,647,274,480.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 224 |
OCDS-GYL66F-10-000176
| Legal Services October Week 1&2 | 2024 | | 4,647,274,480.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 225 |
OCDS-GYL66F-10-000177
| Legal Services October Week 3&4 | 2024 | | 4,647,274,480.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 226 |
OCDS-GYL66F-10-000178
| legal services December week 1&2 | 2024 | | 4,647,274,480.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 227 |
OCDS-GYL66F-10-000179
| legal services December week 3&4 | 2024 | | 4,647,274,480.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 228 |
OCDS-GYL66F-10-000180
| procurement of 1 No. Hilux and Associated cost of insurance | 2024 | | 4,647,274,480.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 229 |
OCDS-GYL66F-10-000181
| Additional Works for the Construction and Furnishing of Dormitory for Rehabilitation of Repentant Terrorist at Operation Safe Heaven Derad Rehabilitation and Registration Camo Mallam Sidi LGA, Gombe State | 2024 | NGN | 4,647,274,480.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 230 |
OCDS-GYL66F-10-000182
| Provision of logistics/Project vehicle for Boko Haram, Terrorism and associated cost of insurance | 2024 | NGN | 210,578,732.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 231 |
OCDS-GYL66F-10-000183
| Procurement of consultancies to review gas sales purchase agreement | 2024 | | 400,194,871.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 232 |
OCDS-GYL66F-10-000184
| Consultancies for the development of statutory instruments | 2024 | NGN | 100,988,291.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 233 |
OCDS-GYL66F-10-000185
| Conduct Trainings for the Magistrates, Police and other Security Agencies on the Implementation of Administration Criminal Justice Act (ACJA), 2015 in one State each of the Six Geopolitical Zones | 2024 | NGN | 400,197,871.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 234 |
OCDS-GYL66F-10-000186
| Training/consultancies for lawyers | 2024 | NGN | 322,000,000.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 235 |
OCDS-GYL66F-10-000187
| Establish of IPPIS-HR Module self service centers in zonal offices | 2024 | | 366,736,738.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 236 |
OCDS-GYL66F-10-000188
| Consultancies to update Laws of the Federation | 2024 | NGN | 161,676,246.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 237 |
OCDS-GYL66F-10-000189
| Specialized Training/Consultancies for Administration of Criminal Justice Reform (ACIR) | 2024 | NGN | 50,000,000.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 238 |
OCDS-GYL66F-10-000191
| Specialized ECM/PMS Training (Digitalization) | 2024 | NGN | 510,975,788.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 239 |
OCDS-GYL66F-10-000194
| Rehabilitation/Replacement of FMOJ Headquarters Building long span Roof Sheet and all associated works | 2024 | | 971,946,606.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 240 |
OCDS-GYL66F-10-000205
| Conversion of some Offices to Legal Clinics/Committee Rooms | 2024 | NGN | 4,647,274,480.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 241 |
OCDS-GYL66F-10-000206
| Renovation & Furnishing of Legal Directors Office and Others | 2024 | NGN | 4,647,274,480.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 242 |
OCDS-GYL66F-10-000207
| Renovation of Toilets in the Federal Ministry of Justice Headquarters Building | 2024 | NGN | 971,946,606.00 | 0.00 | | FEDERAL MINISTRY OF JUSTICE | | Planning Stage |
|
| 243 |
OCDS-GYL66F-111001001-000001
| Reconstruction and Furnishing the Security Building within the Villa including Extension od Bodyguar | 2018 | NGN | 42,628,061.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 244 |
OCDS-GYL66F-111001001-000002
| Purchase of Sporting Equipment for State House Sports Club. | 2018 | NGN | 24,032,925.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 245 |
OCDS-GYL66F-111001001-000003
| Renovation Work on 8 No. 2 B/R Flat at State House Security Quarters | 2018 | NGN | 284,587,922.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 246 |
OCDS-GYL66F-111001001-000004
| Provision of Network Infrastucture for old banquet hall (Conference Hall) | 2018 | NGN | 10,000,000.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 247 |
OCDS-GYL66F-111001001-000005
| Consultancy on Security Network with ASA Fundamentals | 2018 | NGN | 7,000,000.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 248 |
OCDS-GYL66F-111001001-000006
| Provision of Electronic Document Management System (EDMS) | 2018 | NGN | 93,659,025.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 249 |
OCDS-GYL66F-111001001-000007
| Fibre Connectivity to The Fire Service, Ceremonial Gate (MOPOL Office and Pilot Gate Lobby) | 2018 | NGN | 9,500,000.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 250 |
OCDS-GYL66F-111001001-000008
| Office Stationaries / Computer Consumables | 2021 | NGN | 480,534,575.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 251 |
OCDS-GYL66F-111001001-000009
| Purchase of Motor vehicle | 2021 | NGN | 336,264,142.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 252 |
OCDS-GYL66F-111001001-000010
| Maintenance Services | 2021 | NGN | 416,251,581.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 253 |
OCDS-GYL66F-111001001-000011
| Construction / Provision of Office Buildings | 2021 | NGN | 1,516,000,000.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 254 |
OCDS-GYL66F-111001001-000012
| Rehabilitation / Repair of Residential Buildings | 2021 | NGN | 133,713,138.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 255 |
OCDS-GYL66F-111001001-000013
| Rehabilitation /Repairs of Office Buildings | 2021 | NGN | 4,144,027,241.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 256 |
OCDS-GYL66F-111001001-000014
| Purchase of Sporting Equipment for State House Sport Club | 2021 | NGN | 25,502,944.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 257 |
OCDS-GYL66F-111001001-000015
| Procurement of Equipment for the Central Gymnasium | 2021 | NGN | 35,440,807.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 258 |
OCDS-GYL66F-111001001-000016
| Annual Routine Maintenance of Mechanical / Electrical Installation of the Villa | 2021 | NGN | 3,854,381,299.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 259 |
OCDS-GYL66F-111001001-000017
| Purchase of Various Office Equipment for the Admin. Finance & Accounts, Works, ICT, Procurement, PR | 2021 | NGN | 28,322,295.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 260 |
OCDS-GYL66F-111001001-000018
| Purchase of Tyres for Bullet Proof Vehicles, Plain Cars, CCU Vehicles Platform Trucks, Jeeps, Ambula | 2021 | NGN | 101,089,038.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 261 |
OCDS-GYL66F-111001001-000019
| Drugs and Medical Supplies | 2021 | NGN | 208,350,424.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 262 |
OCDS-GYL66F-111001001-000020
| Purchase of Health & Medical Equipment | 2021 | NGN | 201,813,271.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 263 |
OCDS-GYL66F-111001001-000021
| Construction / Provision of Hospitals /Health Centres | 2021 | NGN | 107,641,957.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 264 |
OCDS-GYL66F-111001001-000022
| Completion of Dental Wing Extension in SHMC and Outstanding liabilities on Reclamation and Earth Fil | 2021 | NGN | 107,641,957.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 265 |
OCDS-GYL66F-111001001-000023
| Purchase of Office Stationaries and Computer Consumables | 2022 | NGN | 79,075,135.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 266 |
OCDS-GYL66F-111001001-000024
| Maintenance of Motor Vehicle / Transport Equipment | 2022 | NGN | 165,072,123.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 267 |
OCDS-GYL66F-111001001-000025
| Maintenance of Office Buildings and Residential Qtrs. | 2022 | NGN | 104,861,276.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 268 |
OCDS-GYL66F-111001001-000026
| Purchase of Motor Vehicles | 2022 | | 1,600,000,000.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 269 |
OCDS-GYL66F-111001001-000027
| Purchase of Office Furniture and Fitting | 2022 | NGN | 69,656,180.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 270 |
OCDS-GYL66F-111001001-000028
| Purchase of Library Books & Equipment | 2022 | NGN | 31,585,505.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 271 |
OCDS-GYL66F-111001001-000029
| Purchase of Sporting / Gaming Equipment | 2022 | NGN | 34,155,787.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 272 |
OCDS-GYL66F-111001001-000031
| Replacement of Villa Telecommunications Infrastructure | 2022 | NGN | 380,000,000.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 273 |
OCDS-GYL66F-111001001-000033
| Outstanding Bandwidth Consumed | 2022 | NGN | 22,705,000.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 274 |
OCDS-GYL66F-111001001-000035
| Purchase of 4Nos Printers Photocopier | 2022 | NGN | 9,500,000.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 275 |
OCDS-GYL66F-111001001-000036
| Purchase of Shredder Machine, Spiral Binder, Vacuum Cleaners & Air Suckers | 2022 | NGN | 3,800,000.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 276 |
OCDS-GYL66F-111001001-000037
| Purchase of 2 Nos. Industrial Washing Machines | 2022 | NGN | 12,898,625.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 277 |
OCDS-GYL66F-111001001-000038
| Purchase of Public Address System, 3 Nos. Video Cameras, Presidential Teleprompter and 10 Nos Zoom H | 2022 | NGN | 24,104,540.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 278 |
OCDS-GYL66F-111001001-000039
| Strategic Communication Equipment for Effective Engagement of the Critical Stakeholders | 2022 | NGN | 49,518,784.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 279 |
OCDS-GYL66F-111001001-000040
| Construction of 2 Blocks of 24 Units 3 Bedroom Flats at the SHMC | 2022 | NGN | 52,250,000.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 280 |
OCDS-GYL66F-111001001-000041
| Purchase of 200kVA Sound Proof Generator | 2022 | NGN | 19,950,000.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 281 |
OCDS-GYL66F-111001001-000042
| Purchase of 1 No. 10kg Front Loader Wash and Dry Inverter Washing Machine and 6 Nos. LG Television S | 2022 | NGN | 28,725,154.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 282 |
OCDS-GYL66F-111001001-000043
| Purchase Of Sporting Equipment for State House Sports Club. | 2023 | NGN | 19,382,375.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 283 |
OCDS-GYL66F-111001001-000044
| Upgrade Of State House Library | 2023 | NGN | 25,023,505.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 284 |
OCDS-GYL66F-111001001-000045
| Rehabilitation Of Animal Enclosure/Procurement of Vet Lab Equipment | 2023 | NGN | 35,251,776.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 285 |
OCDS-GYL66F-111001001-000046
| Systematic Collection and Assessment of Data About Projects and Programmes to Aid Management to Make Decisions. | 2023 | NGN | 35,725,000.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 286 |
OCDS-GYL66F-111001001-000047
| Office Stationaries / Computer Consumables | 2023 | NGN | 30,446,461.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 287 |
OCDS-GYL66F-111001001-000048
| Printing of Non Security Documents | 2023 | | 30,446,461.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 288 |
OCDS-GYL66F-111001001-000050
| Srategic Communication Equipment for Effective Engagement of Critical Stakeholders | 2023 | NGN | 12,151,902.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 289 |
OCDS-GYL66F-111001001-000051
| Procurment of Security Network Access (Glass Stile, CCTV, Access Control, Speedstiles and Fill Height Turnstile) | 2023 | | 15,618,617.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 290 |
OCDS-GYL66F-111001001-000052
| Maintenance of Motor Vehicles / Transport Equipment | 2023 | | 22,447,556.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 291 |
OCDS-GYL66F-111001001-000053
| Completion of Dental Wing Extension in SHMC and Outstanding Liabilities on Reclamation and Earth filling | 2023 | | 15,000,000.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 292 |
OCDS-GYL66F-111001001-000054
| Procurement of Medical Equipment | 2023 | | 35,160,881.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 293 |
OCDS-GYL66F-111001001-000059
| Computer Software Acquisition | 2023 | | 96,611,311.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 294 |
OCDS-GYL66F-111001001-000061
| Renovation Work On 8 No. Blocks Of 16 No. 2 B/R Flats at State House Security Quarters. | 2023 | | 132,303,624.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 295 |
OCDS-GYL66F-111001001-000064
| Phased Replacement of Vehicles and Spares | 2023 | | 1,904,388,461.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 296 |
OCDS-GYL66F-111001001-000067
| Drugs and Medical Supplies | 2023 | | 188,350,424.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 297 |
OCDS-GYL66F-111001001-000068
| Uniforms and Other Clotings | 2023 | | 24,250,663.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 298 |
OCDS-GYL66F-111001001-000069
| Purchase of SUV Vehicles | 2023 | NGN | 28,000,000,000.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 299 |
OCDS-GYL66F-111001001-000070
| Purchase of Operational Vehicles (for close Aides of the President, the Vice President and their spouses) | 2023 | | 2,900,000,000.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 300 |
OCDS-GYL66F-111001001-000072
| Construction of Office Complex for within the State House | 2023 | | 4,000,000,000.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 301 |
OCDS-GYL66F-111001001-000073
| Renovation of Dodan Barracks Official Residence of the President | 2023 | | 4,000,000,000.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 302 |
OCDS-GYL66F-111001001-000074
| Renovation of the Vice Presidents Official Quarters in Lagos | 2023 | | 3,000,000,000.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 303 |
OCDS-GYL66F-111001001-000076
| Purchase of Official Vehicles for the Office of the First Lady | 2023 | | 1,500,000,000.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 304 |
OCDS-GYL66F-111001001-000077
| Office Stationaries / Computer Consumables | 2024 | | 66,719,333.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 305 |
OCDS-GYL66F-111001001-000078
| Printing of Non-Security Documents | 2024 | | 24,303,149.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 306 |
OCDS-GYL66F-111001001-000079
| Printing of Security Documents | 2024 | | 11,349,170.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 307 |
OCDS-GYL66F-111001001-000080
| Drugs and Medical Supplies | 2024 | | 63,882,198.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 308 |
OCDS-GYL66F-111001001-000081
| Maintenance of Motor Vehicles / Transport Equipment | 2024 | NGN | 129,635,017.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 309 |
OCDS-GYL66F-111001001-000082
| Maintenance of Office Furniture | 2024 | | 14,754,247.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 310 |
OCDS-GYL66F-111001001-000083
| Maintenance of Office Building / Residential QTRS | 2024 | | 153,445,827.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 311 |
OCDS-GYL66F-111001001-000084
| Maintenance of Office / IT Equipment | 2024 | | 45,140,972.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 312 |
OCDS-GYL66F-111001001-000085
| Maintenance of Plants / Generators | 2024 | | 18,939,608.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 313 |
OCDS-GYL66F-111001001-000086
| Purchase of Office Furnitures and Fittings | 2024 | | 83,156,180.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 314 |
OCDS-GYL66F-111001001-000087
| Procurement of Computers | 2024 | | 46,500,000.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 315 |
OCDS-GYL66F-111001001-000088
| Purchase of Library Books & Equipment | 2024 | | 47,785,505.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 316 |
OCDS-GYL66F-111001001-000089
| Purchase of Sports / Gaming Equipment | 2024 | | 54,155,787.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 317 |
OCDS-GYL66F-111001001-000090
| Purchase of Hello Spares / Maintenance | 2024 | | 351,084,550.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 318 |
OCDS-GYL66F-111001001-000091
| Rehabilitation / Repairs of Residential Buildings | 2024 | | 328,503,624.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 319 |
OCDS-GYL66F-111001001-000092
| Purchase of Sporting Equipment for State House Sports Club | 2024 | | 29,382,375.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 320 |
OCDS-GYL66F-111001001-000093
| Procurement of Equipment for the Central Gymnasium | 2024 | | 25,773,412.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 321 |
OCDS-GYL66F-111001001-000094
| Renovation work on 8 No. Blocks of 2 B/R Flats at State House Security Qtrs. | 2024 | | 328,508,624.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 322 |
OCDS-GYL66F-111001001-000095
| Construction of Office Complex for SAS and SSAS | 2024 | | 3,500,000,000.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 323 |
OCDS-GYL66F-111001001-000096
| Acquisition, Renovation Rehabilitation and Furnishing of State House Annex | 2024 | | 3,500,000,000.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 324 |
OCDS-GYL66F-111001001-000097
| Provision of Electronic Document Management System (EDMS) | 2024 | | 137,255,745.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 325 |
OCDS-GYL66F-111001001-000098
| Replacement of Villa Telecommunication Infrastructure | 2024 | | 100,000,000.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 326 |
OCDS-GYL66F-111001001-000099
| Upgrade of State House Library | 2024 | | 35,223,505.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 327 |
OCDS-GYL66F-111001001-000100
| Digital Medical References for the State House Library | 2024 | | 12,562,000.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 328 |
OCDS-GYL66F-111001001-000101
| Rehabilitation of Animal Enclosure / Procurement of VET LAB Equipment | 2024 | | 45,259,322.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 329 |
OCDS-GYL66F-111001001-000102
| Conversion / Upgrade of Villa Ranch and Construction of Wildlife Conservation Capture | 2024 | | 130,076,825.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 330 |
OCDS-GYL66F-111001001-000103
| Purchase of Plant Nursery Equipment for Production of Local Flowers for Routine Floral Arrangement, Irrigation and Upgrade of Helipad Grassfield | 2024 | | 26,117,800.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 331 |
OCDS-GYL66F-111001001-000104
| Systematic Collection and Assessment of Data about Projects and Programmes to Aid Management to Decisions | 2024 | | 68,725,000.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 332 |
OCDS-GYL66F-111001001-000105
| Annual Routine Maintenance of Mechanical / Electrical Installations | 2024 | | 9,200,045,297.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 333 |
OCDS-GYL66F-111001001-000106
| Purchase of Various Office Equipment for the Admin, Finance & Accounts, Works, ICT, Procurment, PRS and Audit Departments. | 2024 | | 83,156,180.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 334 |
OCDS-GYL66F-111001001-000107
| Purchase of Tyres for Bullet Proof Vehicles, Plain Cars, CCU Vehicles, Platform Trucks, Jeeps Ambulances and Other Utility and Operational Vehicles | 2024 | | 351,084,550.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 335 |
OCDS-GYL66F-111001001-000108
| Purchase of State House Operational Vehicles | 2024 | | 4,000,000,000.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 336 |
OCDS-GYL66F-111001001-000109
| Replacement of SUV Vehicles | 2024 | | 2,000,000,000.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 337 |
OCDS-GYL66F-111001001-000110
| Julius Berger Liabilites on Routine Maintenance 2022 & 2023 and Work as Directed 2022 - 2023 inclusive of Kaduna work | 2024 | | 4,500,000,000.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 338 |
OCDS-GYL66F-111001001-000111
| Puchase of Desktop Computers, Wireless Printers, Laptops, Fire-proof Cabinet and Various Office Equipment for Finance & Account and Internal Audit | 2024 | | 46,500,000.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 339 |
OCDS-GYL66F-111001001-000112
| Maintenance of Medical Equipment at the VIP Wing of State House Medical Centre | 2024 | | 150,000,000.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 340 |
OCDS-GYL66F-111001001-000113
| Renovation of President Quarters at the State House, Presidential Villa, Abuja | 2024 | | 500,000,000.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 341 |
OCDS-GYL66F-111001001-000114
| Maintenance of Buiding / Civil Infratructure / Mechanical / Electrical Fittings / Cleaning / Horticultural Services | 2024 | | 149,825,673.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 342 |
OCDS-GYL66F-111001001-000115
| Renovation of Vice President Qrts at State House Presidential Villa, Abuja. | 2024 | | 300,000,000.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 343 |
OCDS-GYL66F-111001001-000116
| Outstanding Bandwidth Consumed | 2024 | | 27,000,000.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 344 |
OCDS-GYL66F-111001001-000117
| Purchase of IT Equipment | 2024 | | 76,297,400.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 345 |
OCDS-GYL66F-111001001-000118
| Purchase of Photocopying Machines Accessories | 2024 | | 5,169,869.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 346 |
OCDS-GYL66F-111001001-000119
| Purchase of 1 Nos Printers Photocopiers | 2024 | | 7,125,000.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 347 |
OCDS-GYL66F-111001001-000120
| Purchase of Public Address System, 3 No's Video Cameras, Presidential Teleprompter and 10 Nos Zoom H4NSP Audio Recorder | 2024 | | 4,454,627.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 348 |
OCDS-GYL66F-111001001-000121
| Strategic Communication Equipment for Effective Engagement of the Critical Stakehlders | 2024 | | 52,000,000.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 349 |
OCDS-GYL66F-111001001-000122
| Procurement of Medical Equipment | 2024 | | 124,257,657.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 350 |
OCDS-GYL66F-111001001-000123
| Construction of 2 Blocks of 24 Units 3 Bedroom Flats at the SHMC | 2024 | | 231,000,000.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 351 |
OCDS-GYL66F-111001001-000124
| Constrution of Call Duty Doctors Qtrs for the State House Medical Centre | 2024 | | 200,000,000.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 352 |
OCDS-GYL66F-111001001-000125
| Facility Management Services at State House Medical Centre. | 2024 | | 85,000,000.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 353 |
OCDS-GYL66F-111001001-000126
| Reconstruction of the State House Clinic in the Lagos Liason Office | 2024 | | 50,000,000.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 354 |
OCDS-GYL66F-111001001-000127
| Routine Maintenance of the State House Lagos Facilites (Dodan Barracks, Lagos Liason Office) | 2024 | | 50,000,000.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 355 |
OCDS-GYL66F-111001001-000128
| Total Renovation / Overhauling of the Liason Office / Residence | 2024 | | 40,000,000.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 356 |
OCDS-GYL66F-111001001-000129
| Upgrade of CCTV / Communication for Security at Dodan Barracks | 2024 | | 10,000,000.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 357 |
OCDS-GYL66F-111001001-000130
| Provision of Treated Vehicles, Ambulances, Coasters Buses, SUV (8 Prado Jeeps) For Presidential / VIP Movements | 2024 | | 100,000,000.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 358 |
OCDS-GYL66F-111001001-000131
| Construction of Presidential Helipad at Dodan Barracks, Lagos Liason Office | 2024 | | 50,000,000.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 359 |
OCDS-GYL66F-111001001-000133
| Procurement / Installation of Photovoltaic Power to the State House | 2024 | | 36,000,000,000.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 360 |
OCDS-GYL66F-111001001-000134
| Procurement / Installation of Hybrid Solar Panel for The Supply of Alternative Power Supply to State House Medical Center, Asokoro and State House Clinic, Presidential Villa, Abuja | 2024 | | 9,600,000,000.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 361 |
OCDS-GYL66F-111001001-000135
| RENOVATION WORK ON 8 NO. BLOCKS OF 16 NO. 2 B/R FLATS AT STATE HOUSE SECURITY QUARTERS. | 2025 | | 120,283,774.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 362 |
OCDS-GYL66F-111001001-000139
| ACQUISITION, RENOVATION AND REHABILITATION OF EFCC FORFEITED PROPERTIES TO BE USED AS STATE HOUSE QUARTERS IN ABUJA | 2025 | | 1,830,783,061.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 363 |
OCDS-GYL66F-111001001-000141
| PURCHASE OF ADDITIONAL 4 NOS SCANNERS AND 4 NOS DESKTOPS COMPTERS FOR THE CHIEF OF STAFF REGISTRY | 2025 | | 20,000,000.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 364 |
OCDS-GYL66F-111001001-000142
| UPGRADE OF ACCESS CONTROL (LAN) HARDWARE IN STATE HOUSE (ID CARD UNIT) | 2025 | | 4,483,301.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 365 |
OCDS-GYL66F-111001001-000143
| PURCHASE OF MEDIA EQUIPMENT FOR THE PRESIDENTIAL MEDIA AND PUBLICITY UNIT. | 2025 | | 1,112,418.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 366 |
OCDS-GYL66F-111001001-000144
| PROCUREMENT AND INSTALLATION OF AUDITING SOFTWARE TOOLS - ( AUDIT MANAGEMENT SOLUTION) HAREWARE AND SOFTWARE INCLUSIVE OF TRAINING. | 2025 | | 38,446,444.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 367 |
OCDS-GYL66F-111001001-000145
| PROCUREMENT /MAINTENANCE OF EQUIPMENT FOR THE STATE HOUSE CENTRAL GYMNASIUM | 2025 | | 16,733,357.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 368 |
OCDS-GYL66F-111001001-000147
| PURCHASE OF TYRES FOR BULLET PROOF VEHICLES, PLAIN CARS, CCU VEHICLES, PLATFORM TRUCKS, JEEPS, AMBULANCES AND OTHER UTILITY AND OPERATIONAL VEHICLES. | 2025 | | 164,990,169.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 369 |
OCDS-GYL66F-111001001-000148
| PURCHASE OF STATE HOUSE OPERATIONAL VEHICLES | 2025 | | 3,661,566,123.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 370 |
OCDS-GYL66F-111001001-000150
| PROCUREMENT OF OPERATIONAL VEHICLES AT THE PRESIDENTIAL CONFERENCE CAR UNIT (CCU) FLEET, ABUJA | 2025 | | 127,864,107.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 371 |
OCDS-GYL66F-111001001-000151
| PROCUREMENT OF SUVS FOR MR. PRESIDENT AND VICE PRESIDENT | 2025 | | 127,864,107.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 372 |
OCDS-GYL66F-111001001-000152
| PURCHASE OF SHREDDING MACHINES | 2025 | | 4,000,000.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 373 |
OCDS-GYL66F-111001001-000153
| PURCHASE OF MOTOR VEHICLES | 2025 | | 285,000,000.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 374 |
OCDS-GYL66F-111001001-000154
| PURCHASE OF SECURITY AND OPERATIONAL VEHICLES | 2025 | | 179,633,225.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 375 |
OCDS-GYL66F-111001001-000155
| PURCHASE OF PMS & ECM EQUIPMENT AND ACCESSORIES | 2025 | | 366,156,612.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 376 |
OCDS-GYL66F-111001001-000156
| PURCHASE OF 2 NOS PHOTOCOPYING MACHINES (XEROX WORK CENTRE C7025 OR C7030) AND 4 NOS PRINTER PHOTOCOPIERS | 2025 | | 15,000,000.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 377 |
OCDS-GYL66F-111001001-000157
| PROCUREMENT OF SECURITY NETWORK ACCESS (GLASS STILE, CCTV, ACCESS CONTROL, SPEEDSTILES AND FULL HEIGHTTURNSTILE) | 2025 | | 47,153,721.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 378 |
OCDS-GYL66F-111001001-000158
| CONVERSION/UPGRADE OF VILLA RANCH AND CONSTRUCTION OF WILDLIFE CONSERVATION CAPTURE | 2025 | | 54,951,622.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 379 |
OCDS-GYL66F-111001001-000159
| PURCHASE OF VARIOUS OFFICE EQUIPMENT FOR THE ADMIN, FINANCE & ACCOUNTS WORKS, ICT, PROCUREMENT, PRS AND | 2025 | | 56,079,148.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 380 |
OCDS-GYL66F-111001001-000163
| DIGITAL MEDICAL REFERENCES FOR THE STATE HOUSE LIBRARY | 2025 | | 4,599,659.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 381 |
OCDS-GYL66F-111001001-000166
| DEVELOPMENT OF ARCHIVING SYSTEM | 2025 | | 121,650,000.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 382 |
OCDS-GYL66F-111001001-000174
| ANNUAL RENEWAL/UPGRADE OF COMPUTER SOFTWARE LICENCE | 2025 | | 45,000,000.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 383 |
OCDS-GYL66F-111001001-000185
| CONSTRUCTION OF CALL DUTY DOCTORS QUARTERS FOR THE STATE HOUSE MEDICAL CENTRE | 2025 | | 9,590,547.00 | 0.00 | | STATE HOUSE - HQTRS | | Planning Stage |
|
| 384 |
OCDS-GYL66F-111006001-000001
| Award of Contract for Supply of Cooking Gas (LPG) | 2018 | NGN | 2,660,000.00 | 0.00 | | NIPSS, KURU | | Planning Stage |
|
| 385 |
OCDS-GYL66F-111006001-000002
| 1-renovation of research fellows challet | 2019 | NGN | 24,225,000.00 | 0.00 | | NIPSS, KURU | | Planning Stage |
|
| 386 |
OCDS-GYL66F-111006001-000003
| 2-Renovation of Research fellows Challets | 2019 | NGN | 24,225,000.00 | 0.00 | | NIPSS, KURU | | Planning Stage |
|
| 387 |
OCDS-GYL66F-111006001-000004
| Purchase of Project Vehicle | 2019 | NGN | 68,400,000.00 | 49,400,000.00 | | NIPSS, KURU | Completed | Implementation Stage |
|
| 388 |
OCDS-GYL66F-111006001-000005
| Upgrading of Kitchen Equipment | 2019 | NGN | 19,000,000.00 | 18,500,000.00 | Cops Agro Ltd | NIPSS, KURU | Completed | Implementation Stage |
|
| 389 |
OCDS-GYL66F-111006001-000006
| 3 Renovation of participants chalets | 2019 | NGN | 24,225,000.00 | 0.00 | | NIPSS, KURU | | Planning Stage |
|
| 390 |
OCDS-GYL66F-111006001-000007
| Renovation of Participants Chalets | 2019 | NGN | 24,225,000.00 | 0.00 | | NIPSS, KURU | | Planning Stage |
|
| 391 |
OCDS-GYL66F-111006001-000008
| 5 renovation of participant chalet | 2019 | NGN | 24,225,000.00 | 0.00 | | NIPSS, KURU | | Planning Stage |
|
| 392 |
OCDS-GYL66F-111006001-000009
| 6 renovation of Participant Chalet | 2019 | NGN | 24,225,000.00 | 0.00 | | NIPSS, KURU | | Planning Stage |
|
| 393 |
OCDS-GYL66F-111006001-000010
| 3-Renovation of Research Fellows Chalets | 2019 | NGN | 29,260,000.00 | 0.00 | | NIPSS, KURU | | Planning Stage |
|
| 394 |
OCDS-GYL66F-111006001-000011
| 4-Renovation of Research Fellows Chalets | 2019 | NGN | 29,260,000.00 | 0.00 | | NIPSS, KURU | | Planning Stage |
|
| 395 |
OCDS-GYL66F-111006001-000012
| 5-Renovation of Research Fellowes Chalets | 2019 | NGN | 29,260,000.00 | 0.00 | | NIPSS, KURU | | Planning Stage |
|
| 396 |
OCDS-GYL66F-111006001-000013
| 6-Renovation of Research Fellows Chalets | 2019 | NGN | 29,260,000.00 | 0.00 | | NIPSS, KURU | | Planning Stage |
|
| 397 |
OCDS-GYL66F-111006001-000014
| Renovation, Refurbishing and Equiping of Library and ICT | 2022 | NGN | 35,930,395.00 | 0.00 | | NIPSS, KURU | | Planning Stage |
|
| 398 |
OCDS-GYL66F-111006001-000015
| Renovation of Research Fellows Quarters -Lot1 | 2022 | NGN | 90,250,000.00 | 29,130,950.00 | wework multi concept ltd | NIPSS, KURU | Completed | Implementation Stage |
|
| 399 |
OCDS-GYL66F-111006001-000016
| Renovation of Research Fellows Quarters -Lot2 | 2022 | NGN | 90,250,000.00 | 0.00 | | NIPSS, KURU | | Planning Stage |
|
| 400 |
OCDS-GYL66F-111006001-000017
| Renovation of Research Fellows Quarters -Lot3 | 2022 | NGN | 90,250,000.00 | 27,963,000.00 | rabsco logistics nig. ltd | NIPSS, KURU | Completed | Implementation Stage |
|
| 401 |
OCDS-GYL66F-111006001-000018
| Renovation of Participants Quarters -Lot2B | 2022 | NGN | 68,590,000.00 | 29,720,000.00 | d-kolus nigeria limited | NIPSS, KURU | Completed | Implementation Stage |
|
| 402 |
OCDS-GYL66F-111006001-000019
| Renovation of Participants Quarters -Lot2 | 2022 | NGN | 68,590,000.00 | 27,053,000.00 | randscope res limited | NIPSS, KURU | Completed | Implementation Stage |
|
| 403 |
OCDS-GYL66F-111006001-000020
| Equiping of Medical Center | 2022 | NGN | 18,050,000.00 | 18,000,000.00 | Surelink Mediquip Nig. Ltd | NIPSS, KURU | Completed | Implementation Stage |
|
| 404 |
OCDS-GYL66F-111006001-000021
| Research into Socio Economic Problems: Africa Climate Change Summit | 2022 | NGN | 63,175,000.00 | 0.00 | | NIPSS, KURU | | Planning Stage |
|
| 405 |
OCDS-GYL66F-111006001-000022
| Research into Socio Economic Problems: ii. Stake Holders Convention on the Crises in the Tertiary E | 2022 | NGN | 63,175,000.00 | 0.00 | | NIPSS, KURU | | Planning Stage |
|
| 406 |
OCDS-GYL66F-111006001-000023
| Online Course in Ledership for Selected Youth:i. Organizational Leadership Training for micro, small | 2022 | NGN | 40,740,000.00 | 0.00 | | NIPSS, KURU | | Planning Stage |
|
| 407 |
OCDS-GYL66F-111006001-000024
| Ressearch into the impact of COVID-19 on small business | 2022 | NGN | 27,698,078.40 | 0.00 | | NIPSS, KURU | | Planning Stage |
|
| 408 |
OCDS-GYL66F-111006001-000025
| Advocacy and Enlightenment on Peace Building for Political Parties Leadership | 2022 | NGN | 35,000,000.00 | 0.00 | | NIPSS, KURU | | Planning Stage |
|
| 409 |
OCDS-GYL66F-111006001-000026
| Construction of Boulder Round 3Km fence | 2022 | NGN | 70,000,000.00 | 29,461,718.75 | Libra integrated Global | NIPSS, KURU | Completed | Implementation Stage |
|
| 410 |
OCDS-GYL66F-111006001-000027
| Supply and Installation of CCTV with HD dome infrared Camaras with Wifi capability | 2022 | NGN | 37,000,000.00 | 0.00 | | NIPSS, KURU | | Planning Stage |
|
| 411 |
OCDS-GYL66F-111006001-000028
| Procurement of 2 Units of Operational Vehicles (30 seater coaster Bus) | 2022 | NGN | 193,000,000.00 | 169,000,000.00 | San-Afrah Nig. Ltd | NIPSS, KURU | Completed | Implementation Stage |
|
| 412 |
OCDS-GYL66F-111006001-000029
| Cleaning and fumigation Services | 2022 | NGN | 1,664,000.00 | 0.00 | | NIPSS, KURU | | Planning Stage |
|
| 413 |
OCDS-GYL66F-111006001-000030
| Local Travel and Transport: Training | 2022 | NGN | 31,070,000.00 | 0.00 | | NIPSS, KURU | | Planning Stage |
|
| 414 |
OCDS-GYL66F-111006001-000031
| Honorarium & Sitting Allowance | 2022 | NGN | 30,956,250.00 | 0.00 | | NIPSS, KURU | | Planning Stage |
|
| 415 |
OCDS-GYL66F-111006001-000032
| Local Training | 2022 | NGN | 27,296,000.00 | 0.00 | | NIPSS, KURU | | Planning Stage |
|
| 416 |
OCDS-GYL66F-111006001-000033
| NIPSS Participants Tour Allowance | 2022 | NGN | 426,576,000.00 | 0.00 | | NIPSS, KURU | | Planning Stage |
|
| 417 |
OCDS-GYL66F-111006001-000034
| Food Stuff/Caterng Materials Supplies | 2022 | NGN | 81,601,076.00 | 0.00 | | NIPSS, KURU | | Planning Stage |
|
| 418 |
OCDS-GYL66F-111006001-000035
| Financial Consulting | 2022 | NGN | 45,000,000.00 | 0.00 | | NIPSS, KURU | | Planning Stage |
|
| 419 |
OCDS-GYL66F-111006001-000036
| Magazines and Periodicals | 2022 | NGN | 446,400.00 | 0.00 | | NIPSS, KURU | | Planning Stage |
|
| 420 |
OCDS-GYL66F-111006001-000037
| Cooking Gas/Fuel Cost | 2022 | NGN | 3,325,000.00 | 5,939,375.00 | Shellengs Investment Ltd | NIPSS, KURU | Completed | Implementation Stage |
|
| 421 |
OCDS-GYL66F-111006001-000038
| Maintenance of motor vehicle/transport equipment | 2022 | | 4,009,040.00 | 0.00 | | NIPSS, KURU | | Planning Stage |
|
| 422 |
OCDS-GYL66F-111006001-000039
| Postages and Courier services | 2022 | NGN | 1,078,400.00 | 0.00 | | NIPSS, KURU | | Planning Stage |
|
| 423 |
OCDS-GYL66F-111006001-000040
| Telephone Charges | 2022 | NGN | 564,000.00 | 0.00 | | NIPSS, KURU | | Planning Stage |
|
| 424 |
OCDS-GYL66F-111006001-000041
| Office Stationeries/ Computer consumables | 2022 | NGN | 7,075,334.00 | 5,066,937.25 | Kee Items & Interior Ltd | NIPSS, KURU | Completed | Implementation Stage |
|
| 425 |
OCDS-GYL66F-111006001-000042
| Maintenance of of Office building/ Residential Qtrs | 2022 | NGN | 9,230,000.00 | 0.00 | | NIPSS, KURU | | Planning Stage |
|
| 426 |
OCDS-GYL66F-111006001-000043
| Local Travel and Transport: others | 2022 | NGN | 5,794,400.00 | 0.00 | | NIPSS, KURU | | Planning Stage |
|
| 427 |
OCDS-GYL66F-111006001-000045
| Maintenance of Office/ IT Equipment | 2022 | NGN | 1,776,000.00 | 0.00 | | NIPSS, KURU | | Planning Stage |
|
| 428 |
OCDS-GYL66F-111006001-000046
| Plant/Generator Fuel Cost | 2022 | NGN | 6,660,000.00 | 0.00 | | NIPSS, KURU | | Planning Stage |
|
| 429 |
OCDS-GYL66F-111006001-000047
| Sporting activities | 2022 | NGN | 945,500.00 | 0.00 | | NIPSS, KURU | | Planning Stage |
|
| 430 |
OCDS-GYL66F-111006001-000048
| Publicity and Advertisments | 2022 | NGN | 1,831,809.00 | 0.00 | | NIPSS, KURU | | Planning Stage |
|
| 431 |
OCDS-GYL66F-111006001-000049
| Subscription to professional Bodies | 2022 | NGN | 444,920.00 | 0.00 | | NIPSS, KURU | | Planning Stage |
|
| 432 |
OCDS-GYL66F-111006001-000050
| News Papers | 2022 | NGN | 445,500.00 | 0.00 | | NIPSS, KURU | | Planning Stage |
|
| 433 |
OCDS-GYL66F-111006001-000051
| books | 2022 | NGN | 1,692,800.00 | 9,450,000.00 | Hiit Plc | NIPSS, KURU | Completed | Implementation Stage |
|
| 434 |
OCDS-GYL66F-111006001-000052
| Internet Access Charge | 2022 | NGN | 5,265,000.00 | 0.00 | | NIPSS, KURU | | Planning Stage |
|
| 435 |
OCDS-GYL66F-111006001-000053
| Water Rates | 2022 | NGN | 1,168,000.00 | 0.00 | | NIPSS, KURU | | Planning Stage |
|
| 436 |
OCDS-GYL66F-111006001-000054
| Legal Services | 2022 | NGN | 9,000,000.00 | 0.00 | | NIPSS, KURU | | Planning Stage |
|
| 437 |
OCDS-GYL66F-111006001-000056
| Sewerage Charges | 2022 | NGN | 37,000,000.00 | 0.00 | | NIPSS, KURU | | Planning Stage |
|
| 438 |
OCDS-GYL66F-111006001-000057
| Electricity Charges | 2022 | NGN | 84,040,000.00 | 0.00 | | NIPSS, KURU | | Planning Stage |
|
| 439 |
OCDS-GYL66F-111006001-000058
| Maintenance of Plants /Generators | 2022 | NGN | 1,664,000.00 | 0.00 | | NIPSS, KURU | | Planning Stage |
|
| 440 |
OCDS-GYL66F-111006001-000059
| Maintenance of Office Furniture | 2022 | NGN | 2,448,000.00 | 0.00 | | NIPSS, KURU | | Planning Stage |
|
| 441 |
OCDS-GYL66F-111006001-000060
| Medical Expences | 2022 | NGN | 1,831,809.00 | 0.00 | | NIPSS, KURU | | Planning Stage |
|
| 442 |
OCDS-GYL66F-111006001-000061
| Welfare Package | 2022 | NGN | 888,502.00 | 0.00 | | NIPSS, KURU | | Planning Stage |
|
| 443 |
OCDS-GYL66F-111006001-000062
| Uniforms and other Clothing | 2022 | NGN | 2,334,000.00 | 0.00 | | NIPSS, KURU | | Planning Stage |
|
| 444 |
OCDS-GYL66F-111006001-000071
| Renovation of Reseaech Fellows Chalets1 | 2023 | NGN | 71,004,000.00 | 0.00 | | NIPSS, KURU | | Planning Stage |
|
| 445 |
OCDS-GYL66F-111006001-000072
| Renovation of Research Fellows Chalet2 | 2023 | NGN | 71,000,000.00 | 0.00 | | NIPSS, KURU | | Planning Stage |
|
| 446 |
OCDS-GYL66F-111006001-000073
| Renovation of Research Fellows Chalet3 | 2023 | NGN | 71,000,000.00 | 0.00 | | NIPSS, KURU | | Planning Stage |
|
| 447 |
OCDS-GYL66F-111006001-000076
| African Study Tour to Algeria | 2023 | NGN | 426,576,000.00 | 25,359,277.95 | Newland Travels and Tours Limited | NIPSS, KURU | Completed | Implementation Stage |
|
| 448 |
OCDS-GYL66F-111006001-000077
| Online Course in Leadership for Selected YOuth | 2023 | | 9,287,768.00 | 0.00 | | NIPSS, KURU | | Planning Stage |
|
| 449 |
OCDS-GYL66F-111006001-000078
| Supply of Office Stationaries and Consumables | 2023 | | 7,075,330.00 | 7,519,990.50 | Great Finger | NIPSS, KURU | Completed | Implementation Stage |
|
| 450 |
OCDS-GYL66F-111006001-000079
| Purchase of Books | 2023 | | 1,692,800.00 | 0.00 | | NIPSS, KURU | | Planning Stage |
|
| 451 |
OCDS-GYL66F-111006001-000080
| Pruchase of Magazines and Periodicals | 2023 | | 446,400.00 | 0.00 | | NIPSS, KURU | | Planning Stage |
|
| 452 |
OCDS-GYL66F-111006001-000081
| Purchase of News Papers | 2023 | | 445,500.00 | 0.00 | | NIPSS, KURU | | Planning Stage |
|
| 453 |
OCDS-GYL66F-111006001-000082
| Renovation of Research fellows Chalets | 2021 | | 85,799,598.00 | 0.00 | | NIPSS, KURU | | Planning Stage |
|
| 454 |
OCDS-GYL66F-111006001-000083
| Renovation of Participants chalets | 2021 | | 45,282,177.00 | 0.00 | | NIPSS, KURU | | Planning Stage |
|
| 455 |
OCDS-GYL66F-111006001-000084
| Renovation of Participants' Chalet | 2021 | | 45,282,177.00 | 0.00 | | NIPSS, KURU | | Planning Stage |
|
| 456 |
OCDS-GYL66F-111006001-000085
| Research and Development | 2021 | | 86,020,522.00 | 0.00 | | NIPSS, KURU | | Planning Stage |
|
| 457 |
OCDS-GYL66F-111006001-000086
| Upgrading of Political Parties Leadership Development Center | 2021 | | 86,020,522.00 | 0.00 | | NIPSS, KURU | | Planning Stage |
|
| 458 |
OCDS-GYL66F-111006001-000087
| Research in to Socio-Economic Problems | 2021 | | 146,433,895.00 | 0.00 | | NIPSS, KURU | | Planning Stage |
|
| 459 |
OCDS-GYL66F-111006001-000088
| Office Stationeries/ Computer Consumables | 2021 | | 7,075,334.00 | 0.00 | | NIPSS, KURU | | Planning Stage |
|
| 460 |
OCDS-GYL66F-111006001-000089
| Maintenance Services General | 2021 | | 22,127,040.00 | 0.00 | | NIPSS, KURU | | Planning Stage |
|
| 461 |
OCDS-GYL66F-111006001-000090
| Participants Qtrs Renovation | 2023 | | 200,000,000.00 | 0.00 | | NIPSS, KURU | | Planning Stage |
|
| 462 |
OCDS-GYL66F-111006001-000091
| particpant chalets Renovation | 2023 | | 200,000,000.00 | 0.00 | | NIPSS, KURU | | Planning Stage |
|
| 463 |
OCDS-GYL66F-111006001-000092
| Participants Qtrs Renovation4 | 2023 | | 200,000,000.00 | 0.00 | | NIPSS, KURU | | Planning Stage |
|
| 464 |
OCDS-GYL66F-111006001-000093
| Participants Qtrs Renovation5 | 2023 | | 200,000,000.00 | 0.00 | | NIPSS, KURU | | Planning Stage |
|
| 465 |
OCDS-GYL66F-111006001-000094
| Participants Qtrs Renovation6 | 2023 | | 200,000,000.00 | 0.00 | | NIPSS, KURU | | Planning Stage |
|
| 466 |
OCDS-GYL66F-111006001-000095
| Supply of Bus and Tricycle | 2023 | | 50,000,000.00 | 80,330,000.00 | San-Afrah Nig. Ltd | NIPSS, KURU | | Tender Stage |
|
| 467 |
OCDS-GYL66F-111006001-000096
| PURCHASE OF 6 (SIX) CYLINDER HILUX TRUCKS IN ALIMOSHO FEDERAL CONSTITUENCY, LAGOS STATE | 2023 | NGN | 50,000,000.00 | 0.00 | | NIPSS, KURU | | Planning Stage |
|
| 468 |
OCDS-GYL66F-111006001-000097
| African Study Tour to Mozambique | 2023 | NGN | 426,576,000.00 | 19,740,563.62 | Diplomat Travels and Tourism Agency | NIPSS, KURU | Completed | Implementation Stage |
|
| 469 |
OCDS-GYL66F-111006001-000097
| African Study Tour to Mozambique | 2023 | NGN | 426,576,000.00 | 19,740,563.62 | Diplomat Travels and Tourism Agency | NIPSS, KURU | Completed | Implementation Stage |
|
| 470 |
OCDS-GYL66F-111006001-000098
| African Study Tour to Liberia | 2023 | NGN | 426,576,000.00 | 11,391,209.55 | Hakintech Travels and Tours Ltd | NIPSS, KURU | Completed | Implementation Stage |
|
| 471 |
OCDS-GYL66F-111006001-000099
| African Study Tour to Malawi | 2023 | NGN | 426,576,000.00 | 26,537,328.52 | Zeekod Travels and Tours Nig, Ltd | NIPSS, KURU | Completed | Implementation Stage |
|
| 472 |
OCDS-GYL66F-111006001-000100
| African Study Tour to Guinea | 2023 | NGN | 426,576,000.00 | 15,644,264.30 | Transatlantic Logistics &Integrated Travel services Limited | NIPSS, KURU | Completed | Implementation Stage |
|
| 473 |
OCDS-GYL66F-111006001-000101
| African Study Tour to Cote D'ivoire | 2023 | NGN | 426,576,000.00 | 13,801,839.00 | Transatlantic Logistics &Integrated Travel services Limited | NIPSS, KURU | Completed | Implementation Stage |
|
| 474 |
OCDS-GYL66F-111006001-000102
| African Study Tour to Liberia (SG7) | 2023 | NGN | 426,576,000.00 | 14,861,230.00 | Diplomat Travels and Tourism Agency | NIPSS, KURU | Completed | Implementation Stage |
|
| 475 |
OCDS-GYL66F-111006001-000103
| Supply of cooking Gas to NIPSS Kitchen | 2023 | | 3,325,000.00 | 3,800,000.00 | De-Sammy Global Multibiz | NIPSS, KURU | Completed | Implementation Stage |
|
| 476 |
OCDS-GYL66F-111006001-000104
| Supply and installation of solar powered ups and street lighting | 2024 | NGN | 18,000,000.00 | 17,900,000.00 | Extra-Tech Global Resources Ltd | NIPSS, KURU | Completed | Implementation Stage |
|
| 477 |
OCDS-GYL66F-111006001-000105
| Purchase of Fire Trucks | 2024 | NGN | 53,800,000.00 | 0.00 | | NIPSS, KURU | | Planning Stage |
|
| 478 |
OCDS-GYL66F-111006001-000106
| Equipping of Media House | 2024 | NGN | 35,000,000.00 | 19,203,610.00 | Safi international Company | NIPSS, KURU | Completed | Implementation Stage |
|
| 479 |
OCDS-GYL66F-111006001-000107
| Replacement of 43-year-old underground electricity cables -About 10KM | 2024 | NGN | 20,000,000.00 | 19,850,000.00 | Kobavi Ltd | NIPSS, KURU | Completed | Implementation Stage |
|
| 480 |
OCDS-GYL66F-111006001-000108
| Rehabilitation of the fence, construction of plinths round the Institute perimeter fence. | 2024 | NGN | 30,000,000.00 | 29,950,000.00 | Eurobel International Ltd | NIPSS, KURU | Completed | Implementation Stage |
|
| 481 |
OCDS-GYL66F-111006001-000109
| : Renovation of participants Qtrs | 2024 | NGN | 90,000,000.00 | 89,914,972.00 | Extract Imaging Ltd | NIPSS, KURU | Completed | Implementation Stage |
|
| 482 |
OCDS-GYL66F-111006001-000110
| Renovation of Research Fellows Quarters Lot 4 | 2024 | NGN | 70,000,000.00 | 69,936,436.00 | 5. Santali Technology Solutions Ltd | NIPSS, KURU | Completed | Implementation Stage |
|
| 483 |
OCDS-GYL66F-111006001-000111
| Lot4B: Renovation of Research Fellows Quarters – LKS3&4 | 2024 | NGN | 70,000,000.00 | 0.00 | | NIPSS, KURU | | Planning Stage |
|
| 484 |
OCDS-GYL66F-111006001-000112
| Lot4C: Renovation of Research Fellows Quarters – LKS5&6 | 2024 | NGN | 70,000,000.00 | 0.00 | | NIPSS, KURU | | Planning Stage |
|
| 485 |
OCDS-GYL66F-111006001-000113
| Research on industrialization, digital economy and job creation covering 774 LGA’s (N1N.68M/LGA) | 2024 | NGN | 637,642,763.40 | 0.00 | | NIPSS, KURU | | Planning Stage |
|
| 486 |
OCDS-GYL66F-111006001-000114
| Research on industrialization, digital economy and job creation covering 774 LGA’s (N1N.68M/LGA) | 2024 | NGN | 637,642,763.40 | 0.00 | | NIPSS, KURU | | Planning Stage |
|
| 487 |
OCDS-GYL66F-111006001-000115
| Research into Socio Economic Problems | 2024 | | 39,306,415.00 | 0.00 | | NIPSS, KURU | | Planning Stage |
|
| 488 |
OCDS-GYL66F-111006001-000116
| Research into Socio Economic Problems | 2024 | | 39,306,415.00 | 0.00 | | NIPSS, KURU | | Planning Stage |
|
| 489 |
OCDS-GYL66F-111006001-000117
| PURCHASE OF ADDITIONAL LAPTOPS AND EXTERNAL HARD DRIVES | 2024 | NGN | 9,990,625.00 | 9,990,625.00 | GISGOOD | NIPSS, KURU | Completed | Implementation Stage |
|
| 490 |
OCDS-GYL66F-111006001-000118
| PURCHASE OF NEW LAPTOPS AND PHOTOCOPIER | 2024 | | 10,000,000.00 | 9,887,250.00 | BIOGOLD NIGERIA LIMITED | NIPSS, KURU | Completed | Implementation Stage |
|
| 491 |
OCDS-GYL66F-111006001-000119
| PURCHASE OF NEW OFFICE FURNITURE | 2024 | NGN | 10,000,000.00 | 9,776,856.25 | FYK CONSTRUCTION NIG. LTD | NIPSS, KURU | Completed | Implementation Stage |
|
| 492 |
OCDS-GYL66F-111008001-000001
| NIGERIA MISSION CONTROL CENTRE UPGRADE | 2019 | NGN | 114,837,821.00 | 0.00 | | NATIONAL EMERGENCY MANAGEMENT AGENCY (NEMA) | | Planning Stage |
|
| 493 |
OCDS-GYL66F-111008001-000031
| Purchase of 42 Toner for the whole Agency | 2021 | NGN | 5,383,729.00 | 0.00 | | NATIONAL EMERGENCY MANAGEMENT AGENCY (NEMA) | | Planning Stage |
|
| 494 |
OCDS-GYL66F-111008001-000032
| procurement of 13no mobile intensive care unit(MICU) Ambulance | 2021 | NGN | 583,607,500.00 | 0.00 | | NATIONAL EMERGENCY MANAGEMENT AGENCY (NEMA) | | Planning Stage |
|
| 495 |
OCDS-GYL66F-111008001-000033
| Procurement and Installation of Strategic Communication Equipment | 2021 | NGN | 152,143,441.00 | 0.00 | | NATIONAL EMERGENCY MANAGEMENT AGENCY (NEMA) | | Planning Stage |
|
| 496 |
OCDS-GYL66F-111008001-000034
| Procurement of Personal Protective Equipment | 2021 | NGN | 782,691,544.00 | 0.00 | | NATIONAL EMERGENCY MANAGEMENT AGENCY (NEMA) | | Planning Stage |
|
| 497 |
OCDS-GYL66F-111008001-000035
| Procurement of 6. Nos. Incident Response Vehicles | 2021 | NGN | 190,375,000.00 | 0.00 | | NATIONAL EMERGENCY MANAGEMENT AGENCY (NEMA) | | Planning Stage |
|
| 498 |
OCDS-GYL66F-111008001-000036
| Procurement of SAR Inflatable and Speed Boat | 2021 | NGN | 782,691,544.00 | 0.00 | | NATIONAL EMERGENCY MANAGEMENT AGENCY (NEMA) | | Planning Stage |
|
| 499 |
OCDS-GYL66F-111008001-000037
| Procurement and Installation of Strategic Communication Equipment | 2022 | NGN | 2,104,957,560.00 | 0.00 | | NATIONAL EMERGENCY MANAGEMENT AGENCY (NEMA) | | Planning Stage |
|
| 500 |
OCDS-GYL66F-111008001-000038
| procurement of 6 nos. Incident Response Vehicles | 2022 | NGN | 2,104,957,560.00 | 0.00 | | NATIONAL EMERGENCY MANAGEMENT AGENCY (NEMA) | | Planning Stage |
|